cover
Contact Name
Cucuk Nur Rosyidi
Contact Email
performa@ft.uns.ac.id
Phone
+62271-632110
Journal Mail Official
performa@ft.uns.ac.id
Editorial Address
Gedung I, Lantai 1 Fakultas Teknik UNS Jl. Ir. Sutami 36A, Surakarta, 57126 , Indonesia
Location
Kota surakarta,
Jawa tengah
INDONESIA
PERFORMA : Media Ilmiah Teknik Industri
ISSN : 14128624     EISSN : 26206412     DOI : https://doi.org/10.20961/performa
Core Subject : Engineering,
PERFORMA : Media Ilmiah Teknik Industri merupakan jurnal teknik industri yang menyajikan artikel orisinil pada bidang teknik dan manajemen industri. Tema naskah yang diterbitkan mencakup: Manufacturing System, Operation Research, Product Design and Development, Manufacturing Technology, Work Study, Ergonomic, Logistic System, Business System, Quality and Reliability Engineering, Information System and Knowledge Management, System Modelling, Small-medium Enterprise Optimization, Public Sector Optimization, and Industrial Engineering Education . Naskah yang dimuat dapat berupa hasil penelitian, analisis, kajian ilmiah, opini, dan makalah teknik.
Articles 6 Documents
Search results for , issue "Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005" : 6 Documents clear
Analisis Manual Material Handling Berdasarkan Prinsip Biomekanika (Studi Kasus CV. Titian Mandiri) Puthut Supri Adi; Bambang Suhardi; Rahmaniyah Dwi Astuti
Performa: Media Ilmiah Teknik Industri Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (242.105 KB) | DOI: 10.20961/performa.4.2.11178

Abstract

CV. Titian Mandiri is a company that produce bottling water which still use manual lifting method. The advantages of this method are more flexible, effective and low cost. On the other hand, bad manual lifting can generate pain in several operator body segments, such as hand, back, waist and thigh.Leave from those reality, it is needed to do some working method analysis and improvement based on biomechanical principle. NIOSH method used to know lifting safety limit and Chaffin-Anderson equation used to predictable the force that happened on abdominal segment, L5/S1 and operators hand segment. This study shows that RWL value for lifting to pick up car is 8,223 kg and lifting to the box car is 6,208 kg. The LI value for lifting to pick up car is 2,311 and for lifting to box car is 3,060.The improvement of working method was done by rearrange the gallon position and add amount of table. The high of the table is 52 cm and the gallon position would be in front of operator sagital line exactly. This improvement changes RWL value for lifting to pick up become 13,820 kg and 11,475 kg for lifting to the box car. LI value for lifting to the pick up descend become 1,374 and LI value for lifting to the box car become 1,6557.
Minimasi Slack Time pada Penjadwalan Make To Order Job Shop Ali Parkhan; Hermawan Adi Tanjung
Performa: Media Ilmiah Teknik Industri Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (530.174 KB) | DOI: 10.20961/performa.4.2.11180

Abstract

In manufacturing Make to Order environment, order usually can be negotiated in order to satisfycustomer need while it remains considering resources availability. Scheduling is utilized in a company to get higher efficiencies in production, minimize makespan and meet due date. There are some decisions related in scheduling activity i.e. sequencing, routing and determining starting time and finishing time of jobs. This paper will present application of Integer Linear Programming (ILP) and Critical Path Method (CPM) in scheduling. The methods are employed to determine due date that minimize slack time. This study resulted an optimal sequencing and routing of the jobs.
Analisis Pengaruh Kebisisngan, Temperatur dan Pencahayaan Terhadap Produktivitas Kerja Pengeleman Amplop Secara Manual Brury Jatmiko; Bambang Suhardi; Rahmaniyah Dwi Astuti
Performa: Media Ilmiah Teknik Industri Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (139.528 KB) | DOI: 10.20961/performa.4.2.11182

