Jurnal Teknik Industri
Vol. 2 No. 2 (2021): JURNAL TEKNIK INDUSTRI : NOVEMBER 2021

Analisa Time Study SAW Assy Produksi Bucket PT. XYZ

Andriani, Andriani (Unknown)
Setyono, Fajar (Unknown)
Qolik, Muhammad Abdul (Unknown)
Suwarno, Agus (Unknown)



Article Info

Publish Date
06 Dec 2021

Abstract

PT. XYZ is a manufacturing company that manufactures heavy equipment components made of steel plates. The level of competition in the heavy equipment components industry is getting tighter and customer demands are getting more detailed on the quality of spare parts, thus companies are required to be able to meet customer needs without neglecting the quality and quantity of production target. One of the factors to increase the efficiency of a company globally is to increase productivity, so that customer trust increases and employee welfare improves. Various methods to increase productivity, one of them by using the time study method in the SAW of Assy Bucket section to determine the standard production time, so that the best alternative working methods and optimal results can be selected. As well as policies related to bucket production so that production achievement targets can be taken easily. In addition to improving the working method, it is hoped to improve the skills of the operator so that the quality of the bucket hardening results is above average and minimize the occurrence of reject products. Operating times and waiting cranes that cause delays can be significantly reduced. From the analysis of the time study method, the average normal time is 476.7 minutes. And the standard time reduction is 954.2 minutes.

Copyrights © 2021






Journal Info

Abbrev

JUTIN

Publisher

Subject

Control & Systems Engineering Industrial & Manufacturing Engineering

Description

Supply Chain Management Lean Manufacturing Ergonomics Decision Analysis Project management Optimization Process Modeling System Systems and Maintenance Management Product ...