The installation of wastewater and Wastewater Treatment Plant (WTP) systems is essential in the construction of healthcare facilities because it ensures the safe collection, treatment, and disposal of liquid waste while preventing environmental pollution and protecting public health. This study aims to describe the implementation method of the wastewater and WTP systems, explain the stages of wastewater flow, and identify the maintenance procedures applied in the Gunungsari Community Health Center Building project. The practical work was conducted at the project located on Jl. Tentara Pelajar No. 75, Pekiringan Village, Kesambi District, Cirebon City. The building consists of three floors with a total height of approximately 12 meters and a floor area of 1,378.8 m². The implementation method includes project preparation, measurement and excavation, pipeline layout marking, installation of AW-type PVC pipes, system inspection and testing, and finishing work. The wastewater disposal system consists of drainage pipelines, inspection chambers, control tanks, septic tanks, WTP units, final discharge, and routine maintenance. The installation follows SNI 03-7065-2005 plumbing standards, including the use of 4-inch pipes with slopes of 2–3% for black water and 3-inch pipes with slopes of 1–2% for wastewater, ensuring efficient flow, reliable treatment, and sustainable sanitation performance.
Copyrights © 2026