Claim Missing Document
Check
Articles

Found 19 Documents
Search

SMART CHARACTER SEBAGAI UPAYA MENUMBUHKAN JIWA KEPEMIMPINAN SISWA DI SMAN 1 JIWAN Nugroho, Danang Dwi; Wahyono, Gatot Dwi; Yuliani, Lina; Wulandari, Esti; Agustina, Windarti
Program Kreativitas Mahasiswa - Pengabdian Kepada Masyarakat PKM-M 2013
Publisher : Ditlitabmas, Ditjen DIKTI, Kemdikbud RI

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Crisis of leadership is a serious problem that is faced by Indonesia today including by students. The Indonesian’s students have no ability to lead on themselves, the first step in rising leadership qualities. There are a lot of students, who are engaged in a gang fight, have low empathy and low respectful to others. “Smart Character” is a program which is concern about leadership and is applied as an effort to solve crisis of leadership by rising leadership qualities toward students. Methods that are used in applying “Smart Character” are: observation, consultation, socialization, weekly intensive character building, evaluation, and continuing the program. The output of the program is the rising of students’ leadership qualities.
Analysis Of Water Balance Aspect On The Results Of Geo-electric Interpretation With Schlumberger Configuration Wulandari, Esti; Septoraharjo, Eko Rony; Nugroho, Laksono Djoko; Hudyantoro, Hudyantoro; Oetomo, Wateno
THE SPIRIT OF SOCIETY JOURNAL : International Journal of Society Development and Engagement Vol 4 No 2 (2021): March 2021
Publisher : LPPM of NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/scj.v4i2.1388

Abstract

The background of the problem is that the need for water for various purposes constantly increases in line with the population growth and changes in water use patterns caused by technological advances, industrial growth, and changes in land use. Moreover, from the existing problems, several problem formulations were obtained as the basis for identifying the presumption of groundwater presence, among others, 1). what is the magnitude of the infiltration rate in the study area in relation to the influence of land use conditions, 2). how the results of geo-electric interpretation using the Schlumberger configuration in estimating aquifer layers based on geo-hydrological aspects, and 3). how the effect of time and cost efficiency. Based on the results of the analysis and calculations, several things can be concluded, including: 1). the volume of the infiltration rate using the Horton method (q) by considering the land cover / land use conditions (C), it is known that the average infiltration capacity on the land in the study location per year is more than 200 cm / year, and has an effective enough infiltration capacity so that it is average. -the annual average can store water up to> 200 cm / year, 2). In that area, an aquifer layer was found at a depth of 30-50 meters at the GL 1 point, and the GL point at a depth of 22-55 meters, with the results of the analysis showing the ability of the land to carry out the infiltration process properly and validated from the results of geo-electric investigations, and 3). the results evaluation analysis is able to streamline the amount of operational costs for groundwater source investigations and the time of implementation
Project Cost Performance Analysis Using the Earned Value Method on the Laga Collector's Highway Improvement Project – Bauguia, Timor-Leste Luis, Laurenco; Tjendani, Hanie Teki; Wulandari, Esti
THE SPIRIT OF SOCIETY JOURNAL : International Journal of Society Development and Engagement Vol 7 No 2: March 2024
Publisher : LPPM of NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/scj.v7i2.2836

Abstract

In order to support Laga-Bauguia trade activities, the Ministry of Public Works (PU) is building a road network to the southern region. In its development, there is the development of the Laga-Bauguia Access Road which will be implemented from February 2023 to February 2025. This highway is one of the most important highways because it will connect the north coast area and cross the hills to the Matabian Mountains area which is visited by many tourists. local and foreign. This research aims to analyze the performance of the Laga - Bauguia Highway improvement project in terms of costs and analyze the estimated costs for the remaining work, as well as the cost of completing the Laga - Bauguia Highway improvement project. Every construction project requires control measures in terms of costs, where in carrying out control it is necessary to know in advance the ongoing project performance. One way to determine the cost performance of the project is the Earned Value method. This method can reveal whether the progress in implementing project work is commensurate with the use of part of the budget. By analyzing the concept of Earned Value, the relationship between what has actually been achieved physically and the amount of budget that has been spent can be seen. During the review period in the 8th month, a CPI value of 5.50 was obtained, which means that the actual costs incurred were less than the budget costs. In the 13th month, the CPI value was obtained at 5.50, which means the actual costs incurred were smaller than the budgeted costs.
COMPARATIVE ANALYSIS OF ACCELERATION ALTERNATIVES FOR THE DRAINAGE CHANNEL PROJECT ON XYZ STREET USINGTHE TIME-COST TRADE-OFF (TCTO) METHOD Prasetiyo W., Arif; Oetomo, Wateno; Wulandari, Esti
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 2 No. 3 (2023): AUGUST
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v2i3.882

