cover
Contact Name
Ayu Chandra
Contact Email
ayu.chandra21@gmail.com
Phone
+6285797094724
Journal Mail Official
sentikuin@unitri.ac.id
Editorial Address
Fakultas Teknik, Universitas Tribhuwana Tunggadewi Malang Jl. Telaga Warna Blok C, Tlogomas, Malang 65144, Jawa Timur
Location
Kota malang,
Jawa timur
INDONESIA
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur)
ISSN : 26222744     EISSN : 26229730     DOI : -
Proceeding Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur is a scientific conference proceeding that publishes articles in the field of Chemical Engineering, Civil Engineering, Industrial Technology, Environment and Infrastructure.
Articles 234 Documents
Search results for , issue " " : 234 Documents clear
Perbandingan Upah Tenaga Kerja Antara Kontraktor dan PERMEN PU 2016 pada Pekerjaan Konstruksi Baja Proyek Gedung Fakultas Ilmu Pendidikan Universitas Tribhuwana Tunggadewi Malang Nggiku, Yusman Umbu ; Suhudi; Wijaya, Handika Setya
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 1 (2018): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (815.671 KB)

Abstract

Steel construction job wages System in particular the steel column is a system or method used to set up and manage a steel construction projects ranging from planning up to its implementation. The purpose of the research on steel columns, this job is to know the results of the comparison of wage workers unit price where a more efficient method of contracting with wages method PERMEN PU 2016. In this thesis the author calculates the cost budget plans Project Construction Faculty of Education UNITRI Malang between AHSP contractors with PERMEN PU 2016. The coefficients used analysis units of workers contracting method and the method of PERMEN PU 2016 is same. The results of the comparison analysis of steel construction job wages are the construction of the Faculty of education was especially UNITRI steel columns retrieved results calculation planning cost budget methods of Contractor Registration Rp 45,455,256.84 and PERMEN PU 2016 registration Rp 54,156,803.01. The price difference is obtained from the calculation of the steel column of this analysis proved that the contractors more efficiently than on analysis of PERMEN PU 2016.
Evaluasi Kinerja Terminal Arjosari Malang Dengan Metode IPA (Importance Performance Analisis) Selan, Fitron Andrias ; Kristafi A, Andy; Rahma, Pamela Dinar
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 1 (2018): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (634.767 KB)

Abstract

Terminal Arjosari Raden Intan Road are located at no.1 Kecamatan Blimbing Malang. Terminal Arjosari planned to become a complete modern terminal in East Java which its status raised to the previous type A type B still. The purpose of this research is to know the performance of the service Terminal Arjosari Poor views from passenger satisfaction levels and further to figure out an alternative strategy that is appropriate for the performance of the terminal in order to optimally and passengers can be sated. Performance evaluation of variable analyzing Terminal security, maid service reliability/regularity of service, convenience, service convenience/affordability, equality service using the methods of NATURAL SCIENCE (Importance Performance Analysis). Site survey in the terminal. A survey of facilities and survey kuisoner to interview respondents (as many as 100 passengers).Of research results obtained by some facilities that do not yet exist in the terminal like information and health facilities, evacuation, fire extinguishers, the attendant checks the vehicle, light vehicle repair facilities, information on disorders travel by public transportation, nursing mothers, and ATM Center. From the results of the analysis with the method of IPA obtained 11 attributes according to the respondents is not satisfactory but their importance is very important. These results suggest that Terminal Arjosari Malang is not working optimally so that needed an alternative repair by optimizing service of 11 attributes by adding facilities that do not yet exist and to improve facilities that already exist but are not functioning optimally.
Pengaruh Serat Sabut Kelapa Terhadap Kuat Tekan dan Kuat Tarik Beton Mutu (f’c 19,3 Mpa) Benu, Ari ; Ningrum, Diana ; Wijaya, Handika Setya
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 1 (2018): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (871.405 KB)

Abstract

Developments in Indonesia in the physical sense like housing and other means, with the increasing population. On the other hand the construction of the House were living with a cheap cost is a program that always have to be coveted by both the Government and the community at this time. In an effort to reduce the cost of the building, one way is with utilization of household waste, as it is easy to obtain, and may be the source of livelihood of the local people of whom the utilization of coir fibers taken. The value of strong press and strong pull from each of the test objects with a different aggregate binder on the value of strong concrete press for 2 cm value strong and powerful to 286.0 press press 4 cm for the value of strong tekan290 .6 for powerful press and to 269.6 6 cm strong tensile concrete 2 cm of strong value for length of pull and 129.6 fiber tensile strong 121.1 rating 4 cm and 6 cm for the strong value of the highest tensile 177.7 data or highest value The addition of coir fibers for concrete mix in testing powerful press and its strong for some cylinders increased for his testing and for some have decreased against testing. For the length of the fiber coir for testing robust press and strong tensile concrete in concrete mix that is a strong value 6 press increased
Studi Manajemen Waktu Proyek Pembangunan Rumah Sakit Islam Malang Lalisuk, Stefanus; Suhudi ; Wijaya,, Handika Setya
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 1 (2018): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (514.29 KB)

