Claim Missing Document
Check
Articles

Found 4 Documents
Search

Sosialisasi Early Warning System Longsor di Kelurahan Ngemplak Simongan Kota Semarang Fitria Maya Lestari; Etika Herdiarti; Sutik Sutik
Jurnal Pengabdian KOLABORATIF Vol. 3 No. 1 (2025): January
Publisher : Faculty of Engineering, Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/jpk.v3i1.11647

Abstract

Natural disasters are a threat to the people in Semarang City. Especially in areas that have complex topographical characteristics such as in the Ngemplak Simongan village area of Semarang City. Some of these areas are in conditions that have steep slopes and are in cliff areas. The Community Service activities provide socialization related to the landslide Early Warning System. An Early Warning System (EWS) is a system that informs the occurrence of natural disasters. The socialization activity aims to provide knowledge of making a simple EWS that can be made by the affected community in detecting landslides early. The socialization succeeded in increasing the knowledge of how the early warning system works. Residents can understand the necessary EWS components through training, evacuation drills, and EWS tool introduction materials. The data collected showed that the technique used was successful, although there were residents who still did not understand, it could effectively increase residents' knowledge.
Bimbingan Teknis Peningkatan Kompetensi Pengawasan Pekerjaan Konstruksi Pembangunan Kampung Nelayan Merah Putih Ferry Firmawan; Hendra Masvika; Sutik; Purwanto Purwanto; Dhini Rahmahajsuly; Maesa Widiyafi; Cahya Hari Prayoga
Jurnal Pengabdian KOLABORATIF Vol. 4 No. 2 (2026): July
Publisher : Faculty of Engineering, Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/kolaboratif.v4i2.13815

Abstract

The development of the Kampung Nelayan Merah Putih project in the coastal area of Centra Java faces significant challenges, including land subsidence, tidal flooding, and highly saline environmental conditions that may reduce infrastructure durability. These conditions require competent construction supervision to ensure project quality, schedule, and cost performance. This Community Service Program aimed to enhance the technical and managerial competencies of personnel from the Semarang Fishing Port Center (BBPI) through technical guidance on construction supervision. The program consisted of three stages: dissemination of construction quality management principles, training on field inspection methods and technical administration, and stakeholder coordination to harmonize supervision practices. Program effectiveness was evaluated using pre-test and post-test assessments involving 22 participants who completed 18 questions. The results demonstrated a substantial improvement in participants' knowledge, with the mean score increasing from 59.77 (62.9% of the maximum score) to 81.59 (85.9%), representing a gain of 21.82 points (36.5%). The minimum score increased from 50 to 70, and no participant scored below 70 in the post-test. The training also strengthened participants' shared understanding of quality control, contract administration, field inspection, and the achievement of the project's triple constraints. These findings indicate that the technical guidance effectively improved construction supervision competencies and contributed to more professional, accountable, and sustainable management of coastal infrastructure projects.
Pelatihan Manajemen Resiko bagi Pekerja Konstruksi Gudang Bulog Kabupaten Demak (Penyusunan Rencana Keselamatan Konstruksi Pra Desain) Sutik; Fitria Maya Lestari; Etika Herdiarti; Nuryanto Sasmito S
Jurnal Pengabdian KOLABORATIF Vol. 4 No. 1 (2026): January
Publisher : Faculty of Engineering, Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/kolaboratif.v4i1.12739

Abstract

Risk management is defined as a systematic process that includes planning, organizing, leading, and controlling organizational activities to minimize the likelihood of revenue loss. PT Mustiko Klopo Jati faces challenges related to improving construction risk management practices. The implementation of this activity is carried out in the Bulog Warehouse Construction Project. The objective of this community service program (PKM) is to provide risk management training with a focus on the preparation of the Construction Safety Plan (RKK). This training aims to enhance participants’ knowledge in preparing RKK documents in accordance with the latest regulatory standards. Before the training, 48% of participants had a limited understanding of the RKK preparation process; following the training, the level of understanding among construction practitioners increased to 85%. It is expected that this activity will provide solutions to the identified problems and foster effective collaboration with industry partners, thereby contributing to innovation in the implementation of efficient and appropriate construction practices.
VALIDASI PANJANG ANTRIAN SIMPANG APILL BERDASARKAN PENGUKURAN EMPIRIS DAN PKJI 2023: VALIDATION OF SIGNALIZED INTERSECTION QUEUE LENGTH USING FIELD MEASUREMENTS AND THE 2023 INDONESIAN HIGHWAY CAPACITY GUIDELINES Etik Herdiati; Iin Irawati; Sutik
Jurnal Teknik Sipil : Rancang Bangun Vol. 12 No. 02 (2026): Oktoer 2026
Publisher : Universitas Muhammadiyah Sorong

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Panjang antrean merupakan indikator penting untuk mengevaluasi kinerja simpang dengan Alat Pemberi Isyarat Lalu Lintas (APILL). Perbedaan antara panjang antrean hasil pengamatan lapangan dan hasil perhitungan menggunakan pedoman kapasitas dapat memengaruhi ketepatan evaluasi kinerja simpang. Penelitian ini bertujuan memvalidasi panjang antrean hasil pengukuran empiris terhadap hasil analisis berdasarkan Pedoman Kapasitas Jalan Indonesia (PKJI) 2023. Penelitian dilakukan pada simpang Majapahit dan simpang Soekarno Hatta di Kota Semarang. Data dikumpulkan melalui survei volume lalu lintas, geometri pendekat, waktu sinyal, dan pengukuran panjang antrean pada hari Senin, Rabu, dan Sabtu pukul 16.30–17.30. Analisis dilakukan dengan menghitung arus lalu lintas, kapasitas, derajat kejenuhan, serta panjang antrean berdasarkan PKJI 2023. Validasi menggunakan Mean Absolute Percentage Error (MAPE), dengan panjang antrean empiris sebagai nilai aktual. Hasil menunjukkan panjang antrean hasil perhitungan PKJI 2023 berada pada rentang 81–184 m, sedangkan hasil pengamatan empiris berada pada rentang 64–155 m. Rata-rata MAPE dari 24 pasangan pengamatan mencapai 30,39%. Hasil ini menunjukkan adanya perbedaan yang berarti antara estimasi pedoman dan kondisi lapangan. Evaluasi lebih lanjut terhadap parameter kapasitas, khususnya arus jenuh dasar dan faktor penyesuaiannya, diperlukan sebelum hasil analisis digunakan untuk pengambilan keputusan rekayasa lalu lintas.