cover
Contact Name
Edowinsyah
Contact Email
itpaberings89@gmail.com
Phone
+6285290642110
Journal Mail Official
itpaberings89@gmail.com
Editorial Address
Jl. Masik Siagim No. 75 Simpang Mbacang Kelurahan Karang Dalo Kecamatan Dempoh Tengah Kota Pagar Alam
Location
Kota pagar alam,
Sumatera selatan
INDONESIA
Jurnal Ilmiah Bering's
ISSN : 2355617X     EISSN : 28281160     DOI : https://doi.org/10.36050/berings.v8i02
Berings Scientific Journalis a national journal published by the Research and Service Institute (LPPM), Pagar Alam Institute of Technology (STTP). which is published periodically in March and October, with the fields of civil engineering research including hydrology, structure, construction, material technology, geometric, transportation, and also in the field of planning such as Regions and cities development and planning, Urban Design, Community Development, Housing
Articles 5 Documents
Search results for , issue "Vol 5 No 01 (2018): Jurnal Ilmiah Bering's" : 5 Documents clear
Analisis Perubahan Tata Guna Lahan Terhadap Debit Limpasan Pada Subdas Air Betung Elza Dewi; Alharia Dinata
JURNAL ILMIAH BERING'S Vol 5 No 01 (2018): Jurnal Ilmiah Bering's
Publisher : LPPM Sekolah Tinggi Teknologi Pagar Alam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (835.354 KB) | DOI: 10.36050/berings.v5i01.135

Abstract

The need for land is increasing as the population increases. To fulfill the settlement land and other needs, various efforts are carried out including the transfer of land functions. Improper land conversion will cause a run-off increase in a watershed. The runoff will experience peak discharge at any time and will cause flooding if the volume cannot be accommodated by drenase. This study aims to compare changes in land use to predict the peak flood discharge in the Air Betung sub-watershed in the 10-year re-preode. The research method uses DEM map analysis to obtain the area of ​​the watershed and the length of the main river. For rainfall distribution using two frequency analyzes in 2004-2013 and 2008-2017 and the chosen method is normal distribution. The peak discharge was calculated by the nakayasu synthetic unit hydrograph. Changes in peak discharge caused by land use changes in 2013 and 2017 experienced a change, where for 2013 the Cverages value was 0.36 and peak discharge was 151.37 m3 / sec and for 2017 the Cverages value was 0.33 and peak discharge was 138.95 m3/ sec.
Analisis Daya Dukung Pondasi Jembatan (Studi Kasus : Jembatan W6 Kota Pagar Alam) M.Sang Gumilar; Arman Sulistio
JURNAL ILMIAH BERING'S Vol 5 No 01 (2018): Jurnal Ilmiah Bering's
Publisher : LPPM Sekolah Tinggi Teknologi Pagar Alam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (854.572 KB) | DOI: 10.36050/berings.v5i01.136

Abstract

The bridge is a construction built to correlate the roads broken off by the existence of a river or strait. In this bridge foundation research aims to see the stability of the foundation on the carrying capacity of the soil, the ultimate carrying capacity (qult), stability of shear, rolling and slope. From the results of the study the bridge obtained a total weight of 10633,017 Ton / m 'of bearing capacity, 260,613 kg / m², ultimate carrying capacity (qult), 656.85 kg / m², stability against shear 4.76> 1.5 safe against shear force soil, rolling factor with a value of 7.70 > 1.5 safe against rolling force, bearing capacity of 2, 52 > 2.5 safe for landslides.
Pengendalian Proyek Instalasi Pengolahan Lumpur Tinja Kota Pagar Alam Diki Anggara; Masagus Taswin; Fameira Dhiniati
JURNAL ILMIAH BERING'S Vol 5 No 01 (2018): Jurnal Ilmiah Bering's
Publisher : LPPM Sekolah Tinggi Teknologi Pagar Alam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (555.004 KB) | DOI: 10.36050/berings.v5i01.138

Abstract

: In this study analyzing the project control of the Pagar Alam City Sludge Treatment Plant (IPLT) using software ms. Project 2007. the extent of the effectiveness of the process of controlling time, labor, material and costs in the project. Analyzing critical work paths, Analyzing workforce needs, Analyzing material needs, Analyzing work costs and cash flow. Based on the results of the analysis using the software ms.project 2007 provides more efficient results than the previous work plan, time and cost of implementation of 180 calendar days at a cost of Rp. 4,175,352,000.00 - while the results of the analysis using software 2007 ms.project time and costs are used 124 calendar days with a cost of Rp. 2,910,421,890.
Pengaruh Substitusi Abu Cangkang Sawit Terhadap Kuat Tekan Beton Vike Itteridi; Rusandinata
JURNAL ILMIAH BERING'S Vol 5 No 01 (2018): Jurnal Ilmiah Bering's
Publisher : LPPM Sekolah Tinggi Teknologi Pagar Alam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (659.204 KB) | DOI: 10.36050/berings.v5i01.139

Abstract

This research was conducted to determine the effect of substitution of palm shell ash mixture on concrete compressive strength. In this case the use of the mixture was made with as many as 9 tests and using 2 variations of concrete age 3 days and 28 days with concrete quality planning f'c = 20 mpa. Based on the results of research in the laboratory, the concrete compressive strength using Palm Shell Ash at 28 days is 20.59 mpa. The robustness of a building is greatly influenced by the quality of the concrete quality, in order to know the quality of a concrete first there is a more careful planning and supervision of the materials to be used. So far, no research has been carried out in the Pagar Alam City Area by removing the Palm Shell Ash.
Simulasi Tekanan Menggunakan Program Watercad Pada Sistem Pendistribusian Air Bersih Di Pdam Tirta Musi Palembang Mega Yunanda; Ferry Kurniawan
JURNAL ILMIAH BERING'S Vol 5 No 01 (2018): Jurnal Ilmiah Bering's
Publisher : LPPM Sekolah Tinggi Teknologi Pagar Alam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (730.414 KB) | DOI: 10.36050/berings.v5i01.146

Abstract

District Meter Area (DMA) filtering is one of the DMA located in the 3 Ilir service Unit region, with 2013 customers as much as 1,392 subscription connections and 2017 as many as 1,490 subscription connections. The purpose of research is to know the water needs in 2018, customer growth projection, water needs 5 years ahead, high loss of press on pipelines and pressure on the pipeline network of clean water distribution. The research site is Jl. Penyaringan, Lr. Tirto Mulyo, Jl. Bambang Utoyo Kiri, Lr. Sahabat, Lr. Bugis, Lr. Sianjur III, with a different high contour and wide area. The method used is Hadry Cross method and pressure simulation using WaterCAD program. The result of clean water needs analysis in 2018 is 33.027 lt/sec. Projected customer growth period of 5 years to the future (year 2022) is 2,362 subscription connection, the amount of clean water needs of 56.174 lt/sec. High Loss Press (HGS) distribution pipeline network year 2017 is the largest in the block 7 with a high loss of pressure 1.0825 m or 0.10825 atm. The result of the pressure simulation of pipelines using WaterCAD program acquired pressure of 0.7546 ATM at junction Point J-33 block 5 (Lr. Tirta Mulyo) until 1.5149 ATM at junction Point J-68 block 7 (Lr. Bugis).

Page 1 of 1 | Total Record : 5