Abstract

In response to the increasing occurrence of rain, the city government is actively striving to mitigate urban flooding by enhancing the drainage system. Collaboration with contracted construction firms is central to this endeavor, although it is not without its challenges, including community opposition driven by concerns over potential disruptions and limited financial resources among contractors. This study adopts the Critical Path Method (CPM) and Microsoft Project software, supplemented with the Time Cost Trade Off (TCTO) method to expedite project completion, emphasizing a comprehensive evaluation that encompasses both time and financial aspects. Notably, the analysis identifies the most feasible acceleration opportunity within the excavation of ordinary soil for construction, with original plans indicating a cost of Rp. 60,818,919 over a 40-day period. Three alternatives are considered: (1) overtime labor, incurring Rp. 65,520,000, with a 34-day duration; (2) increased workforce, incurring Rp. 68,000,000, with a 34-day duration; and (3) introducing a new addendum for the replacement of manual excavation with heavy machinery, incurring Rp. 37,440,000, with a 16-day duration. In conclusion, this study provides a comprehensive strategy for accelerating the urban drainage project, considering the critical path, time-cost trade-offs, and cost-benefit factors, highlighting the significance of selecting the most cost-effective alternative while addressing community concerns and resource limitations in flood risk mitigation efforts.
Kaji Ulang : Puasa Wajib dan Puasa Sunnah Septiana, Vini Wela; Pratiwi, Sekar Harum; Wulandari, Esti; Septria, Metriani; Maiwinda, Guesa
Jurnal Media Ilmu Volume 3 No. 1 Juni 2024
Publisher : LPPM Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/jmi.v3i1.5590

Abstract

Bagi orang yang beriman ibadah puasa merupakan salah satu sarana penting untuk mencapai takwa, dan salah satu sebab untuk mendapatkan ampunan dosa-dosa, pelipatgandaan pahala kebaikan, dan pengangkatan derajat. Di zaman sekarang yang sudah semakin banyak pengaruh dari media sosial, banyak trend-trend menyesatkan yang diikuti oleh anak muda. Mokel salah satunya, yaitu membatalkan puasa dengan sengaja, kemudian mereka merekam aksinya serta mengupload ke media sosial. Maka dari itu, tujuan dari artikel ini adalah mengkaji ulang tentang apa itu puasa, apa saja hal yang membatalkannya, hikmahnya, dan macam-macam jenis puasa wajib maupun sunnah. Metode yang digunakan adalah Systematic Literrature Riview.
Acceleration Cost Analysis with Critical Path Method: (Case Study on Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Wastewater Sewers in Area 1-1) Hartawan, Ade Sholeh; Witjaksana, Budi; Wulandari, Esti
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.11

Abstract

In a construction project, preparation work typically includes tasks related to setting up work facilities, conducting field investigations, obtaining permits, and non-structural activities. The Jakarta Sewerage Development Project Zone 1, Package 2, which involves the construction of sewers in Area 1-1, is currently in the preparation phase and is experiencing challenges due to a complex permit process. This has led to minimal progress as the initial project planning did not consider the time needed to secure the necessary permits for implementation. The author is therefore evaluating the project timeline to gauge performance during the preparation phase before actual construction begins. This study utilizes the Critical Path Method (CPM) scheduling technique in Microsoft Project to pinpoint critical activities. Upon analysis, it was found that the budget plan for Package 2 of the Jakarta Sewerage Development Project (Zone 1) was detailed and included various work descriptions, with a total budget of IDR 862,292,086,196. However, delays have occurred, resulting in a 17-day setback in the project schedule, necessitating work acceleration. To bring the project duration back in line with the original schedule as per the contract, acceleration was required. This was carried out on the Shaft Construction C-8.1, which was initially set to take 80 days but was shortened to 63 days through time acceleration, incurring a cost of IDR 23,279,288.
Analysis of Investment Sensitivity in The Construction of The Gelora Bung Tomo Surabaya Circuit Sulistianto, Leo Agus; Witjaksana, Budi; Wulandari, Esti
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.12

Abstract

Provision of Sports Prasarana is an attempt to fulfill the basic rights of the public to obtain services in sports activities, as listed in Law of the Republic of Indonesia Number 11 of 2022 concerning Sports 2022. The growing automotive industry is one important sector that significantly contributes to Indonesian economic growth. Based on the Surabaya City for 2021-2026 calls for the creation of an integrated area, with the Gelora Bung Tomo area serving as an international sports center and integrating with the growth of trade and service functions in Surabaya's surrounding areas. The aim of this study is to measure the amount of investment income and revenue limits in an effort to reduce the risks associated with the investment in the circuit. We carry out flow calculations using the Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), and Payback Period (PP) methods, and then analyze the sensitivity. We reviewed the sensitivity analysis based on several parameters, including commercial rent income and circuit management costs. The development of Tomo's Gelora Circuit is sensitive to a loss of income from the rental of business or commercial premises of 8%, which will affect a decline in profit, resulting in a negative net present value (NPV) and prolonging the rate of return. Additionally, it is sensitive to an increase in management costs by 12%.
Analysis of Cost and Time To Complete of Office Project with The Earned Value Method: (Case study: Office of Bahtera Elang Perak Indonesia Surabaya) Nailufar, Linda; Witjaksana, Budi; Wulandari, Esti
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.33

