cover
Contact Name
agata iwan candra
Contact Email
iwan_candra@unik-kediri.ac.id
Phone
+62811308010
Journal Mail Official
iwan_candra@unik-kediri.ac.id
Editorial Address
Jl. Selomangleng 1 Gedung A no.110 - KEDIRI 64115 JAWA TIMUR - INDONESIA
Location
Kota kediri,
Jawa timur
INDONESIA
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS)
Published by Universitas Kadiri
ISSN : -     EISSN : 26217686     DOI : http://dx.doi.org/10.30737/jurmateks
Core Subject : Engineering,
JURMATEKS (Jurnal Mahasiswa Teknik Sipil) diterbitkan oleh Program Studi Teknik Sipil, Fakultas Teknik, Universitas KADIRI untuk menampung hasil penelitian, tugas akhir maupun tugas proyek mahasiswa teknik sipil di lingkungan Universitas KADIRI.
Articles 313 Documents
ANALISA PENJADWALAN DENGAN METODE PERT DAN MATHCAD (Study Kasus Proyek Pembangunan Restaurant Farm House di Lembang) Tofek Nur' Amin; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (276.819 KB) | DOI: 10.30737/jurmateks.v3i1.895

Abstract

Project control is one of the functions and processes in project management that influences the project's outcome. Project control has an essential role in minimizing any deviations that can occur during the project process. In project scheduling, need to, management planning, schedule, and control. Development of Restaurant Farm House planned by PT. DWI MARTHA JAYA is estimated to take 334 days at the cost of Rp. 9.068.780.000,00. Based on information obtained in the field. The type of research method applied in this research is the schedule analysis method on the RAB (Budget Plan) by comparing and analyzing project scheduling using PERT and MathCad methods. The data collection techniques chosen were observation and documentary. From the results of the analysis, the completion time of the Restaurant Farm House construction project is 310 days and a labor cost savings of Rp. 93,341,832.00 out of a total cost of Rp 9.068.780.000,00. So that an overall loss of Rp 8.975.438.168,00. Pengendalian proyek merupakan salah satu fungsi dan proses dalam manajemen proyek yang berpengaruh pada hasil akhir proyek. Pengendalian proyek mempunyai peran penting dalam meminimalisasi segala penyimpangan yang dapat terjadi selama proses berlangsungnya proyek. Pada penjadwalan proyek diperlukan penanganan manajemen kerja yang terdiri dari perencanaan, penjadwalan dan pengendalian. Pembangunan Restaurant Farm House yang direncanakan oleh PT. DWI MARTHA JAYA diperkirakan memakan waktu 334 hari dengan biaya Rp. 9.068.780.000,00. Hal ini berdasarkan informasi yang diperoleh di lapangan. Jenis metode penelitian yang diterapkan dalam penelitian ini adalah metode analisis time schedule pada RAB (Rencana Anggaran Biaya) dengan membandingkan dan melakukan analisa penjadwalan proyek menggunakan metode PERT dan MathCad. Teknik pengumpulan data yang dipilih adalah dengan observasi dan dokumenter. Dari hasil analisis dengan dua metode tersebut diperoleh waktu penyelesaian proyek pembangunan Restaurant Farm House adalah 310 hari dan diperoleh penghematan biaya tenaga kerja sebesar Rp. 93.341.832,00 dari biaya total Rp 9.068.780.000,00, sehingga diperoleh biaya keseluruhan Rp 8.975.438.168,00. 
PERENCANAAN PONDASI SUMURAN PADA PROYEK PEMBANGUNAN GEDUNG ASRAMA BALAI PEMBANGUNAN SDM DAN PERTANIAN BANTUL DIY Moh. Idham Cholid; Sigit Winarto; Yosef Cahyo; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (254.948 KB) | DOI: 10.30737/jurmateks.v3i1.888

