Journal of Civil Engineering and Vocational Education
Vol. 11 No. 3 (2024): September 2024

Study of Final Business Case Sensitivity Analysis in the Government and Business Entity Cooperation (KPBU) Project in the Drinking Water Sector

Jasmin, Feby Wucika (Unknown)
Ophiyandri, Taufika (Unknown)
Hidayat, Benny (Unknown)



Article Info

Publish Date
30 Sep 2024

Abstract

The purpose of this study is to analize sensitivity of the final business case in public private partnership (PPP) projects. The outcome of this study will provide an overview and limits on changes in the parameters forming the investment. Therefore, a sensitivity analysis was carried out to changes in price, initial cost and interest. The results of the study shows the three changes show that the most sensitive parameter is price changes. Meanwhile, due to the decrease in absorption volume at the offtaker in Jakarta, two efforts were made, namely by increasing the minimum tariff to Rp. 3,846, - or by increasing the concession period to 45 years, this project can be said to be investment worthy.

Copyrights © 2024






Journal Info

Abbrev

CIVED

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Education Engineering Environmental Science Transportation

Description

CIVED Is a periodical scientific journal published three times a year, in March, June and September by the Department of Civil Engineering, Faculty of Engineering, Padang State University. The CIVED journal is a medium for publishing the results of scientific research by students, academics, ...