Claim Missing Document
Check
Articles

SMART CHARACTER SEBAGAI UPAYA MENUMBUHKAN JIWA KEPEMIMPINAN SISWA DI SMAN 1 JIWAN Nugroho, Danang Dwi; Wahyono, Gatot Dwi; Yuliani, Lina; Wulandari, Esti; Agustina, Windarti
Program Kreativitas Mahasiswa - Pengabdian Kepada Masyarakat PKM-M 2013
Publisher : Ditlitabmas, Ditjen DIKTI, Kemdikbud RI

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Crisis of leadership is a serious problem that is faced by Indonesia today including by students. The Indonesian’s students have no ability to lead on themselves, the first step in rising leadership qualities. There are a lot of students, who are engaged in a gang fight, have low empathy and low respectful to others. “Smart Character” is a program which is concern about leadership and is applied as an effort to solve crisis of leadership by rising leadership qualities toward students. Methods that are used in applying “Smart Character” are: observation, consultation, socialization, weekly intensive character building, evaluation, and continuing the program. The output of the program is the rising of students’ leadership qualities.
Analysis Of Water Balance Aspect On The Results Of Geo-electric Interpretation With Schlumberger Configuration Wulandari, Esti; Septoraharjo, Eko Rony; Nugroho, Laksono Djoko; Hudyantoro, Hudyantoro; Oetomo, Wateno
THE SPIRIT OF SOCIETY JOURNAL : International Journal of Society Development and Engagement Vol 4 No 2 (2021): March 2021
Publisher : LPPM of NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/scj.v4i2.1388

Abstract

The background of the problem is that the need for water for various purposes constantly increases in line with the population growth and changes in water use patterns caused by technological advances, industrial growth, and changes in land use. Moreover, from the existing problems, several problem formulations were obtained as the basis for identifying the presumption of groundwater presence, among others, 1). what is the magnitude of the infiltration rate in the study area in relation to the influence of land use conditions, 2). how the results of geo-electric interpretation using the Schlumberger configuration in estimating aquifer layers based on geo-hydrological aspects, and 3). how the effect of time and cost efficiency. Based on the results of the analysis and calculations, several things can be concluded, including: 1). the volume of the infiltration rate using the Horton method (q) by considering the land cover / land use conditions (C), it is known that the average infiltration capacity on the land in the study location per year is more than 200 cm / year, and has an effective enough infiltration capacity so that it is average. -the annual average can store water up to> 200 cm / year, 2). In that area, an aquifer layer was found at a depth of 30-50 meters at the GL 1 point, and the GL point at a depth of 22-55 meters, with the results of the analysis showing the ability of the land to carry out the infiltration process properly and validated from the results of geo-electric investigations, and 3). the results evaluation analysis is able to streamline the amount of operational costs for groundwater source investigations and the time of implementation
Project Cost Performance Analysis Using the Earned Value Method on the Laga Collector's Highway Improvement Project – Bauguia, Timor-Leste Luis, Laurenco; Tjendani, Hanie Teki; Wulandari, Esti
THE SPIRIT OF SOCIETY JOURNAL : International Journal of Society Development and Engagement Vol 7 No 2: March 2024
Publisher : LPPM of NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/scj.v7i2.2836

Abstract

In order to support Laga-Bauguia trade activities, the Ministry of Public Works (PU) is building a road network to the southern region. In its development, there is the development of the Laga-Bauguia Access Road which will be implemented from February 2023 to February 2025. This highway is one of the most important highways because it will connect the north coast area and cross the hills to the Matabian Mountains area which is visited by many tourists. local and foreign. This research aims to analyze the performance of the Laga - Bauguia Highway improvement project in terms of costs and analyze the estimated costs for the remaining work, as well as the cost of completing the Laga - Bauguia Highway improvement project. Every construction project requires control measures in terms of costs, where in carrying out control it is necessary to know in advance the ongoing project performance. One way to determine the cost performance of the project is the Earned Value method. This method can reveal whether the progress in implementing project work is commensurate with the use of part of the budget. By analyzing the concept of Earned Value, the relationship between what has actually been achieved physically and the amount of budget that has been spent can be seen. During the review period in the 8th month, a CPI value of 5.50 was obtained, which means that the actual costs incurred were less than the budget costs. In the 13th month, the CPI value was obtained at 5.50, which means the actual costs incurred were smaller than the budgeted costs.
COMPARATIVE ANALYSIS OF ACCELERATION ALTERNATIVES FOR THE DRAINAGE CHANNEL PROJECT ON XYZ STREET USINGTHE TIME-COST TRADE-OFF (TCTO) METHOD Prasetiyo W., Arif; Oetomo, Wateno; Wulandari, Esti
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 2 No. 3 (2023): AUGUST
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v2i3.882

