Claim Missing Document
Check
Articles

Found 6 Documents
Search

Pengembangan Kawasan Wisata Pantai Bunga Indah Desa Kuhanga Kec. Bintauna, Kab. Bolaang Mongondow Utara dengan Menggunakan Pendekatan Arsitektur Tropis Eka Y. Ramulya; Beby Sintia Dewi Banteng; Frans Mitran Ajami
Jurnal Ilmu Teknik Terapan Vol 1 No 2 (2025): Journal of Applied Engineering Science (Desember)
Publisher : Politeknik Kebangsaan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.65177/jaes.v1i2.24

Abstract

As an archipelagic nation with the longest coastline in Southeast Asia, Indonesia holds immense potential for marine tourism. This sector plays a crucial role in economic development, especially in coastal regions. One such promising destination is Bunga Indah Beach in North Bolaang Mongondow Regency, North Sulawesi. Despite a significant increase in tourist visits, the development of this beach remains suboptimal, particularly concerning its infrastructure and planning. The existing facilities are self-built and poorly maintained, giving the area a neglected appearance. Another key issue is the lack of a design approach that is responsive to the tropical climate. Previous studies on coastal tourism development often focus solely on promotion or facilities, without integrating a tropical architectural approach that is adaptive to both the climate and local potential. Therefore, this study proposes the development of Bunga Indah Beach tourism area using a tropical architecture approach to create a space that is comfortable, sustainable, and harmonious with its environment. The analysis shows that implementing tropical architecture is an effective solution. The design of facilities such as accommodation, recreational areas, and educational spaces should consider functional, aesthetic, and environmental sustainability aspects. This approach not only enhances visitor comfort and energy efficiency but also strengthens the local architectural identity. Ultimately, this area is expected to become a major attraction that drives local economic growth while preserving ecological integrity.
Perancangan Perpustakaan Umum Daerah di Kota Gorontalo dengan Konsep Arsitektur Modern Siti Nurullah B. Sue; Beby Sintia Dewi Banteng; Frans Mitran Ajami
Jurnal Ilmu Teknik Terapan Vol 1 No 2 (2025): Journal of Applied Engineering Science (Desember)
Publisher : Politeknik Kebangsaan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.65177/jaes.v1i2.25

Abstract

This study addresses the lack of a representative and modern public library facility in Gorontalo City, which is a strategic center for education, trade, and services. Despite its potential, the city's current public library is not widely known due to its non-strategic location, resulting in low public engagement. Therefore, there is a need for a new public library that is not only functional and easily accessible but also equipped with modern technology and a captivating design to attract more visitors. The research focuses on the planning and design of a public regional library using a Modern Architectural Concept. This concept is applied to create a building that is highly functional, aesthetically pleasing, and adaptable to the dynamic needs of an urban community. The design incorporates various supporting facilities, such as an outdoor reading garden, discussion rooms, and accessibility features for people with disabilities. An efficient circulation and utility system is also integrated to enhance comfort, safety, and overall appeal. The findings from the planning and analysis indicate that this design contributes significantly to improving the quality of literacy in the community. Furthermore, the project has the potential to become a new landmark for Gorontalo City, serving as a representative educational facility and public space. This research demonstrates how modern architectural principles can be used to create an attractive, accessible, and beneficial public institution that meets the community's needs and fosters a culture of reading and learning.
Analisis Perbandingan Harga Satuan Pekerjaan Pasangan Bata Merah Pada Proyek Gedung Perkuliahan Iain Sultan Amai Gorontalo Wulan Ruftiani; Beby Sintia Dewi Banteng; Arfan Usman Sumaga
Composite Journal Vol. 4 No. 2 (2024): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v4i2.133

Abstract

Tahap perencanaan proyek adalah tahap yang sangat penting, di mana manajemen biaya berfungsi untuk menyusun estimasi biaya proyek. Pemilihan metode analisis yang tepat menjadi kunci utama sebagai dasar dalam penyusunan estimasi anggaran biaya proyek. Penelitian ini bertujuan untuk membandingkan efisiensi harga satuan pekerjaan pasangan bata merah antara metode Analisis Harga Satuan Pekerjaan (AHSP) Permen PU No. 8 Tahun 2023 dan metode lapangan pada proyek pembangunan Gedung Perkuliahan IAIN Sultan Amai Gorontalo. Penelitian ini mengukur produktivitas tenaga kerja, koefisien tenaga kerja dan bahan, serta membandingkan harga satuan pekerjaan dari kedua metode tersebut. Data penelitian diperoleh dari pengamatan langsung di lapangan serta data sekunder dari perencana proyek. Hasil penelitian menunjukkan bahwa metode lapangan menghasilkan biaya yang lebih rendah dibandingkan dengan AHSP Permen PU No. 8 Tahun 2023. Total biaya menggunakan metode lapangan untuk pasangan bata merah sebesar Rp. 377,371,179, sementara menggunakan AHSP Permen PU No. 8 Tahun 2023 mencapai Rp. 408,009,535. Dengan demikian, metode lapangan lebih efisien dari segi biaya dibandingkan metode AHSP 2023.
Analisis Risiko Keselamatan dan Kesehatan Kerja Menggunakan Metode HIRARC (Studi Kasus Proyek Pembangunan Gedung Perkuliahan Iain Sultan Amai Gorontalo) Reza Oktavia L. Parentai; Beby Sintia Dewi Banteng; Arfan Usman Sumaga
Research Review: Jurnal Ilmiah Multidisiplin Vol. 3 No. 2 (2024): Research Review: Jurnal Ilmiah Multidisiplin (Agustus 2024 - Januari 2025)
Publisher : Transbahasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54923/researchreview.v3i2.109

