Implementation of Green Building Concept in High Rise Developments Through Appropriate Site Development (ASD) Rezi Berliana Yasinta; Moch. Fariz Aditya; Fadhlan Shiddiq; Afifah Nur Agyta; Muhammad Rakha Ammar Farras; Muhammad Farid Alfawaz
Potensi: Jurnal Sipil Politeknik Vol. 27 No. 1 (2025): Potensi: Jurnal Sipil Politeknik
Publisher : Department of Civil Engineering, Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35313/potensi.v27i1.6462

Abstract

This study evaluates the implementation of green building criteria based on Appropriate Site Development (ASD) in the Jakarta State University Postgraduate Building. Using the Greenship assessment tool from the Indonesian Green Building Council (GBCI), the analysis focuses on ASD, which includes prerequisite and credit criteria. The building scored 8 out of 17 points, indicating partial compliance with ASD standards. Notable strengths include the Microclimate criterion, where all requirements were met. However, critical shortcomings were identified in Rainwater Management, which scored zero, reflecting unmet criteria. Similar issues were observed in Bicycle User Facilities and Site Landscape, which also received zero scores. Public transportation access was another area requiring improvement to support user mobility. Challenges in implementing the Green Building concept include limited land availability and high initial costs for environmentally friendly technologies. To address these issues, the study recommends enhancing land management by increasing green spaces, adding facilities for cyclists and eco-friendly vehicles, and involving the community in sustainability initiatives. These findings highlight areas for improvement and provide a framework for the sustainable development of educational buildings. This research aims to contribute to broader efforts in promoting green building practices within the education sector.
Perancangan Metode Perakitan Gantry Crane Sistem Knock-Down untuk Pekerjaan Penumpukan Fan Wall Unit Fadhlan Shiddiq; Sittati Musalamah; Lenggogeni
Jurnal Serambi Engineering Vol. 11 No. 3 (2026): Juli 2026
Publisher : Faculty of Engineering, Universitas Serambi Mekkah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pekerjaan instalasi Fan Wall Unit (FWU) pada proyek data center memerlukan sistem pengangkatan yang mampu dirakit dan dioperasikan secara efektif. Salah satu alternatif yang digunakan adalah gantry crane sistem knock-down yang dirancang modular sehingga dapat dipasang dan dibongkar secara bertahap sesuai kebutuhan pekerjaan. Penelitian ini bertujuan merancang dan memvisualisasikan metode perakitan gantry crane sistem knock-down berdasarkan urutan pemasangan, stabilitas struktur selama erection, dan keterlaksanaan metode kerja. Penelitian menggunakan pendekatan engineering process design melalui penyusunan metode kerja berbasis assembly sequence. Tahapan penelitian meliputi identifikasi komponen struktur dan alat kerja, penyusunan urutan perakitan, visualisasi tahapan erection, serta evaluasi teknis metode perakitan. Hasil penelitian menunjukkan bahwa metode perakitan yang disusun mampu membentuk kestabilan struktur secara progresif melalui pemasangan bertahap elemen kolom, balok pengikat, girder, dan sistem lifting. Penggunaan pengikatan sementara pada tahap awal erection berperan dalam menjaga alignment dan kestabilan struktur sebelum sistem portal terbentuk secara penuh. Selain itu, sistem modular knock-down dan sambungan baut memungkinkan proses assembly dilakukan menggunakan alat kerja umum tanpa memerlukan peralatan erection berskala besar. Berdasarkan evaluasi teknis, metode yang dirancang telah memenuhi prinsip dasar erection struktur baja dalam aspek assembly sequence, kestabilan sementara struktur, dan constructability.