Abstract

In response to the increasing occurrence of rain, the city government is actively striving to mitigate urban flooding by enhancing the drainage system. Collaboration with contracted construction firms is central to this endeavor, although it is not without its challenges, including community opposition driven by concerns over potential disruptions and limited financial resources among contractors. This study adopts the Critical Path Method (CPM) and Microsoft Project software, supplemented with the Time Cost Trade Off (TCTO) method to expedite project completion, emphasizing a comprehensive evaluation that encompasses both time and financial aspects. Notably, the analysis identifies the most feasible acceleration opportunity within the excavation of ordinary soil for construction, with original plans indicating a cost of Rp. 60,818,919 over a 40-day period. Three alternatives are considered: (1) overtime labor, incurring Rp. 65,520,000, with a 34-day duration; (2) increased workforce, incurring Rp. 68,000,000, with a 34-day duration; and (3) introducing a new addendum for the replacement of manual excavation with heavy machinery, incurring Rp. 37,440,000, with a 16-day duration. In conclusion, this study provides a comprehensive strategy for accelerating the urban drainage project, considering the critical path, time-cost trade-offs, and cost-benefit factors, highlighting the significance of selecting the most cost-effective alternative while addressing community concerns and resource limitations in flood risk mitigation efforts.
COST ANALYSIS OF WATER RESOURCES MANAGEMENT SERVICES BELANTI II IRRIGATION AREA CENTRAL KALIMANTAN PROVINCE Dozier, Alpha; Oetomo, Wateno; Wulandari, Esti
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 4 (2022): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i4.883

Abstract

The Belanti II Swamp Irrigation Area in Pulang Pisau Regency, Central Kalimantan, spans 3,275 Ha. Water management activities, necessitated for sustained irrigation, incur the Water Resources Management Service Fee (BJPSDA), calculated on cost recovery principles. This study aims to (1) Determine the BJPSDA value by considering the economic benefit factor, (2) Assess farmers' Ability To Pay (ATP) and Willingness To Pay (WTP) for BJPSDA, and (3) Evaluate the Belanti II swamp irrigation network and optimization efforts. The BJPSDA in Belanti II is Rp5,625,504,000, with agricultural benefits contributing Rp51,468,721,052.40 (51.86% of NME). The cost is Rp570,151.69/Ha or Rp101/m3. Farmer ATP and WTP for BJPSDA are Rp54/m3. The irrigation system lacks proper water flow regulation structures, but optimization efforts include channel normalization and water control structures. To enhance leaching ability, 500 m3/ha/day of fresh water is needed. Structures like weirs and flap gates regulate water supply during high and low tides, respectively. These initiatives aim to ensure consistent irrigation and sustainable water resource management in Belanti II.
ANALYSIS OF FACTORS INHIBITING THE IMPLEMENTATION OF SMK3 IN THE WIDENING PROJECT OF KAPAS – GLENDENG BRIDGE, BOJONEGORO REGENCY Ariyanti, Menik; Oetomo, Wateno; Sajiyo, Sajiyo; Wulandari, Esti
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 2 No. 4 (2023): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v2i4.980

Abstract

In construction projects, inadequate implementation of the Occupational Safety and Health Management System (OHSMS) poses risks to the safety and well-being of workers, resulting in decreased performance and compromised project quality. This study focuses on the Kapas-Glendeng bridge widening project in Bojonegoro Regency, identifying key obstacles such as workforce competence, limited experience, insufficient training, and challenges accessing digital information. Additionally, issues related to worker involvement in regulation-making, understanding of Personal Protective Equipment (PPE), reporting procedures, and documentation of work accidents were observed. To address these challenges, the study recommends strategies such as involving untrained workers in competence-building programs, providing apprenticeships for less experienced personnel, implementing comprehensive training information systems, actively engaging workers in project planning, enforcing OHS monitoring systems, ensuring mandatory PPE usage with penalties for violations, and establishing clear procedures for recording and reporting work accidents. This proactive approach aims to enhance OHS implementation and mitigate risks in construction projects.
ANALYSIS OF INVESTMENTS IN THE BUILDING OF THE GELORA BUNG TOMO CITY OF SURABAYA Sulistianto, Leo Agus; Witjaksana, Budi; Wulandari, Esti
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 3 No. 3 (2024): AUGUST
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v3i3.1168

