cover
Contact Name
I Made Juniastra, ST.,MT
Contact Email
juniastra@gmail.com
Phone
+6281236329290
Journal Mail Official
vastuwidya@universitasmahendradatta.ac.id
Editorial Address
Jalan Ken Arok No.10-12, Penguyangan, Denpasar-Bali
Location
Kota denpasar,
Bali
INDONESIA
Jurnal Ilmiah Vastuwidya
ISSN : 26203448     EISSN : 27235548     DOI : https://doi.org/10.47532/jiv.v3i2
Core Subject : Engineering,
Jurnal Ilmiah Vastuwidya Scopes: Logistics and Supply Chain Management, Product Design dan Eco Product, Production System, Productivity Industrial System, Quality Management, Quality Engineering, Lean Manufacturing, Ergonomics, Human Factors Engineering, Performance Measurement Systems, Decision Analysis, Strategic Management, Project Management, Reliability, Industrial Human Resource Management, Marketing Management
Articles 9 Documents
Search results for , issue "Vol 3, No 1 (2020)" : 9 Documents clear
Analisis Koordinasi Over Current Relay Dan Ground Fault Relay Terhadap Keandalan Sistem I Nengah Sunaya; I Gede Suputra Widharma
Jurnal Ilmiah Vastuwidya Vol 3, No 1 (2020)
Publisher : Universitas Mahendradatta Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (632.491 KB) | DOI: 10.47532/jiv.v3i1.98

Abstract

This research had done base on case study in the feeder of substation 20 kV Jababeka. Existing data showed that condition is well with not too long differential, over all setting on the Overcurrent Relay (OCR) – Ground Fault Relay (GFR) in the field is well. From calculated result can be seem that current of short circuit disturb is influenced by distance between disturbance points. Using over current relay has important purpose in the protection of electricity system. The qualification need setting minimum time of over current relay in the feeder not less than 0.3 second. This consider to the relay will not in trip condition in rush current from distribution transformator that has been connected in the distribution system when the feeder starts operated. Starting time for relay in the feeder is faster than work time in the incoming side with average time about 0.4 second for one phase disturbance side. But for three phase and two phase disturbance side, work time relay has interval time about 0.4 second and than increase with average increament about 0.1 second when transmission line is longer (from distance aspects about 0%, 25%, 50%, 75% and 100%).
Perancangan Peningkatan Fungsi Hunian Masyarakat Di Lingkungan Pariwisata Untuk Menunjang Perekonomian Di Tampaksiring I Made Juniastra
Jurnal Ilmiah Vastuwidya Vol 3, No 1 (2020)
Publisher : Universitas Mahendradatta Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1228.85 KB) | DOI: 10.47532/jiv.v3i1.99

Abstract

Today's development requires humans to be more creative in seeing potential as a source of income. For a house that is in a tourism location, the house not only functions as a residence, but also has a high economic value, which can be rented and combined with other businesses so as to maximize the function of the house. Mancingan is one of the areas in Tampaksiring that has a huge natural tourism potential. Many domestic and foreign tourists travel to Tampaksiring, because they offer natural tourism based on local wisdom which is their own characteristic. This potential is a very potential thing to be utilized by the local community to improve the level of the family's economy while still preserving the Balinese tradition. In Tampaksiring there are still not many accommodation facilities, so it is a huge opportunity for local people to take advantage of these conditions. Generally the land from local people's houses is very wide and there is a lot of empty space, this is because it is still thick with the application of the Traditional Balinese Architecture concept which is characterized by this. Residential dwellings can be used with special planning to be used as a residence as well as functioning as a rental room. Circulation planning absolutely must be the main consideration to determine the zoning of the spaces in it to have optimal privacy and comfort. The position of the bedroom is good for family use or rented absolutely must get a positive view, as well as natural lighting and air to maximize the potential of the site into the building. Likewise for the concept of Traditional Balinese Architecture in the form of Natah as open space which is the center of the orientation of the building is still applied in this residence, because it is a source of strength from the environment itself. In designing the appearance of the building also still refers to the Traditional Balinese Architecture, namely the concept of Tri Angga which divides the building imaginatively into Legs, Bodies, and Heads. In its application, it is still combined with Modern Tropical Architecture to support more complex building functions.
Penerapan Undang Undang Nomor 13 Tahun 2003 Pada Sistem Upah Di Indonesia Ni Putu Decy Arwini
Jurnal Ilmiah Vastuwidya Vol 3, No 1 (2020)
Publisher : Universitas Mahendradatta Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (325.281 KB) | DOI: 10.47532/jiv.v3i1.100

