Construction supervision and control are essential to ensuring project quality and schedule performance. This study aims to analyze the implementation of supervision and quality control in the substructure works of the Kios Bazar Building at the Kertajati Umroh Park Project and evaluate schedule performance using Earned Value Analysis (EVA). A mixed-methods approach was employed through field observations, project documentation, interviews, and analysis based on SNI 2847:2019, project specifications, and shop drawings. Schedule performance was assessed using Planned Value (PV), Earned Value (EV), Schedule Variance (SV), and Schedule Performance Index (SPI). The results indicate several supervision gaps, including the absence of a Supervision Consultant, Site Engineer, Quality Control (QC) personnel, and Safety Officer. Quality control deficiencies included the absence of slump tests, trial mixes, and a Bar Bending Schedule (BBS), reinforcement bars stored directly on the ground, and potential cold joints due to three-day site-mixed concrete casting. EVA analysis showed the lowest SPI value of 0.53 in Week 24, mainly caused by manual excavation, delayed labor mobilization, and late reinforcement delivery. Project acceleration increased the SPI to 1.00 in Week 33, indicating completion according to the final project schedule.
Copyrights © 2026