Abstract

The Gelora Bung Tomo area currently includes a football stadium, three training fields, a wheel-shoe track, a motorcycle racing circuit, and a multipurpose indoor sports building. With the evolving automotive industry, upgrading the circuit from grade D to grade C is necessary to accommodate more races. This involves extending the 650-meter road race track to 1700 meters, including a pit stop area, audience tribune, paddock, and commercial area. The study evaluates the current facilities of the Gelora Bung Tomo (GBT) area in Surabaya and conducts investment analysis to determine financial viability. The research methodology combines quantitative and qualitative approaches using previously obtained primary and secondary data, then compiles cash flow projections and performs investment analysis using investment valuation methods, namely net present value (NPV), internal rate of return (IRR), benefit cost ratio (BCR), and payback period (PP). Based on the results of the analysis with the Net Present Value (NPV) method, if a positive value of Rp. 13.339.690.346 is obtained, then the investment is acceptable. If the benefit-cost ratio is greater than 1,1849, then the project is accepted, and the PP is 30.98 under the time of the investment of 50 years, but the greater the risk faced, the more the overall investment is worthy of being implemented.
TIME ANALYSIS WITH CRITICAL PATH METHOD: (Case Study on Jakarta Sewerage Development Project Zone 1, Package 2: Sewer Construction in Area 1-1) Hartawan, Ade Sholeh; Witjaksana, Budi; Wulandari, Esti
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 3 No. 3 (2024): AUGUST
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v3i3.1174

Abstract

Preparatory work in a construction project generally includes the fulfillment of work facilities, field investigations, and licensing, and is typically non-structural. The implementation of the Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Sewers in Area 1-1, which is currently still in the preparatory work stage, is experiencing significant issues. Specifically, the project is facing a very complex licensing process, resulting in minimal work progress. This is due to the project planning phase not adequately considering the timeframe required for obtaining an implementation permit. Therefore, this paper analyzes the project timeline to identify project performance during the preparation period before the main project work implementation stage. In this study, the Critical Path Method (CPM) scheduling method was applied to the project to determine the activities on the critical path, utilizing the Microsoft Project application. The analysis identified that the activities on this critical path include Document Submission Work, Shaft Location C-8.1 Work, 8-span Pipe Jacking Work, Diversion Chamber Work, and Contract Closing. The analysis of the relationship between the licensing process and the critical path of the Master Schedule, as determined by the CPM method, revealed a delay in the start time of Shaft work from the planned June 3, 2024, to June 21, 2024, representing a 17-day delay from the original plan.
COST MANAGEMENT ANALYSIS WITH EARNED VALUE METHOD ON ROAD IMPLEMENTATION PROJECT IN UAIACA - QUELECAI TO OSSU BAUCAU CITY, TIMOR LESTE Alves, Agata Maria Orleans; Tjendani, Hanie Teki; Wulandari, Esti
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 3 No. 3 (2024): AUGUST
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v3i3.1183

Abstract

Project management plays a critical role in ensuring the success of infrastructure projects like road implementations, which are essential for the development of emerging regions such as Baucau City, Timor Leste. Challenges often arise due to discrepancies between planned schedules and actual implementation, exacerbated by logistical constraints and unforeseen changes in project requirements. Effective cost management, exemplified by methods like Earned Value Management (EVM), becomes crucial in maintaining project feasibility and controlling expenditures. The purpose of this study was to analyze the cost of road implementation projects using the Earned Value Analysis Method. The method used in this study is to use the Earned Value Method with a project duration of 18 months, where the importance of the earned value analysis method is very helpful for the owner and project implementer to more easily analyze the performance of the project being carried out so as to provide benefits for the owner and project implementation. The findings revealed a project cost overrun of $205,483.12, attributed to low labor productivity and inadequate management, resulting in extended project timelines and subsequent delays in follow-up activities.
PERFORMANCE ANALYSIS OF PDAM CLEAN WATER SERVICE NEEDS FOR DOMESTIC CUSTOMERS OF WAGINOPO VILLAGE, WANGI-WANGI DISTRICT, WAKATOBI DISTRICT Jamiludin, Jamiludin; Wulandari, Esti; Tjendani, Hanie Teki
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 3 No. 4 (2024): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v3i4.1241

Abstract

Clean water is essential for society's basic needs like drinking, bathing, cooking, washing, and industrial purposes. Having clean water available in a community is crucial due to the busy nature of society. However, in Waginopo Village, the drinking water supply system is not functioning well. Reports show that the water from PDAM only runs every 2 days, once a week, and for a maximum of 12 hours. The aim of this research is to analyze the performance of PDAM Wakatobi's clean water services to meet the needs of the Waginopo Village community for clean water. In this research, not only numerical data will be collected, but also information about what the community desires regarding the performance of the clean water distribution system, so this research study approach uses a combination of quantitative and qualitative approaches. From the results of the analysis, it can be said that the performance of the Wakatobi Regency PDAM service for the Waginopo Village service area is based on the 6th assessment aspect, where the distribution aspect is assessed with a performance value of "Not Good", for the production quality aspect the performance value is "Good", for the meter recording aspect with the performance value is "Good", for the payment aspect the performance value is "Good", for the complaint handling aspect the performance value is "Good", and for the tariff aspect the performance value is "Not Good".