Claim Missing Document
Check
Articles

Found 2 Documents
Search

ANALISIS RAB STRUKTUR BETON GEDUNG TAMAN BUDAYA MENGGUNAKAN REVIT Prio, Prio; Putra, Agung Dwi; Shulhan, M. Afif; Galuh, Dimas Langga Candra
RENOVASI : Rekayasa Dan Inovasi Teknik Sipil Vol 10 No 2 (2025): Oktober
Publisher : Department of Civil Engineering, Faculty of Engineer, Universitas Sarjanawiyata Tamansiswa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30738/renovasi.v10i2.21192

Abstract

Along with the development of technology and various technological advancements in the construction sector, the use of Building Information Modeling (BIM) technology has increased, as some budget planning methods still use conventional/analytical methods. This study was conducted to determine the accuracy of the BIM and analytical methods in preparing the Cost Budget Plan (RAB) by comparing the RABs of both methods. The results obtained from the comparison of concrete and reinforcement volume requirements using the analytical method were higher than those using the BIM (Building Information Modeling) method, with differences of 6,430 m3 (1.16%) and 2,293.102 kg (2.63%), respectively. The difference in concrete and reinforcement costs between the BIM (Building Information Modeling) method and the analytical method was higher, at Rp 8,065,990.45 and Rp 114,601,701.09, respectively, with a concrete cost ratio of 1.11% and reinforcement cost of 1.94%. The total Cost Budget Plan (RAB) using the analytical method was 0.71% higher by Rp 56,846,733.08 than the Building Information Modeling (BIM) method, with a total Cost Budget Plan (RAB) of only Rp 7,925,716,320.58 and a total Cost Budget Plan (RAB) using the analytical method of Rp 7,982,563,053.
ANALISIS DAERAH RAWAN KECELAKAAN LALU LINTAS (BLOCK SPOT) DIJALAN YOGYAKARTA – PARANGTRITIS KABUPATEN BANTUL Aziz, Itsnaini; Sutrisno, Widarto; Galuh, Dimas Langga Candra; Ardianto, Tri
RENOVASI : Rekayasa Dan Inovasi Teknik Sipil Vol 10 No 2 (2025): Oktober
Publisher : Department of Civil Engineering, Faculty of Engineer, Universitas Sarjanawiyata Tamansiswa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30738/renovasi.v10i2.21211

Abstract

As the number of vehicles increases with the increase in world population, the vehicle density on this road continues to increase every year. year. . Therefore, the large number of traffic accidents that frequently occur on highways poses challenges for all traffic participants. The research method used is survey and collection. data. . From the results of data analysis and discussion, after performing many calculations and analyzing traffic accident data on the Yogyakarta - Prangtritis route, Bantul district, the location and number of black spots were found. Accidents occurred on Yogyakarta - Prangtritis road, Bantul Regency, including research results on the level of compensation between accident incidents and factors affecting them, proposed solutions to reduce the number accident on the highway and have the ability to make repairs so that no more accidents occur.