The construction of the Gunungsari Public Health Center (Puskesmas) in Cirebon City represents the local government's effort to improve the quality and accessibility of public healthcare services through the development of safe and reliable facilities. The building utilizes a steel structural system for its columns and beams, requiring appropriate construction methods and quality control to ensure structural strength, stability, and safety. This study aimed to investigate the implementation methods and quality control procedures for steel structure works on column and beam elements during fabrication and field installation. Data were collected through direct field observations, reviews of technical documents, including shop drawings and technical specifications, and interviews with project contractors and supervisors. The collected data were analyzed descriptively to explain the construction process and quality control system. The results indicate that the steel structure work was carried out systematically, covering preparation, fabrication, anti-corrosion coating, material transportation, erection using a mobile crane, installation of high-strength bolted and welded connections, inspection, and finishing. The structural material used was BJ 37 steel, supported by SNI certification and mill certificates. Overall, the construction methods and quality control procedures were implemented according to the project plan, contributing to the reliability, quality, and safety of the completed building structure.
Copyrights © 2026