Abstract

The foundation serves to hold the burden on the upper structure, which is transmitted to the soil layer. Data collection uses primary and secondary data, as well as direct visits to the development project site. The choice of wells foundation because of the restricted location of restricted location and minimal vibration chose the wells foundation as a method of implementation. There are two types of foundation types, namely P1 type with a load of 46.093 tons and P2 type of foundation with a load of 78.517 tons. The carrying capacity of the land for type 1 was 59,227 tons, with a decrease of 0,143 Cm. While the carrying capacity of P2 type is 118.1 tons with a reduction in type 2 of 0.202 Cm. The maximum reduction requirement is 2.5 Cm, then of each kind of foundation the safe reduction condition. The planned foundation of the primary reinforcement uses 12 D19, and the spiral reinforcement uses Ø10-100. For support of the pile cap, the X direction uses D19-175, and the Y direction uses D19-175.Pondasi berfungsi untuk menahan beban pada struktur atas yang diteruskan ke lapisan tanah. Perolohan data menggunakan data primer dan sekunder, serta meninjau langsung ke tempat proyek pembangunan. Pemilihan pondasi sumuran karena lokasi sempit lokasi sempit dan minim getaran memilih pondasi sumuran sebagai metode pelaksanaan. Terdapat 2 jenis tipe pondasi, yaitu tipe P1 dengan beban yang dipikul sebesar 46,093 ton dan tipe pondasi P2 dengan beban yang dipikul sebesar 78,517 ton. Daya dukung tanah untuk tipe 1 sebesar 59,227 ton, dengan penurunan sebesar 0,143 Cm. Sedangkan daya dukung tanah tipe P2 sebesar 118,1 ton dengan penurunan tipe 2 sebesar 0,202 Cm. syarat penurunan maksimal adalah 2,5 Cm, maka dari masing-masing tipe pondasi syarat penurunan aman. Pondasi yang direncanakan tulangan utama menggunakan 12 D19 dan tulangan spiral menggunakan Ø10 – 100. Untuk penulangan pile cap arah X menggunakan D19 – 175 dan arah Y menggunakan D19 – 175.
ANALISA KELAYAKAN SIMPANG EMPAT TAK BERSINYAL MENGGUNAKAN MANUAL KAPASITAS JALAN INDONESIA Sugeng Yani Widodo; Yosef Cahyo; Sigit Winarto; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (257.796 KB) | DOI: 10.30737/jurmateks.v3i1.900

Abstract

The transportation problem is one of the main issues that are difficult to solve in several big cities. When congestion occurs, it can disrupt community activities. We already know that "congestion will cause various negative impacts, both on the driver and in terms of the economy and environment. The intersection of four highways, Blitar City, East Java, has the intensity of a dependable vehicle. This is because around the area, and there are markets, residential areas, public force terminals, and squares. Besides that, the place is accessible to public transportation from Blitar City to Malang City. In this study, the authors conducted a field survey of traffic flow, road geometry, and side barriers during rush hour during sunny weather for seven days at the intersection. From the results of the analysis, minor paths have disrupted major pathways and caused delays of 35%. This figure has exceeded the requirements recommended by MKJI 1997. From the results of this study, it can also be an evaluation material so that in the future, the intersection of four Highway, Blitar City, East Java, can be functioned better.Masalah transportasi adalah salah satu masalah utama yang tidak mudah dipecahkan di beberapa kota besar. Pada saat kemacetan terjadi bisa menggangu aktifitas masyarakat. Telah kita ketahui, bahwa kemacetan akan menimbulkan berbagai dampak negatif, baik terhadap pengemudi maupun ditinjau dari segi ekonomi dan lingkungan. Simpang empat Jl. Raya Barat, Kota Blitar, Jawa Timur merupakan salah satu persimpangan dengan intensitas kendaraan yang cukup padat. Hal ini disebabkan karena disekitar simpang empat tersebut terdapat pasar, pemukiman penduduk, terminal angkot, alun – alun. Selain itu, simpang empat tersebut merupakan akses untuk angkutan umum dari Kota Blitar menuju Kota Malang. Pada penelitian ini penulis melakukan survey lapangan terhadap arus lalulintas, geometri jalan, dan hambatan samping pada jam sibuk saat cuaca cerah selama 7 hari pada simpang empat tersebut. Dari hasil analisa, jalur minor sudah mengganggu jalur mayor dan menyebabkan tundaan sebesar 35%. Angka ini sudah melampaui syarat yang dianjurkan oleh MKJI 1997. Dari hasil penelitian ini juga dapat menjadi bahan evaluasi agar kedepannya simpang empat Jl. Raya Barat, Kota Blitar, Jawa Timur, bisa difungsikan dengan lebih baik.
PERENCANAAN PONDASI TIANG PANCANG GEDUNG DINAS TENAGA KERJA DAN TRANSMIGRASI Ahmada Khotibul Umam; Sigit Winarto; Ahmad Ridwan; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (313.219 KB) | DOI: 10.30737/jurmateks.v3i1.883

