Dinamika Bahari: Journal of Maritime Dynamic
Vol 2 No 2 (2021): Edisi Oktober 2021

Terlambatnya Proses Pendinginan Muatan Gas Polymer Grade Propylene di Kapal LPG/C Coral Millepora

Mavji Mochammad Fauzi (Politeknik Ilmu Pelayaran Semarang)
Akhmad Ndori (Politeknik Ilmu Pelayaran Semarang)



Article Info

Publish Date
26 Oct 2021

Abstract

The LPG Carrier is one of the ships that carries liquid gas cargoes below -48o C. The LPG Carrier has facilities in the form of a reliquefaction plant that uses seawater as a coolant for gas cargo. Therefore, the reliquefaction plant has an important role in the smooth loading and unloading process. If one of the reliquefaction plant particles is damaged, of course the cooling process of the polymer grade propylene gas load will be hampered. The purpose of this study is to describe the problem in the cooling process of polymer grade propylene load. The authors conducted research using a qualitative descriptive method through an interview approach, direct observation of the object of research, and supported by paper-based documents or photos. Based on the results of the study, it was found that the causes of delays in the cooling process of polymer grade propylene gas cargo, namely the influence of weather, sea water content, clogged sea water filters, clogged condenser tubes, and condenser shell tube leaks.

Copyrights © 2021






Journal Info

Abbrev

jdb

Publisher

Subject

Education Engineering Environmental Science Mechanical Engineering Transportation

Description

Dinamika Bahari merupakan jurnal berkala bidang nautika, teknika dan tata laksana angkutan laut dan kepelabuhanan yang dimiliki Politeknik Ilmu Pelayaran (PIP) Semarang yang terbit 2 kali setahun, yaitu pada bulan Mei dan Oktober. Dinamika Bahari memuat hasil penelitian, ide, dan gagasan dosen, ...