Jurnal Geominerba
Vol 5 No 2 (2020): Jurnal Geominerba 2020

ANALISIS PERENCANAAN STUDI KELAYAKAN POTENSI PANAS BUMI UNTUK PENGEMBANGAN SPA (SOLUS PER AQUA), DI KABUPATEN NGADA, PROVINSI NUSA TENGGARA TIMUR

Aperta Ledy Alam (PPSDM KEBTKE, KESDM)
Fiati Nurmaya (Politeknik Energi dan Pertambangan (PEP) Bandung, KESDM)



Article Info

Publish Date
25 Dec 2020

Abstract

Geothermal direct use activity can be also be conducted through the stages of the initial survey (preliminary), pre-feasibility study, feasibility study, utilization, and operations. Manifestation location, which is hot spring, also be disseminated at many points in Ngada Regency, East Nusa Tenggara Province. In many locations of hot spring existence, has been used for public bath. Because some location is close to public residential and is in the route of public transportation road, like as Mengeruda. The location of Mengeruda hot springs has accessibility which is asphalt road for public transportation that have 3.5 meter width. This hot springs is not too far from commercial airport, Bajawa. Several inns like small hotel and quest house, have been around location of Mengeruda hot springs. This is becoming contribution from tourism sector. Feasibility study activity consists market analysis, technical analysis, and financial analysis. These three of analysis activity will give the recommendation as output and result from feasibility study.

Copyrights © 2020






Journal Info

Abbrev

ppsdm22

Publisher

Subject

Earth & Planetary Sciences Education Engineering Other

Description

The GEOMINERBA journal is published by the Center for Human Resources Development, Geology, Minerals and Coal which is published every June and December. Published publications related to the Development of Human Resources in the Field of Geology, Minerals and ...