Expansion joints play an important role in maintaining bridge performance by accommodating structural movements and preventing damage caused by traffic loads and environmental effects. This study aims to analyze the installation method of a strip seal expansion joint implemented in the Pegambiran Flyover Bridge Preservation Project, Cirebon City. A descriptive case study approach was employed using field observations, documentation, interviews, and project documents. The analysis focused on the installation sequence, including surface preparation, removal of the existing joint, installation of chemical anchors, retainer steel installation, rapid-setting grout casting, strip seal installation, and quality control. The results indicate that the installation method was carried out systematically in accordance with the project specifications. The application of D13 chemical anchors improved the structural connection between the expansion joint system and the existing bridge structure, while rapid-setting grout accelerated construction and enabled timely traffic reopening. In addition, the achieved zero-elevation condition enhanced driving comfort and minimized impact loads on the bridge deck. Overall, the implemented installation method provides an effective solution for bridge preservation projects requiring durable and efficient strip seal expansion joint systems.
Copyrights © 2026