Abstract

Occupational Safety and Health is essential for construction work, but there are still some problems in implementing it. Among the challenges include lack of awareness and understanding of the importance of OHS, a lack of adequate training for workers, and a lack of supervision and enforcement of OHS-related regulations. Therefore, research and risk analysis of OHS in construction work is needed to find potential hazards, evaluate risks, and develop effective control solutions. This research is categorized as a quantitative and also descriptive observational approach. This study also used a questionnaire based on the HIRARC method and conducted a risk analysis on the IAIN Sultan Amai Gorontalo Lecture Building Construction project. out of 50 respondents, there were the same answers and repeated in each job. Thus, 12 types of risks were obtained with a total of 40 risk items identified. These risks are the most significant and recurring risks, therefore require special attention in risk planning and management. From the results it can be concluded that the stages of identifying risk management in the Upper structure work are identifying risks, risk assessment, and risk control.
Analisis Faktor–Faktor yang Mempengaruhi Kinerja Tukang pada Proyek Konstruksi Wahyu Bumulo; Beby Sintia Dewi Banteng; Arfan Utiarahman
Research Review: Jurnal Ilmiah Multidisiplin Vol. 4 No. 1 (2025): Research Review: Jurnal Ilmiah Multidisiplin (Februari 2025 - Juli 2025)
Publisher : Transbahasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54923/researchreview.v4i1.125

Abstract

Occupational Safety and Health is essential for construction work, but there are still some problems in implementing it. Among the challenges include lack of awareness and understanding of the importance of OHS, lack of adequate training for workers, and lack of supervision and enforcement of OHS-related regulations. Therefore, research and risk analysis of OHS in construction work is needed to find potential hazards, evaluate risks, and develop effective control solutions. This research is categorized as quantitative and also descriptive observational approach. This study also used a questionnaire based on the Hirarc method and conducted a risk analysis on the IAIN Sultan Amai Gorontalo Lecture Building Construction project. out of 50 respondents there were the same answers and repeated in each job. Thus, 12 types of risks were obtained with a total of 40 risk items identified. These risks are the most significant and recurring risks, therefore require special attention in risk planning and management. From the results it can be concluded that the stages of identifying risk management in the Upper structure work are identifying risks, risk assessment, and risk control.
Identifikasi Potensi Bahaya Dan Pencegahan Kecelakan Kerja Bekisting Pada Pekerjaan Proyek Pembangunan Gedung Bahasa Putri Melati Sukma Halid; Moh Yusuf Tuloli; Beby Sintia Dewi Banteng
Research Review: Jurnal Ilmiah Multidisiplin Vol. 4 No. 1 (2025): Research Review: Jurnal Ilmiah Multidisiplin (Februari 2025 - Juli 2025)
Publisher : Transbahasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54923/researchreview.v4i1.128

Abstract

The Language Office Building Construction Project in Gorontalo Province primarily focuses on Occupational Health and Safety (OHS), aiming to prevent work accidents, injuries, or illnesses caused by factors such as machinery, chemicals, the work environment, and human actions. this study aimed to identify potential hazards, asses the risk of work accidents, and analyze preventive measures for accidents during the formwork installation activities. The methodology employed was a semiquantitave risk analysis method, referencing AS/NZS 4360:2004, and the data were analyze using the Statistical Package for the Social Sciences (SPSS). Based on the data analysis, identifying potential hazards and the risk of work accident in the formwork installation, reinforcing, and concrete pouring activities at the Language Office Building revealed that only a few hazards were deemed acceptable. This was attributed to a lack of awareness regarding using Personal Protective Equipment (PPE) and limited knowledge about workplace safety, despite the availability of PPE. The preventive action identified in the study fell into the “Substantial” risk category, with a risk value of 90, which could be reduced to “acceptable” levels through control such as providing shock absorbers, conducting biannual medical check-ups, and enhancing supervision and worker awareness regarding the proper use of PPE.