cover
Contact Name
Supriyadi
Contact Email
jurnalindustriunsera@gmail.com
Phone
-
Journal Mail Official
jurnalindustriunsera@gmail.com
Editorial Address
-
Location
Kota serang,
Banten
INDONESIA
Jurnal INTECH Teknik Industri Universitas Serang Raya
ISSN : 2407781X     EISSN : 26552655     DOI : -
Jurnal INTECH Teknik Industri Universitas Serang Raya, dengan nomor terdaftar ISSN 2407-781X (Print) dan 2655-2655 (online) adalah jurnal ilmiah yang diterbitkan oleh Program Sudi Teknik Industri, Fakultas Teknik, Universitas Serang Raya. Jurnal ini bertujuan untuk mempublikasikan hasil penelitian di bidang Teknik Industri yang diterbitkan dua kali setahun. Ruang lingkup Ilmu mencakup Riset Operasi, Sistem Manufaktur, Manajemen Industri, Ergonomi dan Sistem Kerja, Logistik dan Manajemen Rantai Pasokan, dan studi ilmiah lainnya sesuai dengan bidang lingkup penelitian Teknik Industri.
Arjuna Subject : -
Articles 6 Documents
Search results for , issue " Vol 3, No 1 (2017)" : 6 Documents clear
Penentuan Lot Sizing Persediaan Bahan Baku Baja Tulangan Rini, Endah Setyo; Kusumawati, Aulia; Kusmasari, Wyke
Jurnal INTECH Teknik Industri Universitas Serang Raya Vol 3, No 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30656/intech.v3i1.873

Abstract

This development poses a challenge to fulfill it by increasing the ability to provide or produce it. These conditions require companies to try to make their products available according to consumer needs. So the company should impose a system of Safety Stock, and ROP (Re-Order Point) or a message back point to ensure the availability of raw materials and the way of production. But sometimes the company doesnt pay attention to the lot size inventory efficiency issue. As a result, manufacturing companies tend to make large purchases without regard to the costs incurred. The purpose of this study is to identify safety stock, inventory costs, lot size, and reorder point for raw materials to then plan the billet raw material inventory. The data in the company has varying characteristics of the demand level so that the data is processed by the Lot Sizing Silver Meal method, the Economic Order Quantity and the Period Order Quantity. From the results of research and analysis, it is known that the safety stock of billet Q275 / 5SP raw materials is 1,046.68 tons and Re-order Points are 11758.04 tons. And from the three optimal lot sizing methods chosen, the Period Order Quantity method with the total cost of ordering raw materials per year is IDR 340,800.00 as much as four orders. Then inventory planning is carried out which results in a complete inventory cost of Rp 2,815,219,200 or resulting in cost efficiency of 17% compared to company policy which is Rp 3,407,764,327
Perbaikan Waktu Set Up dengan Metode Single Minute Excange of Dies pada Mesin Die Casting Ariyanto, Muchamad Septi; Ramayanti, Gina; Sahrupi, Sahrupi
Jurnal INTECH Teknik Industri Universitas Serang Raya Vol 3, No 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30656/intech.v3i1.874

Abstract

The time needed to set up the production machine is 55 minutes. The high set-up time is caused by the non-differentiation of internal set-up and external set-up so that all set-up activities are carried out when the engine stops (internal set up). When viewed from the effectiveness of the company, the setup activities carried out at the time of the engine stop will significantly harm the company, which in turn will have an impact on the high bottleneck which results in delays in the production process in specific capacities. Research activities are carried out by direct measurement of die casting machines using a stopwatch. In this study, the authors conducted a study to apply the SMED method when setting up die casting machines at PT Mitsuba Indonesia. The SMED (Single Minute of Exchange Die) method as an approach is considered as one of the solutions used to reduce the setup time of the machine. From the results of the study, it was found that the set-up time was 35 minutes, or efficient by 64% on the set-up time before the repair.
Analisis Pengendalian Kualitas Produk dengan Menggunakan Metode Six Sigma di Lini Electrolytic Cleaning Line (ECL) Bahari, Alfin; Shofa, M. Jihan
Jurnal INTECH Teknik Industri Universitas Serang Raya Vol 3, No 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30656/intech.v3i1.875