Abstract

Construction Management is one of the most important sciences and needs to be mastered in carrying out a project. One part of project management itself is time management. The time management system is one of the determinants of the success of the contractor in managing the project, especially in terms of time. Appropriate job schedule settings can minimize the obstacles that may occur in the implementation of the project. In each scheduling must pay attention to the order of each job so that a separate experience is needed for the planner. One important part of time management itself is the measurement of work performance. This is done so that the implementer can find out how much work weight has been completed based on Time Schedule. Earned Value Method Being one of the options as an indicator in measuring the progress of work carried out in Malang Islamic Hospital Building. The use of Earned Value can be seen from the progress of the work project implemented and can predict the completion time of the Malang Islamic University hospital construction project.
Penerapan Konsep Earned Value Analysis terhadap Kinerja Biaya dan Waktu pada Proyek Pembangunan (Studi Kasus Proyek Pembangunan Gedung Terminal Pariwisata) Purnomo, Dimas Aji ; Prisilia, Harliwanti
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 1 (2018): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (888.244 KB)

Abstract

The development of construction projects is currently increasingly large and complex both in terms of physical and cost. In this case the project planning and control is applied to the construction of the Integrated Tourism Terminal Building which has a total price of Rp. 12,904,970,589.17 with a implementation period of 154 calendar days. One alternative that can be used in an effort to overcome the constraints on this project is the "Earned Value" method. The concept of earned value is one of the tools used in managing projects that integrate costs and time. The purpose of this study is to determine the cost and time performance, estimated costs and time at the end of project completion and the factors that cause project delays or progress. The results of the analysis known at the end of the project review in the 20th week, the project schedule performance (SPI) was 1,19 which meant that the project's performance was faster than planned. While in terms of cost performance it can be concluded that the costs incurred are greater than the plan, this is indicated by the CPI value of 0,45. If the project performance trend is at the end of the 20th week review, based on this condition, the estimated total cost to be spent is Rp. 13,463,188,080 where the figure is far greater than the project budget of Rp. 12,904,970,242. When viewed from the estimated time of completion of the project is 130 days which means faster than planned time of 154 days.
Uji Kekuatan Dinding Batu Bata dengan Spesi yang Bervariasi Menerima Beban Tekan Terpusat Firmansyah, Revaldo; Karjanto, Adjib; Djatmika, Boedya
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 1 (2018): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (909.873 KB)

Abstract

Generally, bricks are used as building structural wall materials and dwelling. This study aims to find out the strength of the brick wall pairs when receiving a lumped load of the roof structure of a mixture commonly used by the community is 1 PC: 8 Sand and 1 PC : 10 Sand so as to avoid cracks in the wall due to the roof structure load. This test used  local bricks from Tumpang Malang with Model M-6B 230 mm x 110 mm x 55 mm. Another materials obtained from the building store in Malang City. The testing method used is SNI 03-4166-1996 robust test procedure for compressing red brick. The test method used is SNI 03-4166-1996 about the test procedure of compressive strength of red brick masonry wall. The dimensions of specimens is 75 x 64 cm as much as 3 samples of each thickness variation, where the thickness variation is 3 cm, 4 cm, and 5 cm so that the number of sample objects test all 18 specimens. Further test object tested press using UTM according SNI 03-4166-1996. The result showed that the average compressive strength of brick masonry wall was 1 PC : 8 Sand on variation of thickness of 3 cm, 4 cm, 5 cm, respectively by 8.26 kg/cm2, 7.63 kg/cm2, 7.4 kg/cm2. The average compressive strength of brick masonry wall of 1 PC : 10 Sand on variation in thickness of 3 cm, 4 cm, 5 cm, respectively by 8.11 kg/cm2, 6.91 kg/cm2, 6.46 kg/cm2.
Review Design Struktur Pada Gedung B Universitas Tribhuwana Tunggadewi Malang Sumarno, Andi; Wijaya, Handika Setya ; Suhudi
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 2 (2019): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (291.426 KB)

