Hi.Muhammad, Amiruddin
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis Pengelolaan Retribusi Terhadap Kebutuhan Parkir Kendaraan Bermotor di Pelabuhan Goto sarimalaha. Usman, Fitri Sarilina; Hi.Muhammad, Amiruddin; Altarans, Indra
Jurnal Ilmiah Wahana Pendidikan Vol 11 No 12.A (2025): Jurnal Ilmiah Wahana Pendidikan
Publisher : Peneliti.net

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study analyzes the management of motor vehicle parking fees at Goto Sarimalaha Port and its alignment with actual parking needs. Current management is manual, potentially leading to revenue leakage and a lack of public awareness. Therefore, a transparent, accountable, and technology-based system is needed. This research uses quantitative methods, focusing on two- and four-wheeled vehicles, and is expected to provide theoretical benefits for the development of transportation management science and practical benefits for port managers and local governments in improving the efficiency and quality of parking services. Based on the research results at Goto Sarimalaha Port, the motor vehicle parking fee management system is still suboptimal, largely manual, potentially leading to revenue leakage, and a lack of public awareness of payment procedures for visitors. Validity analysis shows that most questions related to fee management have a significant correlation with meeting parking needs, particularly items P3, P4, and P8, which are significant at the 0.01 level. This supports the hypothesis that fee management—including tariff policies, payment systems, and fund allocation—directly contributes to improving parking facilities and meeting port user needs.
Analisis Perbandingan Rencana Anggaran Biaya (Rab) Bangunan Menggunakan Metode Sni dan Bow Jamrud, Faris; Hi.Muhammad, Amiruddin; Altarans, Indra
Jurnal Ilmiah Wahana Pendidikan Vol 11 No 12.A (2025): Jurnal Ilmiah Wahana Pendidikan
Publisher : Peneliti.net

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This research compares cost estimations between SNI and BOW methods for the Lelilef Health Center construction project in Central Halmahera. The study was motivated by health service urgencies in the mining area, a large project scale (Rp 7,929,854,690.00), mixed funding (DAK + CSR), and implementation challenges (delayed worker payments). The research aims to determine the cost estimations using SNI and BOW methods and identify the more economical approach. Data analysis involves evaluating Bill of Quantity data, understanding project requirements, summarizing BOW and SNI analyses, and collecting price lists for materials, labor, and equipment. The study found that the cost estimation using the SNI 2008 method was Rp 4,312,815,870.00, while the BOW method resulted in Rp 4,990,646,920.00. The SNI 2008 method was 13.58% more economical due to lower coefficient values, especially in reinforcement, concrete work and bricklaying. The research suggests that consultants should use clear, regulation-based methods and conduct thorough cost calculations with appropriate analysis methods to achieve economical and specification-compliant results. Further research is recommended to investigate factors causing project delays and cost impacts.