cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
IJTI (International Journal Of Transportation And Infrastructure)
ISSN : 25974734     EISSN : 25974769     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 7 Documents
Search results for , issue "Vol 3 No 1 (2019): September 2019" : 7 Documents clear
Comparison of Building Structure Planning with SNI 2847-2013 Method and SAP2000 V.19 Software Code ACI 318-14 Ada Bina Avizan; Koespiadi Koespiadi
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 3 No 1 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (582.811 KB) | DOI: 10.29138/ijti.v3i1.1050

Abstract

Building construction planning in Indonesia uses SNI 2847: 2013 regulatory guidelines especially in building planning. So we need a combination of standardization used with technological developments that are realized in a computer program to simplify and speed up calculations. The results of the calculation of beam structures and concrete columns in the final project calculations using SNI 2847: 2013 regulations and analysis using SAP2000 code ACI318-14 software obtained the results: a) In plimelinary beam designs with sizes B1 30/40 cm and B2 40/55 cm are not able hold the load on the structure (over strange), then the beam dimensions are enlarged to B1 30/60 cm and B2 40 / 60cm. In the SAP2000 output analysis results after the beam dimensions are enlarged there are no over strange frames and meet the strength of the structure. b) From the beam analysis planning on bending reinforcement using SNI 03-2847-2013 concrete reinforcement regulations and using SAP2000 code ACI318-14 software analysis, the number of reinforcement obtained is more using SNI 03-2847-2013 concrete reinforcement regulations compared to using software analysis SAP2000 code ACI318-14 the amount of reinforcement used has a difference of 0.17%. c). From the planning of column analysis on bending reinforcement using SNI 03-2847-2013 concrete reinforcement regulations and using SAP2000 code ACI318-14 software analysis, the same amount of reinforcement is obtained between calculations using SNI 03-2847-2013 concrete reinforcement regulations and using SAP2000 code ACI318 software analysis -14.
Technical Evaluation and Boezem Bratang Operation Patterns In Surabaya Akhmad Lutfis Salamin
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 3 No 1 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1047.038 KB) | DOI: 10.29138/ijti.v3i1.1051

Abstract

Surabaya is the second largest and most populous city in Indonesia and is inseparable from the problem of flooding which is still flooded the area of East Surabaya.Flooding is caused by Bratang boezem unable to accommodate rainwater discharge. Boeang Surabaya has an area of 19,900 m2, has two systems namely flood gates and flood pumps. The floodgate system will work to drain the boezem bratang water to wonokromo river if the water elevation at Wonokromo River is at under the elevation of Bratang boezem water and flow Gravitatively while the pump system will work if the floodgate system is no longer functioning. To overcome the problem of flooding in the region, it is necessary to conduct hydrological and hydraulics analysis by performing boezem routing to determine the Boezem capacity whether it can accept the planned rain discharge. a depth of 3 m is unable to accommodate a maximum flood discharge period of 2.5 and 10 years. so it is planned to increase the boezem depth which was originally 3 m to 4.6 m, and increase the pump capacity which was originally from 10.5 m3 / s to 14 m3 / s.From the plan, after the hydrologic and hydraulics analysis using Boezem routing, Boezem has been able to accommodate the planned rain discharge.
Case Study of Delay Construction Projects in Bidau Dili Timor-Leste Bridge Eliseu Soares Parerira Amaral
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 3 No 1 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (598.469 KB) | DOI: 10.29138/ijti.v3i1.1052

Abstract

The process of implementing development projects has many obstacles that were not predicted beforehand resulting in delays in project completion which have an impact on increasing the cost of project implementation. sometimes the project is not completed in accordance with a predetermined schedule that may be caused by certain factors. Various ways can be done to anticipate and be a solution to the delay. The purpose of the study is to analyze the factors that influence delays in bridge construction projects in Bidau Timor - Leste and how to anticipate delays in project work. The research method used is descriptive method by observation and direct interviews. So that there are several dominant factors that influence the delay of the Bidau Timor-Leste bridge construction project, including the types of weather, material and financial. To anticipate delays in construction projects, it is necessary to do a work contract in accordance with the contract law in which all matters are regulated, so that the anticipation, mitigation and accountability are clear. Identification of the application of overcoming delays in the Bidau Timor-Leste bridge construction project if viewed from the side of the existing contract there are still shortcomings, so it needs to be improved in terms of working contract documents and refer to the contract law.
Projection of Water Utilities for Customers in East Timor-Leste in Dili for Sustanaible Development Goals (SDGs) 2030 Geazi Isai Reis dos Santos; F Roslan Edy Santosa
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 3 No 1 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (885.908 KB) | DOI: 10.29138/ijti.v3i1.1053

