Claim Missing Document
Check
Articles

Found 2 Documents
Search

Peranan PBM PT Wahana Intradermaga Niaga pada Proses Bongkar Curah Kering di Pelabuhan Belawan Supriyadi Supriyadi; Yursal Yursal; Meriah Kita Deliani
PPIMAN Pusat Publikasi Ilmu Manajemen Vol. 3 No. 3 (2025): Juli : Pusat Publikasi Ilmu Manajemen
Publisher : Fakultas Ekonomi & Bisnis, Universitas Nusa Nipa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59603/ppiman.v3i3.939

Abstract

This paper is to determine the Role of PBM Wahana Intradermaga Niaga in the Dry Bulk Unloading Process at PT. Pelabuhan Belawan. Unloading activities are activities to unload goods from the ship's hold to the dock in the ship's hull or vice versa (stevedoring), activities to move goods from the dock using a conveyor to the warehouse/stacking yard or vice versa (cargodoring) and activities to pick up goods from the warehouse/yard carried onto a truck or vice versa (receiving/delivery). A dry bulk carrier is a ship specifically designed to be able to transport various dry bulk loads. In the distribution of dry bulk cargo there is an unloading process. Unloading aims to lower and raise goods from the ship to the port or vice versa. And in supporting this goal requires unloading equipment. The unloading equipment in question comes from the port. In carrying out the unloading process, MV. S Grace has obstacles in carrying out unloading. So that the purpose of unloading is not achieved optimally. Therefore, an analysis is needed to determine the factors that inhibit the productivity of dry bulk unloading so that unloading activities can run optimally. From the results of reading and observing this paper, the author states that the implementation of unloading has inhibiting factors, namely external factors. Crane breakdown and bad weather are inhibiting factors in the dry bulk unloading process. Based on these factors, it has an impact on unloading delays that are not according to schedule and increase ship queues. Therefore, the author suggests that port operators or ship crews carry out routine maintenance on the equipment used for loading and unloading so that dry bulk loading and unloading can run optimally. This paper uses the field research method and the library research method (data collection from the library).
Prosedur Bongkar Muat Peti Kemas dari Kapal KM. Oriental Samudra pada PT. Salam Pacific Indonesia Lines Cabang Medan Muhammad Wiraromatua Rangkuti; Suratni Ginting; Meriah Kita Deliani
Jurnal Manajemen Bisnis Digital Terkini Vol. 2 No. 4 (2025): Oktober : Jurnal Manajemen Bisnis Digital Terkini
Publisher : Asosiasi Riset Ilmu Manajemen Kewirausahaan dan Bisnis Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/jumbidter.v2i4.871

Abstract

Container loading and unloading procedures are a series of essential operational activities carried out to systematically, safely, and efficiently move containers from ships to the stacking yard or vice versa. This study aims to examine these procedures, analyze the effectiveness of their implementation, and identify the obstacles and corrective efforts encountered in the field. The methods used include field observation (field research) and literature review (library research). The results indicate that the procedural stages involve document preparation (Bill of Lading and Manifest), ship berthing, the utilization of various loading and unloading equipment (such as Gantry Crane, RTG, and Headtruck), and container arrangement within the Container Yard (CY). The process involves three main work stages: Stevedoring, Cargodoring, and Receiving/Delivery, which require close coordination among port operators, foremen, and Stevedoring Workers (TKBM). Implementation can be hindered by crane breakdowns, headtruck limitations, traffic congestion, and slow stevedoring performance. Effective solutions suggested include routine equipment maintenance, increasing HT fleet capacity, enhancing human resource competency through training, and coordinating traffic routes with relevant authorities. Optimal procedure execution is crucial for ensuring smooth logistics flow, time efficiency, and occupational safety.