cover
Contact Name
Edowinsyah
Contact Email
itpaberings89@gmail.com
Phone
+6285290642110
Journal Mail Official
itpaberings89@gmail.com
Editorial Address
Jl. Masik Siagim No. 75 Simpang Mbacang Kelurahan Karang Dalo Kecamatan Dempoh Tengah Kota Pagar Alam
Location
Kota pagar alam,
Sumatera selatan
INDONESIA
Jurnal Ilmiah Bering's
ISSN : 2355617X     EISSN : 28281160     DOI : https://doi.org/10.36050/berings.v8i02
Berings Scientific Journalis a national journal published by the Research and Service Institute (LPPM), Pagar Alam Institute of Technology (STTP). which is published periodically in March and October, with the fields of civil engineering research including hydrology, structure, construction, material technology, geometric, transportation, and also in the field of planning such as Regions and cities development and planning, Urban Design, Community Development, Housing
Articles 5 Documents
Search results for , issue "Vol 6 No 01 (2019): Jurnal Ilmiah Bering's" : 5 Documents clear
Analisis Kebutuhan Air Irigasi Di Desa Pagar Banyu Kecamatan Pagar Alam Utara Elpita Aisah
JURNAL ILMIAH BERING'S Vol 6 No 01 (2019): Jurnal Ilmiah Bering's
Publisher : LPPM Sekolah Tinggi Teknologi Pagar Alam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (608.874 KB) | DOI: 10.36050/berings.v6i01.148

Abstract

The overall need for irrigation water needs to be known as it is one of the important stages required in the planning and management of irrigation systems. Based on this, the purpose of this research is to analyze the irrigation water requirement in the study area of ​​Irrigation Area of ​​Pagar Banyu Village, Pagar Alam Utara Subdistrict, for Irrigation Area of ​​Pagar Banyu Village with an area of ​​26 ha, the source of water comes from Pagar Banyu water siring. Factors for determining irrigation water requirements include land preparation, consumptive use, percolation and seepage, effective change of water layer and rainfall. The calculation is done manually with the concept of KP-01. The need for irrigation water starts from the beginning of November using the rice-rice-palawija cropping pattern. From the total calculation, the irrigation water demand is 1.02 m3 / dt, while the available water discharge in Pagar Banyu is 1.37m3 / st, thus it can be concluded that the available water can meet the irrigation water needs in the irrigation area of ​​Pagar banyu Village Kecamtan Northern nature fence.
Analisi Daya Dukung Pondasi Jembatan (Studi Kasus : Jembatan W10 Kota Pagar Alam) M.Sang Gumilar; Bobi Bobi
JURNAL ILMIAH BERING'S Vol 6 No 01 (2019): Jurnal Ilmiah Bering's
Publisher : LPPM Sekolah Tinggi Teknologi Pagar Alam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (892.774 KB) | DOI: 10.36050/berings.v6i01.150

Abstract

This study aims to see the stability of the bearing capacity towards the Shear, Bolt, Landslide on the bridge. From the results of the study, the bridge obtained a total weight of 85251.8 kg / m ^ ҆ 85.25 Ton / m 'with' Soil Cohesion 10 kg / cm2 ∂ Soil 17.9 kg / cm2 Active soil coefficient 0.40 kg / m2 stability against 2.84> 1.5 shear safe against ground shear force. The rolling factor with a value of 1.9> 1.5 is safe against rolling forces, the slope of the bearing capacity is 4.55> 2.5 safe against landslides.
Studi Literatur Tentang Penggunaan Software Autodesk Revit Studi Kasus Perencanaan Puskesmas Sukajadi Kota Prabumulih Yosi Marizan
JURNAL ILMIAH BERING'S Vol 6 No 01 (2019): Jurnal Ilmiah Bering's
Publisher : LPPM Sekolah Tinggi Teknologi Pagar Alam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1991.093 KB) | DOI: 10.36050/berings.v6i01.154

Abstract

Computer Aided Design (CAD) has long been known to document architectural design work and information, replace the manual drawing method by hand and bring significant changes in project documentation. BIM (Building Information Modeling) is a paradigm shift replacing Conventional CAD. BIM is basically a digital platform for manufacturing virtual buildings. Autodesk Revit Software is a BIM (Building Information Modeling) based software that helps document projects more realistically with three-dimensional modeling. The purpose of this research in this Final Project is to design a 2-storey building using the Autodext Revit Software for modeling and drawing. The results of the study indicate the use of BIM-based applications in designing a building can simplify the design process, improve the efficiency of time, human resources and its subsequent stages. After going through an integrated process, the final model created has all the information from the architecture, structure, and output volumes automatically.
Analisis Kuat Tekan Beton Ringan Dengan Subtitusi Material Kertas Koran Dan Fly Ash vike itteridi; edowinsyah
JURNAL ILMIAH BERING'S Vol 6 No 01 (2019): Jurnal Ilmiah Bering's
Publisher : LPPM Sekolah Tinggi Teknologi Pagar Alam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (466.788 KB) | DOI: 10.36050/berings.v6i01.170

Abstract

Development in the field of construction in the modern era shows a very rapid development, including in the construction of housing, offices, hospitals and so on. Concrete as a construction material has long been used and widely applied by the community because it has advantages easily formed according to construction needs. The development of concrete technology has also continued to develop with the presence of high-strength concrete. The process of making lightweight concrete certainly requires mixed materials that have low specific gravity. One alternative material that can be used is newsprint and fly ash, both materials are materials that have a low specific gravity and are easy to work on, the addition of fly ash and newsprint so that the relationship of compressive strength and weight of concrete influence each other, the more addition of fly ash and newsprint, the compressive strength increases and the weight of the concrete increases.
PENGARUH RASIO PREKURSOR : AKTIVATOR TERHADAP KUAT TEKAN MORTAR GEOPOLIMER ABU SEKAM PADI Ria Dwi Fransiska; Tarmizi
JURNAL ILMIAH BERING'S Vol 6 No 01 (2019): Jurnal Ilmiah Bering's
Publisher : LPPM Sekolah Tinggi Teknologi Pagar Alam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (515.501 KB) | DOI: 10.36050/berings.v6i01.252

Abstract

Production cements portland resulting CO 2 that cause global instillation and a lot of chaff ash waste paddy causes environment sacrilege at territorial kibbling. Therefore developed significant alternative supplementary cement as geopolimer's mortar rice husk ash. This research did by eksprimen's method test-driving at Civil Tech laboratory STT Pagar Alam. Research is with intent to know prekursor's compare influence activator to heavy duty press, firmly presses maximum that at takings while old 28 days. Ratio that utilized by TR 1 1:1 firmly presses as big as 11,33 mpa, TR 2 1:0,85 strength press 10,56 mpa and TR 3 1:0,75 firmly press as big as 8,4 mpa. So gets to be concluded that gets its aged crescent mortar get to regard press strength. The greater ratio which utilized by press strength gets to increase, progressively little ratio which utilized by press strength gets is down.

Page 1 of 1 | Total Record : 5