cover
Contact Name
Cucuk Nur Rosyidi
Contact Email
performa@ft.uns.ac.id
Phone
+62271-632110
Journal Mail Official
performa@ft.uns.ac.id
Editorial Address
Gedung I, Lantai 1 Fakultas Teknik UNS Jl. Ir. Sutami 36A, Surakarta, 57126 , Indonesia
Location
Kota surakarta,
Jawa tengah
INDONESIA
PERFORMA : Media Ilmiah Teknik Industri
ISSN : 14128624     EISSN : 26206412     DOI : https://doi.org/10.20961/performa
Core Subject : Engineering,
PERFORMA : Media Ilmiah Teknik Industri merupakan jurnal teknik industri yang menyajikan artikel orisinil pada bidang teknik dan manajemen industri. Tema naskah yang diterbitkan mencakup: Manufacturing System, Operation Research, Product Design and Development, Manufacturing Technology, Work Study, Ergonomic, Logistic System, Business System, Quality and Reliability Engineering, Information System and Knowledge Management, System Modelling, Small-medium Enterprise Optimization, Public Sector Optimization, and Industrial Engineering Education . Naskah yang dimuat dapat berupa hasil penelitian, analisis, kajian ilmiah, opini, dan makalah teknik.
Articles 10 Documents
Search results for , issue "Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014" : 10 Documents clear
Pengembangan Metode Pengukuran Usabilitas Surel Dengan Fuzzy AHP Menurut Dimensi ISO 9421 Part 11 Yustin Astri Andalia; Irwan Iftadi; Wachid Ahmad Jauhari
Performa: Media Ilmiah Teknik Industri Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (538.189 KB) | DOI: 10.20961/performa.13.1.12716

Abstract

Since 1980, there were many free emails launched. Slowly, people only choose some email providers. For known email providers have differences the number of user. For known email providers have differences the number of user. In recent years, user seems to use free email. It indicates that there are the most favourite email were choosed by user. This is because the email have more usable than others. The aim of this research is to propose usability characteristic of email and to get value from usability of email. This research methodology consist of five steps, such as: to clasify the atributtes to usability dimension, to determine criteria for usability atributes, to give value to use Fuzzy AHP, to normalize scale with OMAX, and to try measurement tool. This research result usability tools that have 3 dimensions, 24 attributes, and 11 criterias of email usability. Beside, it shows that effectivity dimension is the important dimension with wight 0,3996. Based on the resulting on try measurement tool kwon that the best email usability is Gmail with value 2,83.
Econometric Analysis With Panel Data: Measuring Relations And Contributions Of Influential Factors On Income Per Capita Across Districts In Sragen Regency Raditya Teguh Anugraha; I Wayan Suletra; Yusuf Priyandari
Performa: Media Ilmiah Teknik Industri Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (408.925 KB) | DOI: 10.20961/performa.13.1.12706

Abstract

Levels of prosperity of an area is measured by income per capita. Income per capita is derived from regional income divided by mid-year population number. In Srgaen Regency, income per capita amongdistricts very different significanly so a reaserch is needed to know the causes of this variability. In general, many factors affect the income per capita and each factor may have different effect in form of relationship and level of contribution. To solve these problems this reaserch used econometric which is the result of a certain outlook on the role of economics, consists of the application of mathematical statistics to economic data to lend empirical support to the models constructed by mathematical economics and to obtain numerical results. Panel data which is a combination of data type cross-section and times series is used in this study. To combine the indicators variables that have different units is used factor analysis. Regression model pooled least square (PLS), fixed effect, and random effect was tested to get the most representative models describing the relationship between income per capita and the factors that influence. From the analysis it shown that not all district have the same model. Thus the Government of Sragen Regency can treatment on different district based on the factors that influence and encourage these factors so that the income per capita is increasing.
Pengembangan Data Warehouse dan Aplikasi Investigasi Kecelakaan Kereta Api (Studi Kasus di PT. Kereta Api Indonesia Daerah Operasi IV) Budiawan, Wiwik; -, Sriyanto; Andika, Wahyu
Performa: Media Ilmiah Teknik Industri Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (751.998 KB) | DOI: 10.20961/performa.13.1.12718