Abstract

The foundation has an important role in the field of construction. The function of the foundation is to transport the building load to the subgrade, so the foundation must be planned with the right calculation so that the building is safe and stable. Pile foundation is one type of foundation used in building construction with heavy loads. In research, land investigations use SPT (Standard Penetration Test). The calculations include the carrying capacity of the soil, the loading of buildings, the dimensions and depth of the pile, and the stability of the controls. Calculation results obtained, loading on floors 1 to 3, totaling 4,463.5 Tons. The dimensions of the foundation are 0.6, with a cross-sectional area of 0.28274334 and a depth of 18 M. The need for strengthening the foundation is 600059.7 Kg. With bolt control stability 24,620 Tons / M2 > 1.5 Tons / M2 – >   Safe, shear  9,156 Tons / M2  > 0,156 Tons / M2 –  > Safe.Pondasi memiliki peranan penting dalam bidang konstruksi. Fungsi pondasi sendiri yaitu meneruskan beban bangunan ke tanah dibawah pondasi menjadikan pondasi harus direncanakan dan diperhitungkan dengan tepat agar bangunan yang didirikan aman dan stabil. Salah satu jenis pondasi yang banyak digunakan yaitu pondasi tiang pancang. Pondasi tiang pancang merupakan salah satu jenis pondasi dalam yang banyak digunakan pada konstruksi yang memiliki beban berat. Dalam penelitian, penyelidikan tanah menggunakan metode SPT (Standart Penetration Test). Perhitungan yang dilakukan meliputi perhitunagn daya dukung tanah, Pembebanan bangunan, dimensi dan kedalaman tiang pancang, serta stabilitas control. Hasil dari perhitungan didapat, pembebanan lantai 1 sampai 3 sebesar 4663,5 Ton. Dimensi pondasi sebesar 0,6 M dengan luas penampang 0,28274334 M dan kedalaman 18 M. Kebutuhan tulangan pondasi yaitu 600059,7 Kg. Dengan stabilitas kontrol terhadap guling 24,620 Ton / M2 > 1.5 Ton / M2 – >   Aman, Gaya terhadap geser 9,156 Ton / M2  > 0,156 Ton / M2 –  > Aman.
PERENCANAAN PONDASI TIANG PANCANG GEDUNG PASCA SARJANA FAKULTAS TEKNIK UNIVERSITAS KADIRI Rizaludin Rizaludin; Sigit Winarto; Ahmad Ridwan
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (296.033 KB) | DOI: 10.30737/jurmateks.v3i1.889

