Anticipation and Solution of Equipment Cost Overrun Factor in Toll Road Construction Project

Isfahani, Muhammad Nafhan (Unknown)
Sumirin, Antonius (Unknown)
Wibowo, Kartono (Unknown)



Article Info

Publish Date
22 Aug 2026

Abstract

This paper presents research on anticipation and solutions for equipment cost overruns on toll road construction projects in Jabodetabek. A survey was conducted with 76 respondents (Managers, Consultants, Contractors). The dominant factor causing equipment cost overrun is breakdown of heavy equipment (mean = 4.32), followed by delay in mobilization (mean = 4.18). Preventive maintenance schedules and contractual penalty clauses are established as key solutions.

Copyrights © 2025






Journal Info

Abbrev

jsa

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Transportation

Description

Jurnal ini menerima naskah asli dari penelitian yang original, artikel tentang kebijakan, dengan cakupan penelitian di bidang teknik sipil dan teknik arsitektur. Scope Jurnal ini sebagai berikut: - Traffic Engineering - Water Resources Engineering, - Construction Management - Structural Engineering, ...