Abstract

Investigation can be a complex task without any supporting system that provide a necessary data or a relevant information (Data Warehouse). Such as investigation of the PT Kereta Api Indonesia (KAI) in analyzing a train accident due to human error that occurs is limited. Analysis conducted by KAI only focuses on individuals who are related and have not been able to analyze in detail because of lack of data. Would require analysis of a train wreck with a systematic method integrated with data warehouse so that recommendations given on target. This study, initially conducted by interview data collection using the Critical Decision Method (CDM) and inferred using the Emergent Themes Analysis (ETA). Then used a systematic method of Human Factors Analysis Classification System Indonesian Railroad (HFACS-IR) to analyze human error especially train accidents that occurred in Indonesia. Later. Before the application is made investigations, required making accident scenarios by using Linking Causal Factor.
Usulan Perencanaan dan Pengendalian Persediaan Obat pada Gudang Farmasi Klinik XYZ dengan Menggunakan Metode EOQ Ringgo Ismoyo Buwono; Yusuf Priyandari; Wachid Ahmad Jauhari
Performa: Media Ilmiah Teknik Industri Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (512.543 KB) | DOI: 10.20961/performa.13.1.12708

Abstract

Klinik XYS is a company that provides health care services. This health care services include medical care and treatment services. In it’s function as a medical services provider, Klinik XYZ provides a pharmacy services. These services have an important role for the clinic because almost all of health services use pharmaceuticals. In the pharmaceutical activities, this company is still having some problem related to inventory management. From the initial observation,it is found that several types of drugs excess the stock which affect the expiration. Further, several types of drugs are out of stock which may result in reduction of patient services. Based on further observation the excess and the emptiness of drugs caused by company’s inability to control and plan the inventory. Therefore, this study proposes an EOQ method to plan and control the inventory in order to optimize the drug supply
Evaluasi Layout Departemen Produksi PT ABC Menggunakan Analisis Kuantitatif Untuk Meminimasi Ongkos Material Handling Fakhrina Fahma; Fatma Fitriana Sakinah
Performa: Media Ilmiah Teknik Industri Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (427.24 KB) | DOI: 10.20961/performa.13.1.12710

Abstract

PT ABC is a company enganged in the manufacture of drum oil, at first the company produces only one kind of drum namely non liquid leacker ( NLL).The high competition make pt abc add kind of product that is liquid leacker ( NLL) or drum with paint on the inside. So that companies must add some new machines resulting in the layout of a machine become commuting between from the building one into the building two. Research purposes this is designing layouts alternative to minimize cost material handling using methods quantitative analysis, that ' s using from to chart, outflow table, and priority scale table. After making the collection and processing data over distances total is 876,64 m. This distance longer 6.25 m compared with the layout of the beginning, namely 870,39 m. but the result of reckoning cost of materials handling produce a cost of RP 3.345.193,00 the cost is cheaper than the layout of the beginning, fund of RP 3.988.084,28
Perancangan Key Performance Indicators (KPI) Menggunakan Metode Balanced Scorecard di PT. Aston System Indonesia Febrinata -; Murman Budijanto; Irwan Iftadi
Performa: Media Ilmiah Teknik Industri Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (335.102 KB) | DOI: 10.20961/performa.13.1.12700

Abstract

High demand to the printer’s product also affecting the increase of companies that run in the printer sales and services. This makes the competition in the printer sales and services company getting higher. PT. Aston System Indonesia is one of the companies that run in the printer sales and services. In order to compete, companies are required to make improvements in all aspects. Therefore, it is necessary a performance measurement for measuring the performance of the company. This study used the Balanced Scorecard to develop Key Performance Indicators (KPI) as the reference performance measurement at PT. Aston System Indonesia. To determining KPIs are used the Pairwise Comparison method to weighted strategic objectives. The result of the research conducted 19 strategic objectives, 39 performance indicators and 10 KPIs.
Penilaian Resiko Musculoskeletal Disorders Pekerja Harian Lepas PDAM Tirta Lawu Karanganyar Fiko Erisa Fatq; Irwan Iftadi; Yuniaristanto -
Performa: Media Ilmiah Teknik Industri Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (772.61 KB) | DOI: 10.20961/performa.13.1.12712