Abstract

A company engaged in steel, in its production activities still experienced the highest quality loss with disability in the line of Electrolytic Cleaning Line (ECL) with a percentage of disability of 16%, quality that meets company standards of 80%. The purpose of this study is to determine the baseline performance, identify the causes of disability and propose corrective action plans. This study uses the Six Sigma method that goes through the stages of analysis, namely Define, Measure, Analyze, Improve. The results of data processing, it can be seen that the process DPMO value in the Electrolytic Cleaning Line (ECL) line is 53,827,270 with a sigma level value of 3.11. From the identification of dominant CTQ, it can be seen that the CTQ that often occurs is a type of Soft Eyes. Therefore, for now, Soft Eyes is a priority for improvement. Based on the analysis of the causes of Soft Eyes using Failure Mode And Analysis (FMEA) obtained from the description of the process produces the highest Risk Priority Number (RPN) that is in human factors of 504. Since human factors are the primary cause, the company supervises the operator when doing work, to prevent unwanted defects in the product.
Identifikasi Penilaian Risiko Kecelakaan Kerja dengan Metode Hazard Identification Risk Assessment and Risk Control (HIRARC) Damayanti, Dini; Nalhadi, Ahmad
Jurnal INTECH Teknik Industri Universitas Serang Raya Vol 3, No 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30656/intech.v3i1.871

Abstract

In construction activities do not escape from operations on iron, in iron activities cannot be separated from work accidents that often occur. As with work accidents that occur in reinforcing iron manufacturing activities, it is necessary to make further identification to determine the potential for workplace accidents that have not been identified before. Therefore, researchers are interested in identifying further the potential for whatever might occur in reinforcing iron activities at PT Adhi Karya, using the Hazard Identification Risk Assessment and Risk Control (HIRARC) method. HIRARC is a method used to identify, then provide a hazard assessment and control potential workplace accidents in work activities that are being carried out. This research is qualitative research. The purpose of this study was to find out the dominant factors of work accidents in reinforcing iron activities in the Pakupatan-Palima road construction project and to find out the appropriate control proposals to reduce the risk of occupational hazards and provide proper controls to reduce the risk of occupational hazards. In this study, researchers used the HIRARC method. The technique used in data collection is field observation, and interviews. Data analysis begins with calculating the risk value with a score. Based on the results of the study, it is known that there are six types of jobs obtained by the percentage of 30.8% for potential low, 61.5% for likely medium and 7.7% for likely high. To find the root causes and dominant factors of work accidents, researchers using the Root Cause Analysis (RCA) method found that the dominant elements of work accidents in manufacturing activities were factors in human habits that did not use PPE.
Analisis Pengendalian Kualitas Produk Sinter Ore dengan Metode Failure Mode And Effect Analysis (FMEA Cahyono, Dwi; Sahrupi, Sahrupi; Nalhadi, Ahmad
Jurnal INTECH Teknik Industri Universitas Serang Raya Vol 3, No 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30656/intech.v3i1.876

Abstract

The problem that occurs in the production of sintered ore is the number of defective products. In this study it was conducted with the aim of knowing the factors that cause the product to become broken, understanding the processes that most often appear following the elements and providing proposed improvements to improve product quality and reduce them using the method of failure mode and effect analysis and seven tools. Based on the results of the highest Risk Priority Number (RPN) is the proportioning process with a score (252), Sintering with a score (168), Drum Mixing 2 with a score of 126, drum mixing 1 with a dozen (90), sintered cooling with a rating (45), and a sinter crusher with a score (18). The priority for repairs is the proportioning process.
Analisis Kualitas Pelayanan Pengelolaan Pasar Tradisional Terhadap Kepuasan Pedagang dengan Metode Servqual dan IPA Malik, Vitrawan; Yulistyari, Eka Indah
Jurnal INTECH Teknik Industri Universitas Serang Raya Vol 3, No 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30656/intech.v3i1.872

Abstract

Traditional markets are places where sellers and buyers meet and are marked by the presence of direct buyer-seller transactions; buildings usually consist of kiosks or outlets, booths, and open bases opened by the seller or a market manager. Merchant satisfaction will be influenced by indicators such as cleanliness, comfort, security, and the availability of adequate traditional market facilities and infrastructure such as access to markets. The purpose of this study is to determine the value of Service Quality (SERVQUAL) and improvement efforts with Importance-Performance Analysis (IPA). The study was conducted by conducting surveys and interviews with traders in Pasar Baru, Cilegon, on legal traders, as many as 2,438 active traders, by drawing a sample of 96 respondents or traders using the Slovin formula. Then the data is collected where the information is processed using the Servqual Method (SERVQUAL) and find out the efforts to improve the quality of service by using Importance-Performance Analysis (IPA). The total value of servqual ((TSQ) ⃐) obtained at -4.90 shows that the variety of traditional market management services has not been entirely satisfactory for the new market traders of Cilegon City because the TSQ value is negative.

Page 1 of 1 | Total Record : 6