ANALISIS METODE EARNED VALUE UNTUK DURASI PENYELESAIAN PEMBANGUNAN PROYEK X DI KARAWANG Tanuwihardjo, Gervan Abraham; Anondho, Basuki; Sutandi, Arianti
JMTS: Jurnal Mitra Teknik Sipil Volume 8, Nomor 2, Mei 2025
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v8i2.33226

Abstract

One of the main targets of project is success on time. Delays in construction projects can cause time and cost losses for parties such as contractors and owners. The earned value method was created to estimate the project completion time. Earned value management is one of the approaches developed as a tool for time management in a project. This study focuses on how to use earned value management to control the time and cost of the office and factory construction project in Karawang. The analysis in this study specifically discusses the delays and progress of the office and factory project, which has a planned duration of 44 weeks. The analysis using the earned value method yields predictions of the final project duration during the delay weeks and acceleration weeks. In the delay weeks from week 33 to week 37, the predicted final duration of the project exceeded the initial planned time. Meanwhile, in the acceleration weeks from week 38 to week 43, the predicted final duration of the project showed results less than the initial planned time. This delay was caused by fewer workers than planned, resulting in project delays, and during the acceleration weeks, additional workers were added to the project, leading to a good final duration prediction. Abstrak Salah satu ukuran utama keberhasilan proyek adalah waktu. Keterlambatan proyek konstruksi dapat menyebabkan kerugian waktu dan biaya bagi pihak-pihak seperti kontraktor dan owner. Metode Earned Value dibuat untuk memperkirakan waktu penyelesaian proyek. Earned Value management adalah salah satu pendekatan yang dikembangkan sebagai alat untuk melakukan manajemen waktu pada suatu proyek. Studi ini berfokus pada bagaimana menggunakan Earned Value management untuk mengendalikan waktu dan biaya proyek pembangunan kantor dan pabrik di Karawang. Analisis pada studi ini secara khusus membahas mengenai keterlambatan dan kemajuan dari proyek pabrik dan kantor yang memiliki durasi perencanaan selama 44 minggu. Analisis dengan menggunakan metode Earned Value mendapatkan hasil prediksi durasi akhir proyek pada minggu keterlambatan dan minggu percepatan. Pada minggu keterlambatan minggu ke-33 sampai minggu ke-37 prediksi durasi akhir proyek melebihi dari waktu rencana awal proyek. Sedangkan pada minggu percepatan minggu ke-38 sampai minggu ke-43 prediksi durasi akhir proyek menunjukan hasil kurang dari rencana awal proyek. Keterlambatan ini disebabkan oleh pekerja kurang dari rencana sehingga proyek mengalami keterlambatan dan pada minggu percepatan pekerja di proyek ditambah dan menghasilkan prediksi durasi akhir yang baik.
OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK X MENGGUNAKAN METODE LEAST COST ANALYSIS Tanuwihardjo, Gervan Abraham; Anondho, Basuki
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i1.26678

Abstract

Construction projects can be completed on time and the costs incurred are appropriate based on what was carefully planned. Optimizing time and costs is an effort to utilize relatively short time with minimum costs to achieve work with good results and profits while still paying attention to the quality and qualities of a project. The research on project X aims to analyze the optimum time and costs with additional workforce. This research uses the least cost analysis method. By using this method, the optimal project duration can be obtained with the minimum possible total project costs calculated from the activities that have the lowest cost slope. This research requires secondary data in the form of a Cost Budget Plan (RAB), time schedule and unit price analysis list. Based on research using the least cost analysis method with additional labor, it was found that the completion duration was reduced by 48 days with a total cost of Rp.12.527.874.866, direct costs of Rp.12.262.603.151, and indirect costs of Rp.265.271.714. Abstrak Optimalisasi waktu dan biaya adalah usaha pemanfaatan waktu yang relatif singkat dengan biaya yang minimum untuk mencapai suatu pekerjaan dengan hasil dan keuntungan yang baik dengan tetap memperhatikan mutu dan kualitas suatu proyek. Penelitian pada proyek X ini bertujuan untuk menganalisis waktu dan biaya optimum dengan adanya penambahan tenaga kerja. Penelitian ini menggunakan metode least cost analysis. Dengan menggunakan metode ini dapat diperoleh durasi proyek yang optimal dengan biaya total proyek seminimal mungkin dihitung dari kegiatan yang memiliki cost slope terendah. Pada penelitian ini memerlukan data sekunder berupa Rencana Anggaran Biaya (RAB), time schedule dan daftar analisa harga satuan. Berdasarkan penelitian melalui metode least cost analysis dengan penambahan tenaga kerja didapat pengurangan durasi penyelesaian selama 48 hari dengan biaya total sebesar Rp.12.527.874.866, biaya langsung sebesar Rp.12.262.603.151, dan biaya tak langsung sebesar Rp.265.271.714.