Abstract

PDAM Tirta Lawu Karanganyar is a local company that handles the distribution of water inKaranganyar, Central Java. The company serves the whole society of the various groups. In the process of delivery service, it was found the existence of Manual Material Handling (MMH) in the installation of water distribution networks. There are some activities which relatively easy to do, but in time and high repetition. In the beginning of interview was found that 4 from 6 workers have back pain in the hips and waist after work, then the part of body will be mapped by Nordic Body Map as a tool to strengthen the notion of mapping. This study uses REBA as the most appropriate valuation method in proving the existence of Musculoskeletal Disorders (MSDs) in the workplace. The result is there are 5 work elements as a subject of ergonomics evaluation. REBA method was proved to show some activities on high risk for the operator health of non-permanent employees (PHL)
Analisis Akar Penyebab Defect dan Lolosnya Produk Defect Proses Pendempulan Big Bus di PT.XYZ Retno Wulan Damayanti; Ereika Ari Agassi
Performa: Media Ilmiah Teknik Industri Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (288.078 KB) | DOI: 10.20961/performa.13.1.12702

Abstract

PT.XYZ is a manufacturer of body bus which produce four type of bus that is big bus, medium bus, small bus, and mini bus. There is ten process to produce 1 unit big bus that is machine work, sub assembly, pra production, body assembly, metal finish, epoxy, putty, painting, trimming, and PDI (Pre Delivery Inspection). Based on the check sheet data summary from January to August of 2013, most major defect are in the putty process and based on the observation and interviews, there is product defects that pass inspection and entry process of painting. So, this study aims to identify the root cause of the defect and the escape of product defect from inspection. Root Cause Analysis method are used to identify the root cause of this problem. Using Root Cause Analysis method, RCA diagram showed that the root causes of defects are SOP that cannot be applied, the color of paint (epoxy) is less clear for inspection, poor lighting, lack of machinery, the wages of workers, and porous of fiber, while the root cause of the escape of product defect from inspection are SOP that cannot be applied, the color of paint (epoxy) is less clear for inspection, poor lighting, lack of machinery, the wages of workers, and lack of quality standards.
Penentuan Waktu Standar Pemasangan Sambungan Baru di PDAM Kabupaten Karanganyar Sofyan Arifin; Irwan Iftadi; Yuniaristanto -
Performa: Media Ilmiah Teknik Industri Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (334.185 KB) | DOI: 10.20961/performa.13.1.12714

Abstract

To meet the needs of clean water for the community Karanganyar then PDAM are trying to expand the water distribution network to customers. In the process of acceptance of new customers has been running smoothly, but the taps have not been able to determine the standard time for the new connections. Sub section in Karanganyar taps involved in the splicing process of which this new relationship Subscriptions Subdivision, Subdivision Planning Engineering, Sub-Division of Logistics and Engineering Subdivision House Connection The method used to calculate the standard time in this study is the method Stopwatch and Interview Study and the employee concerned about the daily job performance. Study stopwatch method used to measure the standard time and Subscriptions Relations Sub-Division and Sub-Division of Logistics, due to the work carried out is done only monotonous and not affected by the queue of applicants for new connections or constraints that occur in the field. While the second method is to interview employees concerned about job performance daily use on Sub Division of Engineering and Technical Planning House Connection. Because the process of their work in direct contact with the ground and changing conditions. The results of the study time required in subsection subscription relationship is 88,05 minutes, sub-section survey engineering planning division 52 minutes, and the division RAB is 60 minutes, subpart logistics takes 92.10 minutes and sub-section home connection is 60 minutes. But the process is carried out on different days, so the beginning of the registration process takes up to 4 days attached. But the implementation of the taps that during this run takes 1-2 weeks. Proposed improvements to the taps are made additional employees in the sub-section on the logistics and scheduling of sub-section design and engineering techniques so that the connection is more orderly process
Design of Elementary School’s Desk and Chair to Overcome Mismatch Between School Furniture and Students Nindya Laksita Larasati; Irwan Iftadi; Taufiq Rochman
Performa: Media Ilmiah Teknik Industri Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (377.797 KB) | DOI: 10.20961/performa.13.1.12704

Abstract

Children spend a large time on school furniture in the classroom. Many studies before evaluate the extent of a possible mismatch between school furniture and students. However, the observations in public elementary schools with 159 students in Surakarta, Indonesia, showed that there are school furniture mismatch between the students’ body size and their activity in the classroom. This study was carried out in order to overcome the mismatch and describes the development of a dynamic furniture designed to be appropriate for the sizes of students. The students’ anthropometry data were incorporated in the design process for the school furniture and the designs come in many various combinations to encourage production of ergonomically suitable classroom furniture.

