Claim Missing Document
Check
Articles

Found 4 Documents
Search

PERSELISIHAN ANTARA PEMILIK PEKERJAAN DENGAN PIHAK KONTRAKTOR PELAKSANA DALAM HAL PEMUTUSAN KONTRAK KERJA Edison H. Manurung; Akhmad Faruq
JURNAL ILMIAH RESEARCH STUDENT Vol. 2 No. 2 (2025): September
Publisher : CV. KAMPUS AKADEMIK PUBLISING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61722/jirs.v2i2.5709

Abstract

Abstrak. The occurrence of several cases experienced by the author himself, the author tries to provide a summary of what happened and hopes that this will not happen to the implementation of construction activities in Indonesia, especially construction work contract activities involving foreign investors. They are very interested in doing business in Indonesia. Especially in accordance with government programs to attract as many foreign investors as possible to do business in Indonesia. In this case, the reference or law in the implementation of construction work contract activities in Indonesia also has permanent laws and legal channels and must be implemented by both parties, both job owners or investors or also by the implementing contractor who wins the work tender. Keywords: investors , work contract, law, tender. Abstrak. Terjadinya beberapa kasus yang dialami oleh penulis sendiri, maka penulis mencoba memberikan rangkuman atas apa yang terjadi dan berharap ini tidak terjadi pada pelaksanaan kegiatan konstruksi di Indonesia, terutama kegiatan kontrak kerja konstruksi yang melibatkan pihak-pihak investor asing. Mereka sangat tertarik untuk berusaha di Indonesia. Terutama juga sesuai program – program pemerintah untuk menarik investor-investor asing sebanyak-banyaknya untuk berusaha di Indonesia. Dalam hal ini tentang acuan atau undang-undang dalam kegiatan pelaksanaan kontrak kerja konstruksi di Indonesia juga sudah mempunyai undang-undang dan jalur hukum yang tetap dan harus dilaksanakan oleh ke dua belah pihak baik pemilik kerja atau investor ataupun juga oleh kontraktor pelaksana yang memenangkan tender pekerjaan. Kata Kunci: Investor, Kontrak kerja, Undang-undang, tender
PENGEMBANGAN STRATEGI MANAGEMENT PROYEK KONSEP GREEN BUILDING PADA PEMBANGUNAN KOS-KOSAN 6 LANTAI STRUKTUR BAJA DI DAGO BANDUNG JAWA BARAT Edison H. Manurung; Akhmad Faruq
JURNAL ILMIAH RESEARCH STUDENT Vol. 2 No. 2 (2025): September
Publisher : CV. KAMPUS AKADEMIK PUBLISING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61722/jirs.v2i2.5710

Abstract

Green building is a development concept that pays attention to the efficiency of energy, water, materials, as well as the comfort and health of its residents. Its main goal is to minimize environmental impact and improve sustainability. Especially emphasized are several things, including  the First energy and water efficiency, the Second indoor air quality, the Third reduction of emissions and waste, and the Fourth use of renewable resources. Lastly, climate adaptation and environmental conservation.  
LAPORAN KERJA PRAKTEK PENGEMBANGAN STRATEGI MANAGEMENT PROYEK KONSEP GREEN BUILDING PADA PEMBANGUNAN KOS-KOSAN 6 LANTAI STRUKTUR BAJA DI DAGO BANDUNG JAWA BARAT Edison H. Manurung; Akhmad Faruq
JURNAL ILMIAH RESEARCH STUDENT Vol. 2 No. 2 (2025): September
Publisher : CV. KAMPUS AKADEMIK PUBLISING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61722/jirs.v2i2.5755

Abstract

Abstract. The purpose of writing this Practice Work Report is to complete the requirements in pursuing a bachelor's degree in the Department of Civil Engineering, Faculty of Engineering, Mpu Tantular University. Practical work is a course that must be taken by every student to gain very valuable experience that is not learned in lectures. The implementation of practical work is carried out for 90 working days, so that students can get a real picture of the implementation of construction projects in the field directly along with their problems. In addition, this practical work is also intended to apply the knowledge that students have gained in lectures so that they can compare theory with implementation practice in the field. Keywords: Reports, Practice work, construction projects, compare theory. Abstrak. Maksud dari penulisan Laporan Kerja Praktek ini adalah untuk melengkapi persyaratan dalam menempuh pendidikan strata I Departemen Teknik Sipil Fakultas Teknik Universitas Mpu Tantular. Kerja praktek merupakan mata kuliah yang wajib ditempuh oleh setiap mahasiswa untuk mendapatkan pengalaman yang sangat berharga yang tidak dipelajari pada perkuliahan. Pelaksanaan kerja praktek dilakukan selama 90 hari kerja, agar mahasiswa dapat memperoleh gambaran yang nyata tentang pelaksanaan pembangunan proyek konstruksi di lapangan secara langsung beserta dengan permasalahannya. Disamping itu, kerja praktek ini juga dimaksudkan untuk menerapkan ilmu yang telah diperoleh mahasiswa di bangku perkuliahan sehingga dapat membandingkan antara teori dengan praktek pelaksanaan di lapangan. Kata Kunci Laporan, Kerja praktek, Proyek konstruksi, Membandingkan teori
PERENCANAAN STRUKTUR BANGUNAN RUKO 7 LANTAI Edison H. Manurung; Agnes Intan Permatasari; Akhmad Faruq; Bagus Nugroho Prasetyo; Muhammad Ardiansyah Mursalim; Muhammad Hisyam Batubara
JURNAL ILMIAH RESEARCH STUDENT Vol. 2 No. 2 (2025): September
Publisher : CV. KAMPUS AKADEMIK PUBLISING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61722/jirs.v2i2.5844

Abstract

Abstract. This study discusses the structural design of a 7-storey building that uses reinforced concrete material as the main structural element. The design was carried out based on the provisions of SNI 2847:2019 and SNI 1726:2019. Structural analysis is performed using SAP2000 software. The design results show that the building structure is safe against vertical and lateral loads with a special moment bearing frame system (SRPMK) Keywords: reinforced concrete structure, SAP2000, spColumn, SNI 2847:2019, SRPMK, earthquake. Abstrak. Penelitian ini membahas perancangan struktur sebuah gedung bertingkat 7 lantai yang menggunakan material beton bertulang sebagai elemen struktural utama. Perancangan dilakukan berdasarkan ketentuan SNI 2847:2019 dan SNI 1726:2019. Analisis struktur dilakukan menggunakan perangkat lunak SAP2000. Hasil perancangan menunjukkan bahwa struktur gedung aman terhadap beban vertikal dan lateral dengan sistem rangka pemikul momen khusus (SRPMK). Kata Kunci: struktur beton bertulang, SAP2000, spColumn, SNI 2847:2019, SRPMK, gempa