A Framework for Climate Resilience of Micro-Hydro Power and Energy Security in the Upper Watersheds of Bogor Regency Run-of-river micro-hydro power plants (MHPP) depend directly on streamflow, whereas early site screening usually relies on mean discharge, which hides behavior in El Niño years. In Bogor Regency the electrification ratio had reached 99.99% (Q3 2024), so the value of upland MHPP lies in the reliability and independence of local supply rather than first-time access. This methodological concept article formulates a five-step framework to screen MHPP climate resilience with the monthly F.J. Mock water balance and maps its outputs to the 4A energy security dimensions (availability, accessibility, affordability, acceptability) and energy independence. The framework is supported by secondary data: regional planning documents (spatial plan, medium- and long-term development plans), the NOAA ENSO index for 2016–2026, and disaster records for Bogor Regency for 2019–2023. Drought incidents were recorded at 8 in 2022 and jumped to 643 in 2023, a year with a mean June–November ONI of +1.38 °C, supporting the use of El Niño years as a design basis. Three candidate sites (Nanggung, Cisarua, and Sukamakmur, crossed by the Cibeet River and proposed as a new MHPP site) are screened qualitatively. No quantitative site results are reported; hypotheses, indicators, and a calibration agenda with primary data are formulated for the thesis stage.
Copyrights © 2026