Abstract

Wage, is the most important reason for the employee to do their job activity. Even this is not a reson for every worker but it’s still a biggest reason. Generally, there is 3 party that is involve in wage system in Indonesia. There is a company, worker n the government. Company is a business enitity own by individual or group that employ people and give a wage in return. Employ is a person who can do a job to produce a product or services to fulfil their needed. Government as a regulator dan consultant when this two party on their activityThere is many wage system in our country, depend on company size, economic condition, etc. ths system such as wage system based on output, wage system based on time, wholesale system, wage system based on bonus and business partner wage system. In wage calculation, company must consider about minimum regional wage. Besaide that, they also must calculate about overtime work. In Indonesia, overtime work calculate every hour and it’s depend on 5 or 6 day work day in a week. Basically, wage must be worth for humanity and balanced with workers sacrifice for the company.
Tenun Gringsing Teknik Produksi, Motif Dan Makna Simbolik Ni Ketut Sri Astati Sukawati
Jurnal Ilmiah Vastuwidya Vol 3, No 1 (2020)
Publisher : Universitas Mahendradatta Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1670.344 KB) | DOI: 10.47532/jiv.v3i1.101

Abstract

The background of this research is that Tenganan Pagringsingan Village, Karangasem Bali, produces the best Ikat Weaving in Indonesia. One of the Ikat Weaving is Gringsing Weaving produced by the community in Tenganan Pagringsingan Village, Karangasem Regency, Bali. This village is one of the villages inhabited by the people of Bali Mula or Bali Aga (Original Bali) alias Bali who were not from Java when the Majapahit Kingdom expedition to Bali. Weaving is a process of weaving between weft and warp threads. Warp yarns (threads that are attached to the loom) and weft (threads that are linked to the warp threads) which, if both are linked, will produce motifs. This simple process of craft art is now developing into a number of techniques in weaving depending on the creativity of each human - each so as to produce creations of attractive weaving motifs. In the subsequent development of weaving, it can be seen that the woven cloth produced is no longer a body covering material but the woven fabric has more functions than the body covering, for example this woven cloth has a function as traditional clothing or as the identity of the maker area. In addition, woven fabric can be used as a work of art that appears in accordance with local community life.This gringsing weaving describes the system of balance which is about the relationship between humans and humans, humans with nature, and humans with God. The god of the senses who are always worshiped by the Tenganan Pagringsingan people of Karangasem Bali are respected by a pandanus war rite, the pain seems to vanish by gringsing which always binds the body. Gringsing is believed to be able to avoid disease. Even more complex gringsing is a repellent of danger. Based on the background above, in this study the focus is on the process, forms of motifs and symbolic meaning of weaving gringsing in Tenganan Pagringsingan Village, Karangasem, Bali.
Analisis Perilaku Masyarakat Perkotaan Pada Ruang Publik Di Perumahan Kota Denpasar A. A Gede Trisna Gamana Pratama
Jurnal Ilmiah Vastuwidya Vol 3, No 1 (2020)
Publisher : Universitas Mahendradatta Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1177.584 KB) | DOI: 10.47532/jiv.v3i1.95

Abstract

The development of Denpasar City as the Capital of the Province of Bali and at the same time as the Center for Bali Growth, resulted the growth and development of the city become very rapid. Although the Denpasar City Government has tried to direct and organize the environment through spatial planning, however the direction of development and the growth of buildings has not been directed yet and is developing very sporadically towards all parts of the city. This study uses descriptive qualitative research with a rationalistic approach based on reality in the field with primary data obtained from observations, documentation in the form of images of community behavior towards public spaces in city housing. The results showed that the use of public space as a private area in the housing environment is dominated by factors due to the limited land of the house to the needs of home owners such as having vehicle that exceeds the garage capacity of the house.
Tingkat Pengelolaan Limbah B3 Pada Industri Pariwisata Di Kecamatan Kuta Selatan Ajeng Hayuanandra
Jurnal Ilmiah Vastuwidya Vol 3, No 1 (2020)
Publisher : Universitas Mahendradatta Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (299.234 KB) | DOI: 10.47532/jiv.v3i1.102

