SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
Vol 5 (2021): STIMA 5.0 Kebangkitan Nasional Digital Era Industri 4.0

ANALISIS TIME SCHEDULE PADA PROYEK PEMBANGUNAN GEDUNG KANTOR KPU MAJALENGKA

Resy Usfuriya (Unknown)
EKA JULIAR (Unknown)



Article Info

Publish Date
08 Aug 2021

Abstract

In a project, the role of the time schedule is very important in the implementation of the project because it is necessary to manage the time for the project to be carried out in accordance with the targets to be achieved and as a guide in the implementation of the construction stages so that the project can be carried out properly without any obstacles. If in a project there is no time schedule, then the project cannot be managed properly and the results are not optimal or the implementation may exceed the project time limit. Therefore, the time schedule is a very important part of a project. Time schedule analysis is carried out using weekly data in the form of an S curve and a description of the implementation to determine problems that occur in the field and solutions to these problems.

Copyrights © 2021






Journal Info

Abbrev

stima

Publisher

Subject

Computer Science & IT Control & Systems Engineering Industrial & Manufacturing Engineering Mechanical Engineering Transportation

Description

Prosiding SEMINAR TEKNOLOGI MAJALENGKA (STIMA) adalah publikasi ilmiah yang memuat hasil-hasil penelitian orisinal dan terkini dari para akademisi, peneliti, dan praktisi di berbagai bidang teknik dan manajemen. Prosiding ini memiliki sifat multidisiplin, berfokus pada integrasi ilmu pengetahuan ...