Umarwoko Daniarto, Cornelius
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Value Engineering In Planning Construction of Ampelsari Reservoir Pasuruan Regency Umarwoko Daniarto, Cornelius; Oetomo, Wateno; Wulandari, Esti
Devotion : Journal of Research and Community Service Vol. 3 No. 14 (2022): Special Issue
Publisher : Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36418/dev.v3i14.324

Abstract

Controlling the cost and time of project implementation is important in a project management process. In this research, a value engineering analysis will be carried out on the Ampelsari Reservoir construction plan to determine the most effective and cost-efficient alternative construction design. The application of value engineering to determine the amount of construction cost savings with a work plan includes: Information Stage, Creative Stage, Analysis Stage, and Recommendation Stage. The results of the value engineering analysis in this study obtained construction cost savings of Rp. 1,624,162,703.65 or 6.16% of the total initial design cost, with alternative designs selected in 3 (three) types of work, on Spillway Work with K-225 Reinforced Concrete and Cyclop Concrete work items (A3), on Gate Valve House Work with Concrete Rebate and U-Ditch 30 x 30 work items (B3), on Reservoir Work with HDPE Pipe work items dia. 2.5" (C2). 2.5" (C2)