Fitriyanti Mayasari
Universitas Hasanuddin

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Performance placement of BESS in the Sulawesi-Southern interconnected power system Zaenab Muslimin; Indar Chaerah Gunadin; Fitriyanti Mayasari; Muhira Dzar Faraby; Asma Amaliah; Isminarti Isminarti
International Journal of Power Electronics and Drive Systems (IJPEDS) Vol 16, No 4: December 2025
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijpeds.v16.i4.pp2819-2830

Abstract

Frequency regulation and active power loss management are crucial aspects of power system operations. Battery energy storage systems (BESS) have emerged as an innovative solution to enhance grid performance, especially in addressing frequency fluctuations and reducing power losses. This study explores the role of BESS in optimizing frequency regulation and managing active power losses in the power system through several BESS integration scenarios. In this study, a BESS with a capacity of 8.437 MW was used and analyzed using symmetric steady-state simulations in DigSILENT PowerFactory software. The simulations aim to test the effectiveness of BESS in frequency regulation and minimizing active power losses in the Southern Sulawesi (Sulbagsel) system. The analysis results show that implementing BESS can respond effectively to both over-frequency and under-frequency conditions in the Sulbagsel system. In the discharge scenario, BESS can reduce the system's average frequency by 0.02 Hz and decrease active power losses by up to 1.09 MW. Conversely, in the charge scenario, active power losses increase by 1.22 MW when the BESS is installed on Tonasa Bus. This study provides valuable insights for developing BESS-based frequency regulation strategies that contribute to the stability and efficiency of the power system.