Pembuatan Peta Resiko Bencana di Desa Kubang Tangah Kota Sawahlunto dengan Metode Arc Toolbox Adji, Bayu Martanto; Istijono, Bambang; Ophiyandri, Taufika; Narny, Yenny; Zis, Sirajul Fuad; Yuliza, Yenni; Desirwan, Haikal Fikri; Madjid, Tsabita Alliya; Ahmad, Dzakwan Fathullah; Abinight, Akbaar
Jurnal Talenta Sipil Vol 7, No 1 (2024): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v7i1.398

Abstract

Landslide movement is the activity of a balance disturbance process that causes the movement of masses of soil and/or rock from higher to lower areas. The cause of landslides is that the driving force on the slope is greater than the resisting force. Several factors cause landslides such as rainfall, steep slopes, soil density, rock type, land use and vibration. Sawahlunto City is one of 19 cities/regencies in West Sumatra Province that has a high level of vulnerability to landslides. Areas prone to landslides can be identified by utilizing remote sensing data and geographic information systems. This service is carried out by making maps of areas prone to landslides using parameters that cause landslides, including rainfall, soil type, height, slope and land use. These parameters will be processed and analyzed with the help of the ArcToolbox method, where ArcToolbox can be used to detect landslide areas in Kubang Tangah Village. The analysis process is carried out by using the spatial analysis tools feature found in ArcGIS software. Community service produces a slope map that can illustrate the vulnerability of landslides. Obtain results in the form of a landslide vulnerability level map which has 4 vulnerability classes, including non-prone vulnerability class, low vulnerability class, medium vulnerability class, and high vulnerability class.
Pengaruh Modal Sosial dan Modal Insani terhadap Kinerja Usaha Kecil dan Menengah di Kota Padang Lawas Utara Replita; Effendi, Nursyirwan; Ophiyandri, Taufika; Miko, Alfan; Hardana, Ali
Jurnal Masharif al-Syariah: Jurnal Ekonomi dan Perbankan Syariah Vol 9 No 5 (2024)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30651/jms.v9i5.24605

Abstract

Industri makanan dan minuman di Padang Lawas Utara membutuhkan banyak tenaga kerja. Perusahaan menggunakan tenaga kerja sebagai modal sosial dan insani. Tujuan penelitian ini adalah untuk menganalisis secara deskriptif, menganalisis pengaruh modal insani dan modal sosial terhadap kinerja UKM makanan dan minuman di Kota Padang Lawas Utara, dan kemudian membuat rekomendasi untuk meningkatkan kinerja UKM. Metode yang digunakan dalam penelitian ini termasuk analisis nilai kinerja (IPA), diagram batang ikan, dan analisis rumus struktural (SEM) dengan pendekatan Partial Least Squares (PLS). Hasil analisis SEM menunjukkan bahwa. Akibatnya, disarankan untuk meningkatkan kinerja UKM melalui kegiatan pendukung, seperti membangun sistem pengendalian mutu dan standar pelaksanaan produksi, memperbaiki fasilitas yang dimiliki UKM, dan berpartisipasi dalam pelatihan yang meningkatkan kemampuan karyawan UKM.
Bantuan Ekonomi Pedagang Masyarakat Kota Padangsidimpuan dengan Adanya Julo-Julo Replita, Replita; Effendi, Nursyirwan; Ophiyandri, Taufika; Miko, Alfan
Jurnal Masharif al-Syariah: Jurnal Ekonomi dan Perbankan Syariah Vol 10 No 1 (2025)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30651/jms.v10i1.25554

