This Practical Work Report discusses the construction method of the weir’s right wing wall and the analysis of planned flood discharge at the Talaga Mini-Hydro Power Plant (PLTM) project with a capacity of 2x1 MW in Majalengka Regency, utilizing the Cilutung River flow. The objective is to understand the technical implementation of the weir wall construction and to calculate the safe flood wall height based on the planned flood discharge. Data collection methods included field observations, interviews, and secondary data analysis. The construction implementation stages covered preparation, earth excavation, and reinforced concrete structure works, including rebar fabrication, formwork installation, concreting using K-225 concrete, and curing. For hydrological analysis, flood discharge calculations were performed using various empirical methods, with the HSS Snyder method selected as the most suitable for the watershed area of 124.09 km². The analysis results indicate that the planned flood discharge for a 100-year return period (Q100) is 370 m³/s. Based on this calculation, the recommended weir flood wall height is set at elevation +490.50 masl, or 4.34 meters from the weir crest, to ensure operational safety against flood risks.
Copyrights © 2026