Abstract

The foundation is a part of the structure that functions as a support for the building and distributes the burden on it (upper fabric) or the soil layer with a stable enough carrying capacity. In planning the foundation for a structure can use several types. The selection of the foundation to be used based on the weight of the building. The construction of the C story building seven-story University requires a strong foundation. The pile foundation was chosen because it was relatively fast, easy, and yielded hard soil at 5.6 m. In this calculation, three methods as a Trofimankove method and the Meyerhoff method and the General Method Method. Pile foundation planning has a planned load of Qu 231 Ton. The calculation of the three ways obtained more efficient results, namely the count with a Meyerhoff method equal to 82.21. The number of single piles that are close to one pile cap is four poles, so the calculation formula of the Pall piles group is 232.82 tons. Thus it can be concluded that Pmax <Pall 231 Ton <232.82 Ton, which means that it meets the requirements.Pondasi adalah bagian struktur yang berfungsi sebagai penopang bangunan dan menyalurkan beban diatasnya (upper structure) atau lapisan tanah yang memiliki daya dukung yang cukup kuat . Dalam merencanakan pondasi untuk suatu struktur dapat menggunakan beberapa macam tipe pondasi. Pemilihan pondasi berdasarkan fungsi bangunan atas yang akan dipikul oleh pondasi tersebut, berdasarkan beban dan beratnya bangunan atas kedalaman tanah dimana bangunan tersebut didirikan. Pembangunan gedung C berlantai 7 Universitas Kadiri memerlukan pondasi yang kuat. Pondasi tiang pancang dipilih karena pekerjaan relatif cepat, mudah dan hasil sondir tanah keras pada 5,6 m. Pada perhitungan ini digunakan tiga metode yaitu metode Trofimankove dan metode mayerhoff serta Metode cara Umum. Perencanaan pondasi tiang pancang memiliki beban rencana sebesar Qu 231 Ton. Dari perhitungan ketiga metode didapat hasil yang lebih efisien yaitu pada perhitungan dengaan metode mayerhoff yaitu sebesar 82,21. Jumlah tiang tunggal yang mendekati pada satu pile cap adalah 4 tiang, sehingga diperoleh dari rumus perhitungan Pall tiang kelompok 232,82 Ton. Dengan demikian dapat disimpulkan Pmaks < Pall 231 Ton < 232,82 Ton, yang artinya memenuhi syarat.
MENINGKATKAN BERAT VOLUME KERING TANAH VERMICULITE MENGGUNAKAN SERBUK MARMER Hadi Santoso; Yosef Cahyo; Ahmad Ridwan
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (191.125 KB) | DOI: 10.30737/jurmateks.v3i1.896

Abstract

Clay soil is soil that has mineral particles that produce plastic properties in the soil when mixed with water. Clay soils can be distinguished according to their constituent minerals. Vermiculite is one of the clay minerals that is often found in clay soils and has almost the same properties as montmorillonite, namely it absorbs a lot of water which will fill the pore cavities so that the soil will expand and consequently its strength will decrease. The method of soil stability in the following research is to use marble powder waste at variations of the addition of 0%, 6%, 12% and 18% on Vermiculite soil. In the soil stability test, the specimens were mixed with Vermiculite soil with marble powder by testing the Fill Weight, Consistency Limit (Atterberg Limit) and Soil Compaction (Proctor). In the results of the study the original soil structure was categorized as Vermiculite and after adding marble powder to the addition of a maximum variation of 12%, the Liquid Limit value increased to 56% and the Plastic Limit value increased to 24.49%, so that the plastic index could increase to 31.64 %. During the compaction test with the condition of the specimen being perfectly solid, the dry volume weight of the original soil was 1.508 gr/cm3 and after adding 12% marble powder waste, the dry volume weight increased to 1,569 gr/cm3. Tanah lempung adalah tanah yang memiliki partikel-partikel mineral yang menghasilkan sifat-sifat plastis pada tanah bila dicampur dengan air. Tanah lempung dapat dibedakan menurut mineral penyusunnya. Vermiculite merupakan salah satu mineral lempung yang sering dijumpai pada tanah lempung dan mempunyai sifat hampir sama dengan montmorilonite yaitu banyak menyerap air yang akan mengisi rongga pori sehingga tanah akan mengembang dan beraktibat kekuatannya menurun. Cara stabilitas tanah pada penelitian berikut adalah dengan menggunakan limbah serbuk marmer pada variasi penambahan 0%, 6%, 12% dan 18% pada tanah Vermiculite. Pada test uji stabilitas tanah adalah dengan menggunakan benda uji mix tanah Vermiculite dengan serbuk marmer dengan melakukan uji Berat Isi, Batas konsistensi (Atterberg Limit) dan Pemadatan Tanah (Proctor). Pada hasil penelitian struktur tanah asli dikategorikan Vermiculite dan setelah ditambah serbuk marmer pada penambahan divariasi maksimal sebesar 12%, nilai Liquid Limit naik menjadi 56% dan nilai Plastic Limit mengalami kenaikan menjadi 24,49%, sehingga index plastic dapat mengalami peningkatan menjadi 31,64%. Saat uji pemadatan dengan kondisi benda uji padat sempurna, berat volume kering tanah asli sebesar 1,508 gr/cm3 dan setelah ditambahkan limbah serbuk marmer sebesar 12% mengalami peningkatan berat volume kering menjadi 1,569 gr/cm3
STUDY PERENCANAAN PONDASI GEDUNG GUEST HOUSE 6 LANTAI DI KOTA KEDIRI Supriyadi Supriyadi; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (230.47 KB) | DOI: 10.30737/jurmateks.v3i1.890