Abstract

Tujuan dari penelitian ini adalah untuk mengetahui jenis pertukaran sosial dalam kegiatan Julo-Julo dan bagaimana pertukaran sosial berfungsi dalam hal ekonomi. Penelitian ini dilakukan dengan pendekatan kualitatif dan metode fenomenologi. Observasi, wawancara, dan dokumentasi digunakan untuk mengumpulkan data. Teori resiprositas adalah teori yang digunakan dalam penelitian ini. Menurut informasi yang dikumpulkan dari pertukaran sosial Julo-Julo di Pasar Sangkumpal Bonang Kota Padangsidimpuan, bahan-bahan pernikahan dan hajatan yang digunakan oleh anggota Julo-Julo untuk acara pernikahan dan hajatan dikumpulkan oleh ketua pengurus Julo-Julo. Metode Julo-Julo menggunakan bahan pokok sesuai dengan kriteria, di mana kriteria tersebut adalah anggota Julo-Julo yang paling penting, yaitu untuk memenuhi kebutuhan materi. Dalam masyarakat, ada dua jenis pertukaran: resiprositas sebanding dan resiprositas umum. Fungsi pertukaran Julo-Julo bagi masyarakat di Pasar Sangkumpal Kota Padangsidimpuan adalah untuk mengatasi masalah yang terkait dengan mengadakan acara pernikahan dan hajatan, seperti kekurangan modal uang, kekurangan tenaga kerja rewang, dan kekurangan sarana dan prasarana
Risk Analysis of Post-Disaster Logistics Distribution Failure Herdianti, Wenny; Adji, Bayu Martandto; Ophiyandri, Taufika
CIVED Vol. 11 No. 3 (2024): September 2024
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v11i3.603

Abstract

In conducting logistical activities of disaster relief in natural disaster management. it is often not possible to implement as it should. and there are always potential risks that arise. One of the problems faced is the delayed distribution of post-disaster logistics. Therefore. risk management is necessary so that disaster relief logistics activities can run well. In addition. there is a need for a risk mitigation strategy to mitigate potential risks in the post-disaster logistics distribution process. The study aims to identify potential risks to post-disaster logistics distribution activities and find out which risk management strategies are a priority to address immediately. Failure Mode and Effect Analysis (FMEA) is a systematic approach to identifying failures and giving a value or score to each risk. From the results of the study. 32 potential risks occurred. As a result. 13 risks were identified with RPN values above critical point values. Thus. 13 were obtained as priority management risks. where the risks with the top 3 RNA values are Disruption of the post-earthquake telephone network Difficulty coordination of the logistics team with a rating of 25.98. Long logistic delivery travel time with a value of 21.86. and Condition of the vehicle used is not good with a score of 21.66. Thus. for 13 of these risks. mitigation is carried out for treatment priorities. Risk management strategies are applied to risks that have RPN values above critical values to minimize the impact.
Evaluation of Implementation Procurement Policies Via E-Catalog for Construction Work (Case Study: National Road Implementation Agency For West Sumatera Region) Purwono, Eko; Ophiyandri, Taufika; Hidayat, Benny
CIVED Vol. 11 No. 3 (2024): September 2024
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v11i3.640

Abstract

National Road Implementation Agency (BPJN) for West Sumatera Region has an important role in managing road infrastructure in the West Sumatra Province. In the context of procurement for construction implemented by BPJN for West Sumatra, the use of e-catalogs is a solution to simplify the procurement process. The aim of this research is to evaluate how it is implemented, analyze supporting factors, analyze weaknesses and evaluate the benefits of the policy of procurement via e-catalog in construction work. This research uses a qualitative approach with a semi-structured interview method and Data analysis used thematic analysis. The results of the research show that the implementation of the policy for procurement via e-catalog for construction work at the National Road Implementation Agency for West Sumatera Region has been successfully carried out without any significant problems. Implementation of the policy for procurement via e-catalog in construction work is influenced by various supporting factors, including ease of application, socialization and technical guidance, adequate infrastructure, staff competence and coordination, as well as clear regulations and guidelines. Weaknesses of e-catalogs such as no information on remaining package capabilities, main equipment having to be proprietary, provider selection opportunities, limited service locations, and complete product limitations, all have a significant impact on the effectiveness and efficiency of the procurement process. The E-catalog system provides various significant benefits for construction work. Procurement time efficiency, fair prices, transparent systems, price negotiation, work outcomes, bid documents, provider selection, as well as motivation and competitiveness are some of the key benefits identified.
Analysis of the Causes of Deviations in the Implementation of Construction Work Contracts Based on Verdict ‘Ainaqi, Qorri; Ophiyandri, Taufika; Hidayat, Benny
CIVED Vol. 11 No. 3 (2024): September 2024
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v11i3.641