Abstract

The design review of the structure building is located in Lowokwaru sub-district, Malang Regency, East Java Province with an area of 4.78 hectares. So far, there has not been a review of design in Building B of the Tunggadewi tribhuwana university of Malang. Therefore, it is necessary to conduct research on a review of the structural design of building B. The structure design review aims to determine the strength of the previous building B for the addition of two floors in building B at the Tunggadewi Malang tribhuwana university. Design review is carried out with two structural designs, the first is a concrete structure design with dimensions of forty square centimeters, the second is a steel structure design with three hundred and fifty wf. The two structures are designed to determine the dimensions of the column beams when adding two floors to the structure. So as to produce dimensions in the beam column which will be used in the structure to be built in building B at the tribhuwana tunggadewi malang university
Penentuan Kebutuhan Air Irigasi Optimum dengan beberapa Alternatif Pola Tata Tanam pada Daerah Irigasi Semalat Handriyati , Mimie Try ; Khaerudin , Dian Noorvy ; Sulistyani, Kiki Frida
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 2 (2019): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (356.377 KB)

Abstract

Semalat Irrigation Area (DI) is an irrigation area located in Sungai Betung District, Bengkayang Regency, West Kalimantan Province with an area of 51.91 hectares. So far, there has been no determination of optimum cropping patterns in accordance with agricultural conditions in Semalat. Therefore, there is a need for research on an analysis of the determination of optimum planting patterns from several alternatives. Determination of the optimum planting system pattern aims to maximize agricultural land that is irrigated by irrigation so as to obtain increased crop yields with the need for efficient irrigation water. The choice of a number of alternative planting patterns is based on the time of the start of the planting period. There are five alternative cropping patterns proposed in the Semalat Irrigation Area, the first is the existing cropping pattern by starting the first rice planting on November 1, the first alternative by starting the first rice planting on October 15, the second alternative by starting the first rice planting in November 15, the third alternative by starting the first rice planting on December 1, and the fourth alternative by starting the first rice planting on December 15. Of the five alternatives proposed in Semalat, the optimum cropping pattern is the existing cropping pattern starting with the first rice planting on November 1 with a total irrigation water requirement for 51.91 hectares of rice field area is 86.17 lt / sec / ha.
Efektivitas Asap Cair Sebagai Antioksidan Alami Untuk Menghilangkan Ketengikan Minyak Goreng Curah Harra Alla, Debora ; Ndjuru Mana, Melvianus Ndena
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 2 (2019): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (416.319 KB)

Abstract

Cooking oil is one of the basic needs of the community to fulfill their daily needs. Cooking oilconsumed every day is closely related to health. It is important for us to know the quality ofcooking oil that we use everyday. This study aims to examine the analysis of the quality of bulkcooking oil and eliminate the rancidity of bulk cooking oil by adding liquid smoke as a naturalantioxidant. Liquid smoke from rice husk produced from the pyrolysis process containscellulose, hemicellulose and lignin to produce phenol compounds, acidic compounds and theirderivatives. Can be used as an antioxidant to eliminate rancidity in bulk cooking oil. Theanalysis of the quality of bulk cooking oil is carried out by using observational parameters,namely FFA test, acid number, and peroxide number. The results of the research on bulkcooking oil showed that the value of FFA levels, the value of acid numbers and the value ofperoxide numbers decreased. And meet the requirements of the value of free fatty acids, acidicvalues and peroxide values for cooking oil quality standards.
Potensi Ketersediaan Air Pada Free Intake Wae Musur 1 dan 2 Untuk Pengembangan Lahan Pertanian Di DAS Borong Kabupaten Manggarai Timur Simson ; Khaerudin , Dian Noorvy; Sulistyani, Kiki Frida
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 2 (2019): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (629.38 KB)

Abstract

This study aims to analyze the potential of water availability in the free intake of Wae Musur 1 and 2 which are used to meet the needs of functional and potential irrigation water in the Borong watershed, East Manggarai Regency. The method used in this research is quantitative analysis method. The calculated availability of water is surface water in the form of a reliable river discharge. Water requirements for functional and potential land are calculated based on the assumption that 1 hectare is equal to 1 liter / second. The analysis shows that the average availability of mainstay debit in January to December is 4,5 million m3/month. Balance sheet analysis shows that the mainstay discharge available for free intake of Wae Musur 1 and 2 is able to meet the needs of functional land irrigation water and is still surplus. Therefore, this surplus is used to meet potential land irrigation water needs. After analyzing the water balance, the potential for irrigation water needs is apparently still experiencing a surplus as well. Surplus ranges from 0,3 million to 6,3 million m3/month.

Page 6 of 24 | Total Record : 234