cover
Contact Name
Yulingga Nanda Hanief
Contact Email
yulingganandahanief@gmail.com
Phone
-
Journal Mail Official
winy2010@gmail.com
Editorial Address
-
Location
Kab. jombang,
Jawa timur
INDONESIA
Inscientech: Journal of Industrial, Science and Technology
ISSN : 25983113     EISSN : -     DOI : -
Inscientech: Journal of Industrial, Science and Technology is a peer-reviewed open access journal , covering all aspects of industrial engineering. Inscientech: Journal of Industrial, Science and Technology published by Universitas KH. A. Wahab Hasbullah. Therefore the journal is both free to read and free to publish in. published twice in a year, May and October.
Arjuna Subject : -
Articles 12 Documents
Implementation of Business Process Re-engineering Concept For Improving Profit Malika, Ika; Wahyani, Widhy
Inscientech: Journal of Industrial, Science and Technology Vol 1 No 1 (2017): Inscientech: Journal of Industrial, Science and Technology
Publisher : Universitas KH. A. Wahab Hasbullah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

National sugar production in the new millennium only reached 2.3 million tons per year, while the national sugar consumption reached 4.5 million tons per year. For that reason, so the government should encourage sugar mills to diversify the products immediately. In producing sugar also generates solid waste such as blothong (: Javanesse). This study discusses the implementation of the concept of Business Process Re-engineering (BPR). BPR concept is used to design the sugar mill Business management in order to optimize it’s resources, so it is marketable. Under researcher observation, Lestari sugar mill, do not optimize in using of waste as a second output of sugar production yet. Solid waste utilization as briquette also helps the government in developing new renewable energy that can be optimized. As known Lestari sugar mill has not been used solid waste optimally and this research recommend for designing new business management, which reprocess blothong waste to be used as briquettes in order to increase profit. An outcome from the business management can increase profit as much as Rp 135.615.420.000,00 with the amount of total production cost as much as Rp 95.130.356.000,00 and having profit / gross loss from the Business as much as Rp 40.485.064.000,00. The proposal of the design of the business management gained more profit as pointed Rp 156.797. 670.000,00 which is included briquettes Solid waste revenue. So, the total amount of new business management cost is Rp 95.718.455.000,00 and gaining profit/gross loss as much as Rp 61.079.115.000,00. That achievement was increase as much as 22% from the previous business management. Keywords: Business Process Re-engineering, sugar mill, renewable energy, innovation, production, briquettes, solid waste (blothong), profit.
STUDY OF FACTORS CAUSING DELAY OF COMPLETION OF CONSTRUCTION WORK BUILDING IN AIRLANGGA UNIVERSITY SURABAYA Bhanthara, Rangga; Mudjanarko, Sri Wiwoho; Moetriono, Hary
Inscientech: Journal of Industrial, Science and Technology Vol 1 No 1 (2017): Inscientech: Journal of Industrial, Science and Technology
Publisher : Universitas KH. A. Wahab Hasbullah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Delay in a construction project is a situation where a project cannot be carried out or completed on time in accordance with the planned time. This study aims to (1) knowing the factors that are causing delays in the building project at the Airlangga University in Surabaya; and (2) knowing the rank factors that are causing delays in the work on the building project at the Airlangga University. Data collected by the questionnaire survey and interview which were distributed to the respondents that experienced individuals as the executor of the project of construction of the building at Airlangga University in Surabaya or the case study projects and has held positions as leaders of the activities, the project manager or field manager, consultant supervisor or consultant construction management. Data were analyzed using methods of factor analysis and multiple linear regression analysis with SPSS for data processing. After doing regression analysis with stepwise method obtained equation Y = -3.973 + 0.489 + 0.240 X8 X7 X5 + 0.428 + 0.314 + 0.200 X1 X2 X3 + 0.185 + 0.164 + 0.102 X4 X6, it is known that (1) the labour factor (X1), design (X2), the method of implementation (X3), a substance / material (X4), finance (X5), equipment (X6), work environment (X7), and managerial (X8) affect the delay of construction work on the building Airlangga University Surabaya. (2) after multiple linear regression analysis obtained rank the(rank) the factors most dominant influence on the delay time of execution, respectively, are the factors of managerial (X8), work environment (X7), design (X2), finance (X5), labor (X1), a substance / material (X4), the method of implementation (X3), and equipment (X6). Keywords: delay factor, ranking, the method of factor analysis, multiple linear regression