Heryanto Eryk, Irwan
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

INSTALLATION OF SOLAR PANELS FOR FILTRATION SYSTEMS ON KOI FISH CULTIVATION IN SUMBERINGIN KIDUL VILLAGE, TULUNGAGUNG REGENCY Asrori, Asrori; Hadi Susilo, Sugeng; Hidayat, Mohammad Noor; Heryanto Eryk, Irwan; Maskur, Maskur
Abdi Dosen : Jurnal Pengabdian Pada Masyarakat Vol. 6 No. 3 (2022): SEPTEMBER
Publisher : LPPM Univ. Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (744.062 KB) | DOI: 10.32832/abdidos.v6i3.1357

Abstract

The large electricity bill for aerators and filter pumps in Koi fish farming ponds is a problem for PPM (Community Service) partners. In addition, long-term power outages can cause fish death. This koi fish farming located in Tulungagung district has an area of ​​about 2000 m2 which is divided into several pond plots. The decline in the quality of Koi fish is also caused by poor filtration. The purpose of this activity is to install a micro-scale Solar power plant. This micro Solar Power Plant is used as a power source for filter pumps and pond aerators. The installed 600 Wp Solar Power Plant system consists of 4 solar panels with a capacity of 150 Wp each, an 850 VA hybrid inverter, and a 100 Ah VRLA battery. Electrical energy from Solar Power Plant can power a 75 W pump with a capacity of 26000 L/h. The installation of solar panels in this pool can produce an average of 2.5 kWh of electrical energy/day. So that the electricity savings from PLN can reach IDR. 108,352.5 per month.
UTILIZATION OF A PICO HYDRO POWER PLANT AT AL-IKHLAS ISLAMIC BOARDING SCHOOL IN MALANG REGENCY Hidayat, Mohammad Noor; Ronilaya, Ferdian; Heryanto Eryk, Irwan; Wibowo, Sapto; Asrori, Asrori; Saputra, Masramdhani
Abdi Dosen : Jurnal Pengabdian Pada Masyarakat Vol. 7 No. 4 (2023): DESEMBER
Publisher : LPPM Univ. Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/abdidos.v7i4.2098

Abstract

Al-Ikhlas Yatim Dhuafa Islamic Boarding School is ± 12.6 km from Malang City. If you look at it geographically, the location of this community service program is located at coordinates 7°58'27.0"S 112°48'14.8"E. To support activities in this tourist area, electrical energy is really needed, especially for lighting facilities and charging electronic equipment. This Community Service Program will be implemented between April and November 2022 with activities in the form of building a pico hydro power plant in the Al-Ikhlas Yatim Dhuafa Islamic Boarding School area, Singosari District, Malang Regency. In carrying out this community service program, there is one activity partner, namely the Al-Ikhlas Yatim Dhuafa Islamic Boarding School with a total of 6 personnel. The results of this community service program are the installation and operation of a pico hydro power plant with a capacity of 1000 watts. This pico hydro power plant can meet electricity needs in the Islamic boarding school area with a total power of around 450 watts. In order for the pico hydro power plant to operate according to its capacity, it is necessary that the operation and maintenance of the system equipment be carried out correctly and on a schedule. For this reason, the transfer of knowledge and skills to work partners, namely the management of the Al-Ikhlas Yatim Dhuafa Islamic Boarding School, has been carried out.