Abstract

Construction Work is the whole or part of the activities that include the construction, operation, maintenance, demolition, and rebuilding that are regulated in a Construction Contract. In the implementation of the Construction Contract, several problems cause deviations. The purpose of this research is to analyze the causes of deviations in a Construction Contract based on Verdict. The research data was obtained from the Supreme Court Repository page by searching for Verdict related to implementing Construction Contracts. The limitation of this research is a case that has been decided in the last 10 years in the District Court in West Sumatra. The search results obtained 9 verdicts. The method used to analyze the data is the Rich Picture Diagram (RPD). Validation and refinement are carried out using the Interview method from the results of secondary data analysis. The outcome of this research is the causes of deviations that are prejudicial to one of the parties and thus fall under civil law such as The occurrence of delays caused by: Contractor negligence during implementation, Contractor achievements not paid by the Owner, negligence of the Planner Consultant, the state of the land is not by the drawing plan, continuous heavy rain that disrupts the work, Kurs strengthen sharply, land acquisition has not been completed by the Owner, the Contractor is not given the opportunity 50 days of completion; Disputes caused by: Owner made unilateral changes to Technical Specifications, Supervisory Consultant's mistake in reporting progress.
Implications of The Increase In The Government's Project Budget Ceiling For Construction Managerial In Small Qualified Contractors Elsanema, Oktri; Ophiyandri, Taufika; Hidayat, Benny
CIVED Vol. 11 No. 3 (2024): September 2024
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v11i3.642

Abstract

The government has issued LKPP regulation No. 11 of 2021 which states that small qualification contractors may handle projects up to 15 billion, which before this regulation came out small contractors could only handle projects with a maximum value of 2,5 billion. The government hopes positively for this restriction, because the gap between large and small construction companies is quite high. In order to compete for large project values, small contractors must be able to reorganize the four managerial stages of construction project implementation, namely Planning, Organizing, Actuating, and Controlling (POAC). For this reason, a study was conducted that aims to analyze the implications of increasing the budget ceiling of government projects on the construction managerial of small qualification contractors. This research uses a descriptive qualitative method by analyzing changes in construction project managerial at each stage of construction project managerial through an in-depth interview process directly with small contractors who handle construction projects worth 5 to 15 billion in fiscal years 2022 and 2023 in the Padang City government. The result of this research is that there are changes in the managerial constructors at the planning stage. At the planning stage the contractor organizes the implementation of the project so that the project can be completed within the agreed time, through the use of Man, Money, Material, Market, Machine, and Method (6M) resources. The resources that change during project implementation at the planning stage are human resources (man). With an increase in the project budget ceiling, small qualification contractors increase the number of team personnel, labor, and team competence in mastering certain competencies to support the implementation of construction projects. While the management of 5M (man, money, material, machine, and method) at the organizing, actuating, and controlling stages, small qualification contractors are able to adjust their construction managerial implementation when the project is still worth under 2,5 billion with a project whose value increases to 15 billion.
Study of Final Business Case Sensitivity Analysis in the Government and Business Entity Cooperation (KPBU) Project in the Drinking Water Sector Jasmin, Feby Wucika; Ophiyandri, Taufika; Hidayat, Benny
CIVED Vol. 11 No. 3 (2024): September 2024
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v11i3.654