Abstract

The building foundation is a lower structure that functions to carry the weight of the load to the subgrade. The foundation planning study in this study uses a bore pile type of foundation. This study uses the Meyerhoff method based on SPT data received by CV. Arya Duta. In this bore pile foundation planning, the carrying capacity of the bore pile foundation to the ground is 81.00 tons, with a depth of 26 M from the ground surface. The results of the calculation of pile drill piles get P 19.44 tons at the bottom of 26 M while the reinforcement of the pile cap is found in q 1.152 Ton / M (own weight). In the bore pile with spiral support found the results of the analysis data ((D. concrete 600 mm, Blanket 40 mm), (D reinforcement 16 mm, number of reinforcement 10), (D. stirrup 10 mm, Spacing 60 mm)). Based on the overall results of the structure, weight was found 16,771.43 Tons / M. Thus, from the analysis of equivalent lateral force loads (Fi 77.71), it was found that the construction of building structures is earthquake resistant.Pondasi merupakan struktur bawah bangunan yang berfungsi meneruskan berat suatu beban pada bangunan ke tanah dasar. Study perencanaan pondasi pada penelitian ini menggunakan pondasi tipe bore pile. Penelitian ini menggunakan metode Mayerhoff berdasarkan data SPT yang di terima oleh CV. Arya Duta. Pada perencanaan pondasi bore pile ini didapatkan kemampuan daya dukung pondasi bore pile terhadap tanah adalah sebesar 81.00 Ton, dengan kedalaman 26 M dari permukaan tanah. Hasil perhitungan tiang bor pile mendapatkan hasil P 19,44 Ton pada kedalaman 26 M. Sedangkan pada penulangan pile cap di temukan q 1,152 Ton/M (berat sendiri). Pada bore pile dengan tulangan spiral di temukan hasil data analisis ((D.beton 600 mm, Selimut 40 mm), (D tulangan 16 mm, jumlah tulangan 10), (D. sengkang 10 mm, Spasi  60 mm)). Berdasarkan hasil keseluruhan berat struktur ditemukan 16.771,43 Ton/M. Dengan demikian, dari analisis beban gaya lateral ekuivalen (Fi 77,71) didapatkan bahwa, Kontruksi struktur gedung tahan terhadap gempa.
UJI KUAT TEKAN DAN ARBSORPSI PADA BETON RINGAN DENGAN PENAMBAHAN LIMBAH BATA RINGAN DAN BUBUK TALEK Krisna Dwi Kurniawan; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (184.247 KB) | DOI: 10.30737/jurmateks.v3i1.872

