Claim Missing Document
Check
Articles

Found 2 Documents
Search

KKN Tematik Penerapan Teknologi Dalam Rangka Mendukung Pemulihan Ekonomi di Desa Wanajaya Julianto, Indri Tri; Nurfauziah, Hanifah; Nawawi, Irfan Ahmad; Sanusi, Aini Fauziah Putu; Nurdiansyah, Farhan; Hidayat, Rangga; Ardana, Alwan; Hidayat, Ramdan Rahmat; Pardiansyah, Irgi; Sadikin, M. Fitroh; Dikdik, Dikdik; Nursalapiah, Sopa; Sermana, Elsa Maharani; Aditriyana, Muhammad Rizky; Abdulrohman, Muhammad Haviz; Pratama, Rizky Muhammad; Dinata, Messy Suryani Jaya; Fajar, Sigit Sihab; Octaviansyah, Rizqi Moch; Mulyani, Neng Cici
Jurnal PkM MIFTEK Vol 4 No 1 (2023): Jurnal PkM MIFTEK
Publisher : Institut Teknologi Garut

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33364/miftek/v.4-1.1322

Abstract

Wanajaya Village is one of the villages in the Wanaraja sub-district, Garut Regency, West Java Province. Administratively, the area of ”‹”‹Wanajaya Village has a sizeable area, directly adjacent to Sukamulya Village and Citangtu Village, Pangatikan Subdistrict, to the south, Sindangratu Village and Wanamekar Village to the south, Sindangratu Village to the east, and Citangtu Village to the east. to the west it is directly adjacent to Wanasari Village, and Wanaraja Village, Wanaraja District. Based on the results of the survey that we have carried out, then with the results obtained from the survey we develop work programs that we will carry out for one month. The work program consists of work programs from various study programs as well as excellent work programs that are worked on directly by all members. In addition to work programs from various study programs and also the superior work programs that we plan, there are several other work programs that we also plan, namely teaching the Koran at mosques, holding August 17 activities, conducting clean Friday activities, conducting computer introduction activities and digitalization to elementary school children, besides that there are several work programs that we did not plan beforehand but there were requests from local residents such as carrying out garbage collection activities, making school profile videos, making the Wanajaya 1 SD school logo, making the Karangtaruna logo, and so on.
Penurunan (Waste) Pada Proses Pembuatan Rice Hulling Roll (RHR) dengan Pendekatan Lean Manufacturing Mauluddin, Yusuf; Nawawi, Irfan Ahmad
Jurnal Kalibrasi Vol 23 No 2 (2025): Jurnal Kalibrasi
Publisher : Institut Teknologi Garut

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33364/kalibrasi/v.23-2.1950

Abstract

PT. ABC is a rubber processing manufacturing company that produces Rice Hulling Rolls (RHR).The company faces challenges in meeting its weekly production targets due to a bottleneck in the turning process. This study applies a lean manufacturing approach using Value Stream Mapping (VSM) and Value Analysis Tools (VALSAT) to identify waste.The analysis results indicate that the main bottleneck occurs during the setup time of the lathe machine, which impacts production delays. To address this issue, the Single-Minute Exchange of Die (SMED) method was implemented, reducing setup time from 20 minutes to 10 minutes. Additionally, a time and motion study improved the efficiency of the turning process from 140 seconds to 130 seconds per cycle. As a solution, a Standard Operating Procedure (SOP) was developed, including setup time optimization guidelines and the implementation of left–right hand mapping to enhance turning process efficiency. This implementation is expected to reduce waste, improve production efficiency, and bring production output closer to the set targets. These findings offer practical contributions to the application of lean manufacturing in the manufacturing industry, with implications for industrial management in optimizing production processes.