Abstract

This research explores the analysis of the optimum setting for the noise (80dB, 77dB, 80dB), temperature (18°C, 24°C, 34°C) and illumination (155lux, 200lux, 300lux) to optimize manually envelope folding jobs productivity. The analysis that will be implemented here is design experiments factorial method to determine the significant factors that influence manually envelope folding jobs productivity. Also, the response surface method will be applied to obtain the approximation model for manually envelope folding jobs productivity as a function of the factor found earlier so that the most optimum result can be obtained under a design optimization method.
Penentuan Jumlah, Lokasi dan Cakupan Distribusi Gudang Produk Air Minum Dalam Kemasan Jenis Gelas (Studi Kasus di PT. Dzakiya Tirta Utama) Dyan Parardyo S; Yuniaristanto -; Bambang Suhardi
Performa: Media Ilmiah Teknik Industri Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20961/performa.4.2.11172

Abstract

This paper studies a facility location with single sourcing problem which simultaneously considering opening some new facilities or closing some existing facilities. This problem comes from the inefficiency of the distribution network because of its distribution process growth. One of the mainly caused is each customer zone, which consist of several demand points, served by more than one warehouses. This policy causes high delivery cost and also makes what called marketing conflict. The objectives of this problem solving is determining number, location and distribution coverage of warehouse that could minimizing total logistic cost. Total logistic cost consist of delivery cost from warehouse to customer zone, storage and operation cost at warehouse and transportation cost from plant to warehouse. The best solution is achieved using heuristic approach and optimized using integer linear programming by examining the best configuration network offering the least total logistic cost.
Perancangan Sistem Pengukuran Kinerja Pada Perguruan Tinggi Swasta XYZ Dengan Metode Balanced Scorecard Wahyudi Sutopo; Eko Liquiddanu; Endah Sulistyowati
Performa: Media Ilmiah Teknik Industri Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (245.332 KB) | DOI: 10.20961/performa.4.2.11174

Abstract

To face globalization era that led to a more competitive, a higher education institution need to set up a strategic management system in order to develop its organization performance to survive and winning the competition. To set up strategic management, the institution must exactly recognize the performance level of it’s organization. That’s why the performance measurement system to help the organization enhance its performance is needed.XYZ college as a higher institution, wants to improve it’s performance by developing a management system to evaluate the current implemented strategy. The balanced scorecard approach as one of performance measurement method by integrating financial and non financial measures is used to design the the performance measurement system in this research. The balanced scorecard design of XYZ college constructed by considering the model from BAN, Competitive Funding Scheme, and the result from other researches. To accommodate the vision, mision, and objective of the XYZ institusion, this research involved thirthteen respondent who are executives management that consist of: Director; director assistant, and department chairmans. After the performance measurement system designed using balanced scorecard method, the weight of each perspectives, objective criterias, and performance indicators then calculated using AHP method. Next, performance level of institusion represented by 1-10 scale based on OMAX. This research present the XYZ College performance measurement result of 2004 and proposes strategic suggestion to enhance the institution performance.
Perencanaan Produksi Menggunakan Kombinasi Model Integer Linear Programming Dan Model Simulasi (Studi kasus PT. Multi Strada Arahsarana) Pambudi Seno Raharjo; Azizah Aisyati; Muh. Hisyam
Performa: Media Ilmiah Teknik Industri Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (192.731 KB) | DOI: 10.20961/performa.4.2.11176

Abstract

Production planning is a process to determine number of production in a particular period to fulfill consumers orders according to the available production capacity. Production planning by combining Integer Linear Programming (ILP) and simulation is done in iterative way. ILP has an objective function to minimize cost, which has a number of methods, such as reguler production capacity, overtime production capacity and inventory constrain, for each type of tyres for monthly during constraints in three month (January – March 2004). Simulation model representes stochastic events on the production floor, so that actual production capacity is obtained. On each iteration, number of production was compared with the available capacity from the result of simulation model. If the simulated number of production is more than or equal to the available capacity, the iteration need an adjustment capacity. And then, if the simulated number of production is less than the available capacity, the iteration is stopped, so that the number of production proper with the actual capacity is obtained.