Abstract

Kuta Selatan subdistrict is one of the tourism hotspots in Bali, as shown by the rates of development in the economic sector, especially in the tourism industry. The numbers of accommodations in Kuta Selatan, from 2018 data, are 329 non-star hotel, 33 five star hotels, 12 four star hotels, 12 three star hotels, 12 four star hotels and approximately 150 private villas (BPS,2019). Daily operation of hotels produces hazardous waste such as electronic waste, LED light, oil and chemical containers. Electronic waste is content with heavy metal such as mercury, lead, lithium and cadmium. Hazardous wastes that are released into the environment without any treatment can be harmful for public health. The purpose of this research is to know how far tourism industries, especially hotels and private villas, have implemented the requirements for hazardous waste management. Hazardous waste management consists of permits, container, storage, collection and treatment. Permits and temporary hazardous waste storage are mandatory requirements for hotels to have as a first step of the whole process of hazardous waste management. Based on the data collection from 150 samples, we are shown that 70% of hotels with a capacity of 300-400 rooms already have hazardous waste temporary storage as well as the permit. With smaller scale hotels, only 50% already have hazardous waste temporary storage, as well as the permit. In contrast, in small scale accommodation, such as hotels with a capacity under 100 rooms, and private villas, only 4 % have proper hazardous waste temporary storage.
Exploration of Spatial Design Issues at Backpacker Hostels in Budapest’s Historic Center; Sebuah Review Terhadap Informality dan Adaptasi Desain di Kawasan Budapest, Hungaria Ni Putu Suda Nurjani
Jurnal Ilmiah Vastuwidya Vol 3, No 1 (2020)
Publisher : Universitas Mahendradatta Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (479.781 KB) | DOI: 10.47532/jiv.v3i1.96

Abstract

Transformation is something that cannot be avoided by everyone. Like wise with the change of a region as a phenomenon that can not be avoided by any country in the world. Many researchers who try to review more about the phenomenon of change as a form of adaptation or adjustment to the new environment. However, in developing an area many factors must be considered. When a previous area has a high historical value, the change becomes a technical matter that requires a thorough study. Like this study by Gergely Horryn et al (2017). In this study, Gergely Horryn et al tried to make an alternative hostels design for the development of the Budapest, Hungary region. Given the high historical value of this city, the authors use the method of comparing literature with design feedback from field observations. The design changes were made based on consideration of the historical value of the city, the interior of the room, and the shape of the building to be displayed. From several fedbcak designs, a conclusion about the design of hostels cube are then termed Hc.
Penerapan Manajemen Proyek Pada Tahap Pengendalian Waktu Pelaksanaan Proyek Soft Landscaping Jumeirah Resort Pecatu Graha Bali Ni Ketut Utami Nilawati; I Gde Eka Dharsika
Jurnal Ilmiah Vastuwidya Vol 3, No 1 (2020)
Publisher : Universitas Mahendradatta Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (279.253 KB) | DOI: 10.47532/jiv.v3i1.94

Abstract

Construction are increasingly needed in the implementation of projects, especially the existence of services that can control the main demands regarding the accuracy of quality, financial efficiency and time accuracy are very much needed. In implementing the Jumeirah Resort Pecatu Graha Bali Development Project, researchers focused their research on soft landscaping work. The role of project management in controlling the implementation time is to obtain a good way or technique to be applied so that limited resources can be managed so as to obtain effective and efficient results due to well-ordered arrangements.The "S" curve is one of the techniques for controlling project progress by using a combination of the "S" curve and the milestone. After looking at the schedule of plans and comparing with progress in the field, there are very significant delays in work on: (a) Groundcover work, when viewed from February 2019 time schedule groundcover work should have been completed, but progress data in the field in that month only reached 30.92%; (b) Shrubs work, if seen from March 2019 time schedule shrubs work should have been completed, but progress data in the field in that month only reached 35.86%; (c) Palms work, if seen from April 2019 time schedule palms work should have reached the final stage of work, but progress data in the field in that month only reached 43.69%. Factors causing the delay in work based on daily reports include: (a) Land not yet ready for planting because it is still waiting for civil works to be completed; (b) Delay in supply of types of plants: groundcover, shrubs and palms, because plants are imported from Java, especially in Malang areas.
Tinjauan Teoritis Pengendalian Kualitas Produk Hasil Industri Dengan Metode Statistik L.Virginayoga Hignasari
Jurnal Ilmiah Vastuwidya Vol 3, No 1 (2020)
Publisher : Universitas Mahendradatta Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (264.31 KB) | DOI: 10.47532/jiv.v3i1.97

Abstract

This study was aimed to determine the quality control process of an industrial product with theoretical statistical methods. This research was a qualitative research with literature study method. Data obtained from several studies that take samples in the field of goods industry. The data obtained was then analyzed and described descriptively. The quality of a product was one of the basic decisions of consumers to be satisfied with the products they buy according to their wishes and expectations. Statistical quality control was a problem solving technique that was used as a monitor, controller, analyzer, manager and improve the process by using statistical methods. The quality control process of an industrial product with statistical methods was as follows: 1) Made Chech Sheets, 2) Made Pareto Diagrams, 3) Made Control Charts, 4) Made Cause and Effect Diagrams, 5) Made Failure Mode Effect Anlaysis (FMEA) table.

Page 1 of 1 | Total Record : 9