Abstract

Water in human life has a very vital function. The daily activities of humans never escape from water. Starting from bathing, washing, cooking up to the elements of human body One is also composed of water. To obtain the projected results of population growth for the next 10 years, the calculation of water discharge in Dili City. Population projections with geometric methods use the assumption that the number of people will increase geometric. The rate of growth is considered the same for each year. Of the increase of population in the year 2017 population growth in Dili by 12.8% with a population of 234,062, used as a reference for the projected population for the next 10 years (2017-2027). Based on the increase of population used is 12.8% and the population is 10 years (2018-2027) for 2.395.75 inhabitants. The balance of clean water needs in urban clean water services.
Analysis of the Impact of Pedestrian Revitalization in the City of Jombang Towards Pedestrian Convenience Gredian Galu Sukma; Sri Wiwoho Mudjanarko
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 3 No 1 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (591.639 KB) | DOI: 10.29138/ijti.v3i1.1054

Abstract

Jalan Basuki Rahmad is one of the streets with a fairly active pedestrian routine because it is donated by a shopping area which is the center of the crowd and the lane near Jombang Station. However, the situation in the area is still lacking in good management, especially in the existing pedestrian facilities that look chaotic and unorganized. Rahmat Basuki Street is one of the streets in the center of the city so it needs to be arranged in order to create comfort for pedestrian users. One of the government's policies by rebuilding the pedestrian path is to revitalize. This research intends to discuss the effect of walkability and completeness of the road on pedestrian comfort on the pedestrian path on the Basuki Rahmad road in Jombang after being revitalized. The purpose of this study was to analyze the impact of revalitation in pedestrian structuring on the Basuki Rahmad Jombang road from the influence of walkability and completeness of the road to the pedestrian comfort on the Basuki Rahmad road in Jombang city. The method used is descriptive analysis and regression analysis. The results of the study showed that walkability and completeness of the road affected pedestrian comfort by 0.639 or 63.9% and 0.188 or by 18.8%.
Refinement Method of Retaining Wall (L-Shape Concrete) and CCSP Design in Kalimas Quayside Kademeter 1200-1400 Project Margantionius Margantionius; Ronny Durrotun Nasihien
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 3 No 1 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (443.626 KB) | DOI: 10.29138/ijti.v3i1.1055

Abstract

As one of the state-owned enterprises (BUMN), PT Pelabuhan Indonesia III (Persero) Regional Jawa Timur has demanded to obtain the considerable revenues using the limited maintenance funds for port facilities. One of the roles of Engineering Division includes the availability of port facilities that support operation division, so it is necessary to check and maintain the facilities. In consequence, the estimated cost and time of project carried out effectively to mitigate the risk level in the future in order to achieve the main objectives. One of the biggest revenues in the port sector is on the quayside facility services, therefore, maintenance of these facilities needs to be prioritized. The final project provides an analysis of cost and time calculations using the method of repairing the retaining wall (L-Shape Concrete) and the CCSP (Coruggated Concrete Sheet Pile) method for repairing damage to Kalimas Kademeter Quayside 1200-1400 with damage length of 176 meters and width of 9 meters. Based on the observation of cost and time analysis, the estimated cost of using the L-Shape Concrete repair method is much cheaper than using the CCSP (Coruggated Concrete Sheet Pile) method, but the actual project period is much longer. Finally, the selection of repair methods can adjust to the necessity of cost and time aspects, as well as the methods of project.
Redesign of Core Groyne Using Natural Materials Maulida Amalia Rizki
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 3 No 1 (2019): September 2019
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (770.238 KB) | DOI: 10.29138/ijti.v3i1.1056

Abstract

Coastal abrasion is one of the serious problems with shoreline change. In addition to natural processes, such as wind, currents and waves. One method for overcoming coastal abrasion is the use of coastal protective structures, where the structure functions as a wave energy damper at a particular location. Coastal buildings are used to protect the beach against damage due to wave and current attacks. Groyne is a coastal safety structure that is built protrudes relatively perpendicular to the direction of the coast, the importance of built coastal security with a groyne structure on the Jetis beach is as a flood control infrastructure that is as a final disposal of floods in the Ijo Watershed system, addressing coastal abrasion in detail. So we get the design drawings of sediment control buildings to reduce sedimentation / siltation from the direction of the sea into the river mouth, material structure costs and time schedule.

Page 1 of 1 | Total Record : 7