Page 1 of 1 | Total Record : 6


Filter by Year

2005 2005


Filter By Issues
All Issue Vol 23, No 2 (2024): Performa: Media Ilmiah Teknik Industri Vol 23, No 1 (2024): Performa: Media Ilmiah Teknik Industri Vol 22, No 2 (2023): Performa: Media Ilmiah Teknik Industri Vol 22, No 1 (2023): Performa: Media Ilmiah Teknik Industri Vol 21, No 2 (2022): Performa: Media Ilmiah Teknik Industri Vol 21, No 1 (2022): Performa: Media Ilmiah Teknik Industri Vol 20, No 2 (2021): Performa: Media Ilmiah Teknik Industri Vol 20, No 1 (2021): Performa: Media Ilmiah Teknik Industri Vol 19, No 2 (2020): Performa: Media Ilmiah Teknik Industri Vol 19, No 1 (2020): Performa: Media Ilmiah Teknik Industri Vol 18, No 2 (2019): Performa: Media Ilmiah Teknik Industri Vol 18, No 1 (2019): Performa: Media Ilmiah Teknik Industri Vol 17, No 2 (2018): PERFORMA Vol. 17, No 2 September 2018 Vol 17, No 1 (2018): PERFORMA Vol. 17, No 1 Maret 2018 Vol 16, No 2 (2017): PERFORMA Vol. 16, No 2 September 2017 Vol 16, No 1 (2017): PERFORMA Vol. 16, No 1 Maret 2017 Vol 15, No 2 (2016): PERFORMA Vol. 15 No. 2, September 2016 Vol 15, No 1 (2016): PERFORMA Vol. 15 No. 1, Maret 2016 Vol 14, No 2 (2015): PERFORMA Vol. 14 No. 2, September 2015 Vol 14, No 1 (2015): PERFORMA Vol. 14 No 1, Maret 2015 Vol 13, No 2 (2014): PERFORMA Vol. 13 No. 2, September 2014 Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014 Vol 12, No 2 (2013): PERFORMA Vol. 12, No 2 September 2013 Vol 12, No 1 (2013): PERFORMA Vol. 12, No 1 Maret 2013 Vol 11, No 2 (2012): PERFORMA Vol. 11, No 2 September 2012 Vol 11, No 1 (2012): PERFORMA Vol. 11, No 1 Maret 2012 Vol 10, No 2 (2011): PERFORMA Vol. 10 No 2, September 2011 Vol 10, No 1 (2011): PERFORMA Vol. 10, No 1 Maret 2011 Vol 9, No 2 (2010): PERFORMA Vol. 9, No 2 September 2010 Vol 9, No 1 (2010): PERFORMA Vol. 9, No. 1 Maret 2010 Vol 8, No 2 (2009): PERFORMA Vol. 8, No. 2 September 2009 Vol 8, No 1 (2009): PERFORMA Vol. 8, No. 1 Maret 2009 Vol 7, No 2 (2008): PERFORMA Vol. 7, No. 2 September 2008 Vol 7, No 1 (2008): PERFORMA Vol. 7, No. 1 Maret 2008 Vol 6, No 2 (2007): PERFORMA Vol. 6, No. 2 September 2007 Vol 6, No 1 (2007): PERFORMA Vol. 6, No. 1 Maret 2007 Vol 5, No 2 (2006): PERFORMA Vol. 5 No 2, September 2006 Vol 5, No 1 (2006): PERFORMA Vol. 5, No. 1 Maret 2006 Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005 Vol 4, No 1 (2005): PERFORMA Vol. 4 No 1, Maret 2005 Vol 3, No 2 (2004): PERFORMA Vol. 3 No 2, September 2004 Vol 3, No 1 (2004): PERFORMA Vol. 3 No 1, Maret 2004 Vol 2, No 2 (2003): PERFORMA Vol. 2, No. 2 September 2003 Vol 2, No 1 (2003): PERFORMA Vol. 2, No. 1 Maret 2003 Vol 1, No 1 (2002): PERFORMA Vol. 01, No 1 Maret 2002 More Issue