Waste water which is produced by population of Denpasar City has notbeen managed properly, therefore it will potentially contaminate the environment. Inorder to solve this problem, the Government of Denpasar City has been granted loanby the Japan Bank for International Corporation (JBIC), and has been use for thedevelopment of sewerage system called Denpasar Sewerage Development Project(DSDP).During construction phase that has been executed, variety of risk was found which ispotentially obstruct project implementation, and even cancel part of the project. Thestudy is presented to identify risk comprehensively, through brain storming andstructured interviews. As result, the risk have been identified 74 (seventy four) risk,which include risk souces of 5 (6,76%) unacceptable risk, 17 (22,97%) undesirablerisk, 22 (29,73%) acceptable risk, and 30 (40,54%) negligible risk.Unacceptable andundesirable risk which considered as major risk come from political risk 1 risk(4,65%), environmental risk 6 risk (27,27%), planning risk 1 risk (4,55%), economical risk 1 risk (4,55%), financial risk 1 risk (4,55%), project risk 8 risk (36,36%),technical risk 2 risk (9,09%), and others 2 risk (9,09%) are include on human risk.The results show that risk sources of environmental and project risk are dominant, andshould be handled specially by the stakeholder who responsible to this project.
Copyrights © 2005