SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
Vol 5 (2021): STIMA 5.0 Kebangkitan Nasional Digital Era Industri 4.0

METODE PELAKSANAAN PEKERJAAN OVERBRIDGE BENTANG 30M

INDRA KRISNA SUKMA RAHAYU (Unknown)
YAYAT HENDRAYANA (Unknown)



Article Info

Publish Date
08 Aug 2021

Abstract

The method of implementing the Overbridge / bridge determines the stages that must be carried out in the Overbridge work, this study aims to analyze the work of making the Overbridge, especially in bored pile, pile cap, abutment, and girder work. The methodology used in this research is to directly see and observe Overbridge work, the Overbridge project location is located in Kertajati District, Cipali-Palimanan Toll Access to West Java International Airport, Majalengka, the concrete used is callas concrete B, F'c 20 90.130) with Slump value is 16 + - 2cm and for ironwork uses 32 mm main iron and 16 mm spiral. Then for the tools used are drilling machines, 45 ton capacity cranes, 6 m3 mixer truck, dum trucks and vibrators.

Copyrights © 2021






Journal Info

Abbrev

stima

Publisher

Subject

Computer Science & IT Control & Systems Engineering Industrial & Manufacturing Engineering Mechanical Engineering Transportation

Description

Prosiding SEMINAR TEKNOLOGI MAJALENGKA (STIMA) adalah publikasi ilmiah yang memuat hasil-hasil penelitian orisinal dan terkini dari para akademisi, peneliti, dan praktisi di berbagai bidang teknik dan manajemen. Prosiding ini memiliki sifat multidisiplin, berfokus pada integrasi ilmu pengetahuan ...