Practical Work is an academic activity designed to provide students with experience in applying theoretical knowledge to actual construction practices. This Practical Work was conducted at the Kataraja Toll Road Project, Infrastructure Division 1, Section 1, focusing on the implementation of segmental box girder casting at the Sedyatmo Junction Bridge. The construction employed the balance cantilever method supported by a formwork traveller, which enables segmental casting to be carried out progressively and symmetrically without using scaffolding beneath the bridge span. The objectives of this Practical Work were to understand the implementation stages of segmental box girder casting, the application of the balance cantilever method, and the use of the formwork traveller as the primary construction equipment. Data were collected through direct field observations, interviews, technical discussions with project personnel, documentation, and literature studies. The observed construction stages included traveller setting, reinforcement installation, tendon duct and anchorage installation, formwork installation, pre-casting inspection, cast-in-situ concrete placement, curing, tendon stressing, and traveller launching to the subsequent segment. The results indicate that the balance cantilever method using a formwork traveller supports systematic construction activities, maintains structural balance during casting, and contributes to geometric accuracy and construction quality.
Copyrights © 2026