Abstract

Concrete is one of the construction components used in buildings, bridges, or roads. In this study, The authors learned to create concrete that is lighter than standard concrete, that is by using light cement with a weight of 0%, 10% 20%, 30%, 40% of the volume of sand and talc powder weighing 8% of the volume of cement. The strength targeted in this study is k-225. Meanwhile, this study's results are the value of concrete compressive strength, which is increased by the target set k-225 to be k-400 in one of the normal concrete samples and has an average of k-360. 10% 20%, 30%, 40% and 8% talc powder increase with each average yield of k-294, k271, k-251, and k-225. To check the absorption of concrete samples, check the average increase in immersion 1 hour 0.0016%, 4 hours 0.0027%, and 24 hours 0.0047%. For the results of testing the type of weight, from each variation of test specimens 1 - 5, the resolution decreases 2.26, 2.24, 2.23, 2.16, and 2.028. The one with the lowest specific gravity is variation five concrete, with a variation of the average specific gravity 2,028.Beton merupakan salah satu komponen konstruksi yang pada umumnya digunakan pada bangunan gedung, jembatan maupun jalan. Pada penelitian ini Penulis bertujuan untuk menciptakan Beton yang lebih ringan dari pada Beton normal yaitu  menggunakan tambahan limbah bata ringan dengan bobot 0% , 10% 20%, 30%, 40% dari volume pasir dan bubuk talek dengan bobot 8% dari volume semen. Kekuatan yang ditargetkan pada penelitian ini adalah k-225. Adapun hasil dari penelitian ini adalah nilai kuat tekan Beton mengalami peningkatan target yaitu yang awalnya k-225 menjadi k-400 pada salah satu sampel Beton normal dan memiliki rata- rata k-360. Kemudian hasil nilai kuat tekan Beton dengan penambahan limbah bata ringan  10% 20%, 30%, 40% dan bubuk talek 8% mengalami penurunan yaitu dengan masing-masing hasil rata- rata k-294, k271,k-251, dan k-225. Untuk pemeriksaan arbsorpsi Beton sampel mengalami kenaikaan rata-rata yaitu pada perendaman 1 Jam 0,0016%, 4 Jam 0,0027% dan 24 Jam 0,0047%. Untuk hasil pemeriksaan berat jenis, dari setiap benda uji dari variasi 1 – 5 mengalami penurunan masing masing 2,26, 2,24, 2,23, 2,16 dan 2,028 maka yang memiliki berat jenis paling rendah adalah Beton variasi 5 yaitu dengan rata rata berat jenis 2,028.
PENGARUH PENAMBAHAN ABU AMPAS TEBU & ARANG BATOK KELAPA TERHADAP STABILISASI DAYA DUKUNG TANAH Alfinda Threvanian Putri; Sigit Winarto; Ahmad Ridwan
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (266.296 KB) | DOI: 10.30737/jurmateks.v3i1.897