Abstract

The rescheduling of the initial schedule carried out on the Bahtera Elang Perak Indonesia Office Construction project has an impact on increasing the duration of work causing the project completion target to be delayed from the time it should be. Increasing the project completion target can affect the amount of costs incurred. The contract value for this office construction project is Rp. 13,908,226,157 with a work duration of 43 weeks to 54 weeks.  The current condition of work progress at week 31 is -0.225% while the total actual cost or that has been incurred during the work is Rp. 3,191,740,254. To overcome this, an analysis is carried out on the value of the estimate at complete (EAC) and time estimate (TE) of the Surabaya BEPI Office Construction Project using the earned value method. This method combines the elements of cost, schedule, and work performance.  The earned value method aims to determine the estimated cost and time of project completion. From the results of the analysis conducted in the 41st week, it was obtained that the estimated cost and time to complete the project implementation (EAC) was 14,289,833,105, - and the estimated time (TE) was 499 days, which was 121 days later than the original schedule.
Penerapan DAGUSIBU untuk Meningkatkan Kualitas Gizi dan Pencegahan Diare Bagi Siswa Sekolah Dasar melalui Dapur Sehat dan Budi Daya Susanti, Dini; Ekawati, Ridania; Septiana, Vini Wela; Pratiwi, Sekar Harum; Naldi, Jepri; Putri, Mia Dewindi; Wulandari, Esti
Menara Pengabdian Vol 5, No 1 (2025): Vol. 5 No. 1 Juni 2025
Publisher : LPPM Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/jmp.v5i1.6525

Abstract

Penerapan DAGUSIBU (Dapur Sehat dan Budi Daya) merupakan sebuah inisiatif untuk meningkatkan kualitas gizi dan pencegahan diare bagi siswa sekolah dasar. Program ini mengintegrasikan dua aspek penting, yaitu penyediaan makanan sehat melalui dapur sehat yang memprioritaskan bahan makanan bergizi dan pemanfaatan budi daya tanaman lokal yang dapat diolah menjadi sumber pangan bergizi. Dalam konteks pencegahan diare, DAGUSIBU bertujuan untuk meningkatkan pemahaman siswa tentang pentingnya konsumsi makanan bergizi dan kebersihan makanan serta lingkungan. Melalui implementasi program ini, siswa tidak hanya diajarkan untuk memahami pola makan yang sehat, tetapi juga dilibatkan dalam kegiatan budi daya tanaman yang mendukung ketersediaan bahan makanan bergizi di sekolah. Evaluasi program menunjukkan adanya peningkatan pengetahuan siswa mengenai pentingnya gizi seimbang, pengurangan kejadian diare, dan peningkatan keterampilan siswa dalam mengelola konsumsi makanan sehat. Program DAGUSIBU berpotensi menjadi model dalam pengelolaan gizi dan pencegahan penyakit berbasis sekolah yang melibatkan partisipasi aktif siswa si Sekolah Dasar / Madrasah Ibtidaiyah. 
Cost Analysis of Improving Urban Railway Services on Arjonegoro Commuter Setyarini, Ika Oktavia; Wulandari, Esti; Patriadi, Andi
Jurnal Teknik Indonesia Vol. 4 No. 3 (2025): Jurnal Teknik Indonesia
Publisher : Publica Scientific Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58860/jti.v3i4.753

Abstract

Improvement of train services will always develop along with the development of passenger demand. Likewise in the case of Arjonegoro Train as one of the mainstay urban trains in East Java. The development of local trains, especially Arjonegoro Train, triggers the public's desire to get optimal service. The increasing expectations of passengers can be the basis for planning to improve train services. However, every improvement plan also requires a mature budget and cost design so that the plan can be implemented properly. The data used in this study are primary and secondary data. 199 respondents were successfully obtained as primary data. This study uses descriptive analysis methods and literature studies in determining the service improvements needed and the cost of improving these services will be estimated. This study will examine the level of passenger satisfaction with 6 service variables to determine what services need to be improved from Arjonegoro Train. The results of the study showed that the service with the highest negative sentiment was in the availability of seats, availability of travel schedules, availability of platforms and availability of canopies. This can be mitigated by improving services in the form of adding 1 Trainset and improving the platform and canopy at the station with an estimated cost requirement for improving the Arjonegoro train service of Rp. 110,373,211,939.