Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis Keselamatan dan Kesehatan Kerja Menggunakan Metode SWIFT (Structured What If Analysis Technique) Taslim, Rika; Yudistia, Fiki; Hamdy, Muhammad Ihsan
Seminar Nasional Teknologi Informasi Komunikasi dan Industri 2023: SNTIKI 15
Publisher : UIN Sultan Syarif Kasim Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Keselamatan dan Kesehatan Kerja (K3) merupakan hal yang harus dipenuhi oleh penyelenggara kerja. Selain untuk menjaga keselamatan pekerja, juga untuk meningkatkan produktivitas perusahaan. PT. Indah Kiat Pulp and Paper merupakan perusahaan swasta yang bergerak dibidang pembuatan kertas dan tissue. Kegiatan produksi dimulai dari pengolahan kayu menjadi lembaran kertas serta  pengolahan kertas bekas menjadi kertas industry. Perusahaan telah SMK3, namun masih terdapat kecelakaan kerja yang cukup tinggi dikarenakan kurangnya kesadaran pekerja terhadap penggunaan alat pelindung diri. Untuk mengetahui seberapa besar nilai risiko bahaya dilakukan observasi dan wawancara untuk mengetahui papararan bahaya pada kegiatann di area kerja dan memberikan usulan perbaikan terhadap stasiun kerja untuk mengurangi risiko kecelakaan kerja dengan menggunakan metode SWIFT (Structured What If Technique). Berdasarkan nilai RRN yang telah didapat, potensi bahaya yang diketahui dengan risiko tertinggi hingga risiko terendah. Setelah itu dilakukan pengelompokan bahaya kemudian didapatkan 6 prioritassutama, 8 prioritas menengah, 2 prioritas rendah dan 1 prioritas paling rendah.
Proposed Maintenance Planning for Screw Press Machines Using the Reliability Centered Maintenance (RCM) Method at PT. SIR Yudistia, Fiki; Suherman, Suherman; Hamdy, Muhammad Ihsan; Harpito, Harpito; Devani, Vera
IJIEM - Indonesian Journal of Industrial Engineering and Management Vol 7, No 1: February 2026
Publisher : Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/ijiem.v7i1.32415

Abstract

PT. SIR is one of the manufacturing companies engaged in processing oil palm fruit into crude palm oil (CPO) and Palm Kernel (PK) with a processing capacity of 45 tons/ hour. From the results of interviews and observations, it was found that the problem that occurred in the company was frequent sudden damage to the srew press machine which resulted in the machine and the production process stopping. The method used in this research is Reliability Centered Maintenance (RCM). The purpose of this research is to identify critical components on the srew press machine, develop a proposed maintenance schedule for each critical component at the Screw Press station, and provide recommendations on the type of periodic maintenance activities for critical components at the Screw Press station. From the results of the research obtained 5 critical components of the srew press machine which are recommended improvements from namely, bearings, shaft press, worm srew, press cage, and spur gear obtained Proposed maintenance schedule for each critical component, namely, on the bearing component the average damage time is 403 hours and the proposed maintenance schedule is 320 hours. Shaft press components average damage time 649.29 and proposed maintenance schedule 470 hours. Worm Srew components average damage 365.58 hours and proposed maintenance schedule 285 hours. Press Cage components average damage 737.5 hours and proposed maintenance schedule 570 hours. Spur Gear components average damage time 671.2 hours and proposed maintenance schedule 520 hours.