cover
Contact Name
Randhi Saily
Contact Email
jice.sttpekanbaru@gmail.com
Phone
+628117070692
Journal Mail Official
jice@sttp-yds.ac.id
Editorial Address
Jl. Dirgantara No.4, Pekanbaru, Riau Publisher : Sekolah Tinggi Teknologi Pekanbaru
Location
Kota pekanbaru,
Riau
INDONESIA
Journal of Infrastructure and Civil Engineering
ISSN : 28095227     EISSN : 28095030     DOI : https://doi.org/10.35583/jice
Journal of Infrastructure and Civil Engineering (JICE) focuses on civil engineering expertise. Detailed scopes of articles accepted for submission to JICE are: Material and structure Transportation Geotechnical Water resource management Project management Disaster management
Articles 12 Documents
Search results for , issue "Vol. 4 No. 1 (2024)" : 12 Documents clear
Analysis of the Strength of the Upper Structure Due to the Addition of Floors to the First Middle School Building in Pekanbaru City Puspita Sari, Neri; Setiani, Yulia; Ikmal, Ahmad
Journal of Infrastructure and Civil Engineering Vol. 4 No. 1 (2024)
Publisher : Program Studi Teknik Sipil Sekolah Tinggi Teknologi Pekanbaru

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35583/jice.v4i1.51

Abstract

This research was carried out on the example of a Junior High School building in Pekanbaru City with an initial structure of 2 floors and engineered by adding floors vertically to become 3 floors, with the aim that when the existing building has additional floors, it will be able or not able to support the additional floor load. Then the analysis was carried out using the ETABS software modeling method based on the regulations SNI 2847:2013, SNI 1726:2019, 2052:2017 and SNI 1727:2020. The building plan has an area of 34 x 9.5 m2 with a building height of 4 m per floor. with concrete quality fc' 18.68 MPa or K225, steel quality fy 280 MPa for reinforcement smaller than 10 mm, fy 420 MPa for reinforcement diameter greater than 10 mm. The results of the initial structural analysis include the columns being able to accept the loads acting on the initial structure before the addition of floors. After the addition of the floor, the structure becomes unable to accept the loads acting on the structure, so structural strengthening of the beams and columns is needed. By changing the dimensions of column K1 to 30x50 cm2 the structure is able to withstand the additional floor load.
Optimasi Biaya Pemeliharaan Jaringan Irigasi Daerah Seberang Gunung Rahayu, Indah Tri; Fauzi, Manyuk; Siswanto, Siswanto
Journal of Infrastructure and Civil Engineering Vol. 4 No. 1 (2024)
Publisher : Program Studi Teknik Sipil Sekolah Tinggi Teknologi Pekanbaru

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35583/jice.v4i1.49

Abstract

Daerah Irigasi (DI) Seberang Gunung melayani areal seluas 581 Ha. Jaringan irigasi yang mengalami kerusakan fisik dan penurunan fungsi akan mengakibatkan penurunan nilai efesiensi , maka dari itu diperlukan kegiatan pemeliharaan untuk mengembalikan fungsi jaringan irigasi. Penelitian ini bertujuan untuk mendapatkan pemeliharaan yang optimal dengan memaksimalkan keterbatasan biaya yang tersedia. Tahap untuk mendapatkan pemeliharaan yang optimal dengan keterbatasan biaya tersebut yaitu, (1) Melakukan identifikasi terhadap kondisi fisik dan fungsi jaringan irigasi DI Seberang Gunung yang berpedoman pada Permen PUPR Nomor 12/PRT/M/2015. (2) Menentukan urutan prioritas kegiatan pemeliharaan, penetapan nilai prioritas ini berdasarkan rumus yang tercantum didalam Permen PU Nomor 13/PRT/M/2012. (3) Menentukan biaya pemeliharaan untuk setiap bangunan irigasi. (4) Optimasi menggunakan metode linier programming yang terdiri dari fungsi tujuan dan fungsi kendala, fungsi tujuan dalam penelitian ini adalah nilai prioritas sedangkan fungsi kendala pada penelitian ini adalah keterbatasan biaya. Hasil penelitian menunjukkan bahwa dengan anggaran yang terbatas yaitu sebesar Rp.119.057.337-, maka dapat dilakukan 11 kegiatan pemeliharaan yang bersifat perawatan pada DI Seberang Gunung, tetapi pada saluran primer biaya pemeliharaan hanya dapat terpenuhi sebesar 59,06%.

Page 2 of 2 | Total Record : 12