Abstract

Each region has soil conditions that are not the same as other regions, some have good soil carrying capacity, and some are bad. The soil stabilization process involves mixing the soil with other soils to obtain the desired gradation. Stabilization is carried out if the land at the project site does not meet the requirements when used for engineering certain buildings. In the study of clay soil tested came from Jampi Hamlet of Ngentrong Village, Karangan District, Trenggalek Regency - East Java Province, the method of a mixture of bagasse ash and coconut shell charcoal consisted of 4 variations, each using a different mixture content ie 0%, 7%, 10%, and 15%, This research was conducted at the Civil Engineering Laboratory of Kadiri University. The results of the study showed that the addition of a mixture of bagasse ash and coconut shell charcoal affected soil stability. At a percentage of 15%, it produces a liquid limit of 39%, a plastic limit of 28.38%, a plastic index of 10.62%, the addition is able to improve soil properties, given that the original soil structure has a higher level of plasticity.Setiap daerah memiliki kondisi tanah yang tidak sama dengan daerah lainnya, ada yang mempunyai kondisi daya dukung tanah yang baik dan ada pula yang buruk. Proses stabilisasi tanah meliputi pencampuran tanah dengan tanah lain untuk memperoleh gradasi yang diinginkan. Stabilisasi dilakukan bila tanah di lokasi proyek tidak memenuhi syarat bila digunakan untuk rekayasa bangunan tertentu. Pada penelitian tanah lempung yang diuji ini berasal dari Dusun Jampi Desa Ngentrong Kec.Karangan Kab.Trenggalek – provinsi Jawa Timur, metode campuran abu ampas tebu dan arang batok kelapa terdiri dari 4 variasi, masing-masing mengggunakan kadar campuran yang berbeda yaitu 0%,7%, 10%, dan 15%, Penelitian ini dilaksanakan di Laboratorium Teknik Sipil Universitas Kadiri. Hasil uji penelitian menunjukkan bahwa penambahan campuran abu ampas tebu dan arang batok kelapa berpengaruh terhadap stabilitas tanah. Pada presentase 15% mengahasilkan batas cair 39%, batas plastis 28,38 %, indeks plastis 10,62%, penambahan tersebut mampu memperbaiki sifat tanah, mengingat bahwa struktur tanah asli memiliki tingkat keplastisan yang lebih tinggi.
STUDI PELAKSANAAN KINERJA PERCEPATAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG BANK DARAH RUMAH SAKIT Dr. SOEDOMO Widodo Restu Putra; Ahmad Ridwan; Yosef Cahyo; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (148.642 KB) | DOI: 10.30737/jurmateks.v3i1.892

Abstract

Dr.Soedomo Trenggalek Hospital has a goal to realize an optimal service for the community through the availability of supporting infrastructures. One of them is the Blood Bank Building Hospital. This study aims to determine how much cost efficiency and time efficiency of the Blood Bank Building construction project at Dr. Soedomo Trenggalek Hospital are accelerated for seven days. The research method used is the "S" Curve method to monitor project implementation in terms of cost and work performance. Furthermore, the Arrow Diagram method is used to speed up the time of project implementation by determining the critical path and paying attention to activities on the critical path to know the activities that need to be accelerated. The Blood Bank Building Construction Project was scheduled to be completed for 120 days with a Budget Plan of Rp. 891,374,000.00. After accelerating seven days to 113 days, a cost increase of Rp. 20,772,189.68. After accelerating 12 days from 120 to 108 days, an increase in costs of Rp. 26,627,020.90.Rumah Sakit Dr.Soedomo Trenggalek memiliki tujuan untuk mewujudkan pelayanan yang optimal bagi masyarakat melalui tersedianya sarana infrastruktur pendukung. Salah satunya adalah Gedung Bank Darah Rumah Sakit. Penelitian ini bertujuan untuk mengetahui berapa efisiensi biaya dan efisiensi waktu proyek pembangunan Gedung Bank Darah Rumah Sakit Dr.Soedomo Trenggalek jika dilakukan percepatan selama 7 hari. Metode penelitian yang digunakan adalah metode Kurva “S” untuk memantau pelaksanaan proyek ditinjau dari segi biaya dan prestasi kerja. Selanjutnya, metode Diagram Panah digunakan untuk mempercepat waktu pelaksanaan proyek dengan cara menentukan jalur kritis dan memperhatikan kegiatan – kegiatan pada jalur kritis agar dapat mengetahui kegiatan – kegiatan yang perlu dipercepat. Dalam Proyek Pembangunan Gedung Bank Darah tersebut dijadwalkan selesai selama 120 hari dengan Rencana Anggaran Biaya sebesar Rp. 891.374.000,00. Setelah dilakukan percepatan 7 hari menjadi 113 hari didapat kenaikan biaya sebesar Rp. 20.772.189,68. Setelah dilakukan percepatan 12 hari dari 120 menjadi 108 hari didapat kenaikan biaya sebesar Rp. 26.627.020,90.

Page 7 of 32 | Total Record : 313