Abstract

The purpose of this study is to analize sensitivity of the final business case in public private partnership (PPP) projects. The outcome of this study will provide an overview and limits on changes in the parameters forming the investment. Therefore, a sensitivity analysis was carried out to changes in price, initial cost and interest. The results of the study shows the three changes show that the most sensitive parameter is price changes. Meanwhile, due to the decrease in absorption volume at the offtaker in Jakarta, two efforts were made, namely by increasing the minimum tariff to Rp. 3,846, - or by increasing the concession period to 45 years, this project can be said to be investment worthy.
A Risk Analysis Affecting Project Implementation with Contract Values Below 80% of the Owner's Estimated Price Istijono, Bambang; Ophiyandri, Taufika; Gustia, Siti Rahmi
Jurnal Talenta Sipil Vol 8, No 1 (2025): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v8i1.781

Abstract

The number of bids is less than 80% of the HPS, meaning that the work offered will be carried out at a cost of less than 80% of the estimated cost of the person in charge of the work. In the 2020 period the average percentage of contract value with an offer value of < 80% HPS at Agency x tends to increase significantly by 80% compared to the 2019 period. If the HPS preparation is assumed to have been carried out in accordance with expertise and supported by accountable data. Therefore, the implementation of a contract with a bid value below 80% HPS has a greater possibility of risk in the field compared to a contract value with an offer value above 80% HPS. The method used in carrying out this research is the descriptive method, namely through direct interviews with the Commitment Making Officer (PPK) at agency x to obtain information about the purpose of this research, namely, knowing what risks arise, the causes of risks, and what anticipatory steps are taken. to reduce risk. From the results of data processing after being validated with sources, the risks that arise are: contract extension, contract termination, reduced construction age, disputes, and bad news from local media caused by the bid value which is considered unreasonable. Steps taken by the owner as the owner of the project to reduce risk are Terminating the contract for projects found to be deviant according to applicable regulations and tightening supervision to maintain the quality of work.
Kesiapan Penyedia Jasa Konstruksi Dalam Pelaksanaan K3 Selama Pandemi Covid-19 di Provinsi Sumatera Barat Maulani, Febiana; Hidayat, Benny; Ophiyandri, Taufika
Jurnal Rekayasa Sipil (JRS-Unand) Vol. 17 No. 3 (2021)
Publisher : Civil Engineering Departement, Andalas University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jrs.17.3.194-203.2021

Abstract

Wabah Corona ditetapkan sebagai pandemi global sehingga Indonesia juga menetapkan standar protokol termasuk pada bidang konstruksi dengan mengeluarkan INMEN Menteri PUPR No 2 tahun 2020 tentang Pelaksanaan Protokol Pencegahan Covid – 19 pada Proyek Konstruksi sebagai pedoman yang harus dilaksanakan oleh penyedia jasa dalam masa pelaksanaan konstruksi di lingkungan proyek. Maka, Kesiapan dari penyedia jasa dalam penerapkan pelaksanan K3 protokol Covid – 19 perlu diulas lebih jauh baik dari sisi kemampuan SDM untuk mengimplementasikan pelaksanan protokol tersebut, ataupun dari segi manajerial perusahan sendiri dalam menyediakan peralatan SOP Covid – 19 di lingkungan proyek. Metode penelitian yang digunakan adalah wawancara kepada penyedia jasa, dan observasi ke lingkungan proyek. Hasil penelitian ini menunjukkan kesiapan SDM dan personil K3 dilapangan dalam pelaksanaan protokol covid – 19 adalah 66.66% atau penilaian baik, sedangkan untuk kesiapan dalam peralatan SOP protokol covid – 19 dilapangan hanya 60% atau penilaian cukup, dan penilaian kesiapan pelaksanaan protokol Covid – 19 keseluruhan adalah 63.42%. Sehingga, hasil penelitian ini dapat menjadi dasar evaluasi dalam penerapan INMEN didalam proyek konstuksi kedepannya.