Pendampingan Pekerjaan Peninggian Jalan Anang Sya’rani Sebagai Upaya Penanggulangan Banjir Di Wilayah Rawan Genangan Di Kabupaten Banjar Arifin; Riduan, Ahmad; Widuri, Elva Shanty; Misnawati; Novianti, Trie Rezky; Chandra , Muhammad; Fajar, Hafiz Abdullah Nor
Jurnal Pengabdian Kepada Masyarakat Multi Disiplin Vol. 2 No. 3 (2025): JUPENGEN - Agustus
Publisher : CV. SINAR HOWUHOWU

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70134/jupengen.v2i3.644

Abstract

Anang Sya’rani Street in Martapura Timur Subdistrict, Banjar Regency, serves as a vital access route for community activities in the areas of economy, social interaction, and religious tourism, particularly for pilgrims visiting local religious sites. However, this road frequently experiences flooding during the rainy season due to its low elevation, which disrupts mobility and accelerates road surface damage. To address these issues, a community service initiative was carried out involving the elevation and improvement of the road using a technical approach. This included the installation of a Lower Base Course (LPB), Upper Base Course (LPA), asphalt paving using Hot Rolled Sheet–Wearing Course (HRS-WC), and concrete casting of road shoulders to ensure structural stability. The activity was conducted over a two-month period, with strict supervision on material quality, final elevation levels, and occupational safety compliance. Evaluation results indicate a significant improvement in the road’s resistance to water inundation, along with positive feedback from local residents. This road elevation effort has proven to be an effective solution in enhancing public mobility and improving the sustainability of local infrastructure.
Pendampingan Teknis Elevasi Struktur Dan Penerapan K3 Pada Pekerjaan Rehabilitasi Pondasi Tiang Ulin Sdn Balah Paikat Kabupaten Hulu Sungai Selatan Arifin, *; Misnawati, *; Riduan, Ahmad; Widuri, Elva Shanty; Novianti, Trie Rezky; Setiady, Irsyandi Syifa; Fajar, Hafiz Abdullah Nor
Jurnal Pengabdian Kepada Masyarakat Multi Disiplin Vol. 3 No. 1 (2026): JUPENGEN - Februari
Publisher : CV. SINAR HOWUHOWU

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70134/jupengen.v3i1.1344

Abstract

This Community Service (PkM) activity aims to provide technical assistance for structural elevation and the implementation of Occupational Safety and Health (K3) in the rehabilitation work of ironwood pile foundations at SDN Balah Paikat, Hulu Sungai Selatan Regency. The school building stands on swampy land with a low floor elevation so that it often experiences flooding during the rainy season, while the previous building lifting process was carried out manually without adequate elevation control and K3 procedures. The activity was carried out through a participatory approach that included preparation and coordination stages, observation and initial elevation measurements, technical assistance for the lifting process (jacking) in stages and simultaneously using simple measuring tools, the implementation of K3 through socialization and the use of personal protective equipment (PPE), as well as evaluation and provision of technical recommendations. The results of the activity showed that the building lifting process became more controlled, the elevation between columns was more uniform, and the distribution of structural loads was more stable. In addition, worker awareness of the implementation of K3 during the work also increased. This activity has an impact on reducing the potential for waterlogging, increasing the safety and comfort of the building, and creating a safer and more usable learning environment.