Page 1 of 1 | Total Record : 10


Filter by Year

2014 2014


Filter By Issues
All Issue Vol 23, No 2 (2024): Performa: Media Ilmiah Teknik Industri Vol 23, No 1 (2024): Performa: Media Ilmiah Teknik Industri Vol 22, No 2 (2023): Performa: Media Ilmiah Teknik Industri Vol 22, No 1 (2023): Performa: Media Ilmiah Teknik Industri Vol 21, No 2 (2022): Performa: Media Ilmiah Teknik Industri Vol 21, No 1 (2022): Performa: Media Ilmiah Teknik Industri Vol 20, No 2 (2021): Performa: Media Ilmiah Teknik Industri Vol 20, No 1 (2021): Performa: Media Ilmiah Teknik Industri Vol 19, No 2 (2020): Performa: Media Ilmiah Teknik Industri Vol 19, No 1 (2020): Performa: Media Ilmiah Teknik Industri Vol 18, No 2 (2019): Performa: Media Ilmiah Teknik Industri Vol 18, No 1 (2019): Performa: Media Ilmiah Teknik Industri Vol 17, No 2 (2018): PERFORMA Vol. 17, No 2 September 2018 Vol 17, No 1 (2018): PERFORMA Vol. 17, No 1 Maret 2018 Vol 16, No 2 (2017): PERFORMA Vol. 16, No 2 September 2017 Vol 16, No 1 (2017): PERFORMA Vol. 16, No 1 Maret 2017 Vol 15, No 2 (2016): PERFORMA Vol. 15 No. 2, September 2016 Vol 15, No 1 (2016): PERFORMA Vol. 15 No. 1, Maret 2016 Vol 14, No 2 (2015): PERFORMA Vol. 14 No. 2, September 2015 Vol 14, No 1 (2015): PERFORMA Vol. 14 No 1, Maret 2015 Vol 13, No 2 (2014): PERFORMA Vol. 13 No. 2, September 2014 Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014 Vol 12, No 2 (2013): PERFORMA Vol. 12, No 2 September 2013 Vol 12, No 1 (2013): PERFORMA Vol. 12, No 1 Maret 2013 Vol 11, No 2 (2012): PERFORMA Vol. 11, No 2 September 2012 Vol 11, No 1 (2012): PERFORMA Vol. 11, No 1 Maret 2012 Vol 10, No 2 (2011): PERFORMA Vol. 10 No 2, September 2011 Vol 10, No 1 (2011): PERFORMA Vol. 10, No 1 Maret 2011 Vol 9, No 2 (2010): PERFORMA Vol. 9, No 2 September 2010 Vol 9, No 1 (2010): PERFORMA Vol. 9, No. 1 Maret 2010 Vol 8, No 2 (2009): PERFORMA Vol. 8, No. 2 September 2009 Vol 8, No 1 (2009): PERFORMA Vol. 8, No. 1 Maret 2009 Vol 7, No 2 (2008): PERFORMA Vol. 7, No. 2 September 2008 Vol 7, No 1 (2008): PERFORMA Vol. 7, No. 1 Maret 2008 Vol 6, No 2 (2007): PERFORMA Vol. 6, No. 2 September 2007 Vol 6, No 1 (2007): PERFORMA Vol. 6, No. 1 Maret 2007 Vol 5, No 2 (2006): PERFORMA Vol. 5 No 2, September 2006 Vol 5, No 1 (2006): PERFORMA Vol. 5, No. 1 Maret 2006 Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005 Vol 4, No 1 (2005): PERFORMA Vol. 4 No 1, Maret 2005 Vol 3, No 2 (2004): PERFORMA Vol. 3 No 2, September 2004 Vol 3, No 1 (2004): PERFORMA Vol. 3 No 1, Maret 2004 Vol 2, No 2 (2003): PERFORMA Vol. 2, No. 2 September 2003 Vol 2, No 1 (2003): PERFORMA Vol. 2, No. 1 Maret 2003 Vol 1, No 1 (2002): PERFORMA Vol. 01, No 1 Maret 2002 More Issue