cover
Contact Name
Mahardika Darmawan Kusuma Wardana
Contact Email
p3i@umsida.ac.id
Phone
+6285646424525
Journal Mail Official
p3i@umsida.ac.id
Editorial Address
Universitas Muhammadiyah Sidoarjo, Jl. Majapahit 666 B, Sidoarjo, East Java Indonesia
Location
Kab. sidoarjo,
Jawa timur
INDONESIA
PELS (Procedia of Engineering and Life Science)
ISSN : -     EISSN : 28072243     DOI : https://doi.org/10.21070/pels
PELS (Procedia of Engineering and Life Science) is an international journal published by Faculty of Science and Technology Universitas Muhammadiyah Sidoarjo. The research article submitted to this online journal will be double blind peer-reviewed (Both reviewer and author remain anonymous to each other). The accepted research articles will be available online following the journal peer-reviewing process. Language used in this journal is Bahasa (Indonesia) or English. Aims and Scope of this journal is science and technology.
Articles 815 Documents
Analysis of Factors Causing Delays in Goods Delivery Using Multiple Linear Regression and RCA: Analisis Faktor Penyebab Keterlambatan Pengiriman Barang Menggunakan Regresi Linear Berganda dan RCA Renanda Prasetyo Putra Pratama; Wiwik Sulistiyowati
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.3134

Abstract

General Background The continuous expansion of e-commerce and manufacturing industries heavily relies on logistics companies to execute punctual distribution. Specific Background Delays during factory-to-warehouse transit negatively impact supply chain effectiveness, requiring quantitative assessments to isolate variables like vehicle condition, driver performance, scheduling issues, and traffic conditions. Knowledge Gap While current studies utilize either regression models or root cause analyses independently, deploying a sequential integration of both methodologies to quantitatively isolate dominant variables before investigating their operational origins remains underexplored. Aims This study investigates the factors influencing delivery delays by quantifying their impacts using Multiple Linear Regression and tracing the underlying causes of the dominant variables via a 5 Whys Root Cause Analysis. Results Regression analysis determined that vehicle condition and traffic congestion significantly influence delivery delays, evidenced by t-values of 3.496 and 3.498, with significance levels of 0.002. In contrast, driver performance and scheduling discrepancies did not exhibit significant isolated effects. Furthermore, the 5 Whys analysis identified the absence of preventative maintenance scheduling and the failure to utilize real-time traffic monitoring systems as the fundamental operational root causes. Novelty This research integrates quantitative statistical regression directly with qualitative root cause tracking to formulate specific, evidence-based logistical interventions. Implications Establishing mandatory preventative maintenance protocols and implementing real-time traffic monitoring systems will mitigate technical vehicle failures and navigational delays, significantly enhancing delivery punctuality. Highlights: Multiple Linear Regression identified vehicle condition and traffic congestion as the primary variables significantly influencing delivery delays. A 5 Whys analysis traced technical vehicle failures to the complete absence of a structured preventative maintenance schedule. Implementing real-time traffic monitoring protocols and mandatory maintenance tracking mitigates operational disruptions and enhances logistical punctuality. Keywords: Logistics, Delivery Delaysl Multiple Linear Regression, Root Cause Analysis, Preventative Maintenance
Application of the EOQ Method to Optimize Raw Material Inventory at PT XYZ: Penerapan Metode EOQ untuk Mengoptimalkan Persediaan Bahan Baku di PT XYZ Muhammad Arif Andriansyah; Inggit Marodiyah
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.3137

Abstract

General Background Manufacturing operations require precise material flow management to balance production continuity against the financial burdens of holding excess idle resources. Specific Background The HVAC and refrigeration sector depends heavily on raw materials like galvanized plates, where purchasing strictly based on estimates frequently leads to stockouts or severely inflated warehousing expenditures. Knowledge Gap While existing corporate policies address immediate procurement needs, they lack a calculated approach to determine exact economic thresholds, safety buffers, and dynamic reorder triggers to actively minimize total annual costs. Aims This research implements the Economic Order Quantity methodology to calculate the optimal order volume, purchasing frequency, safety stock, and reorder point for galvanized plates. Results Processing data detailing the annual consumption of 2,790,833 kilograms established an optimal purchasing volume of 1,050,645 units per transaction, executing 36 orders annually. The required safety stock was calculated at 3,141,831 kilograms to accommodate demand fluctuations. Furthermore, factoring in a 90-day lead time for material delivery, the reorder point was strictly set at 17,334,265 kilograms. Novelty This study quantitatively validates the transition from an arbitrary purchasing schedule to a fully integrated mathematical inventory framework within a high-volume HVAC manufacturing environment. Implications Deploying these calculated parameters drastically reduces holding expenditures, successfully slashing total inventory costs by Rp48,370,298,103 annually while ensuring uninterrupted production workflows. Highlights: Implementing mathematical inventory models replaces arbitrary purchasing, preventing severe stockouts and excessive holding expenditures. The Economic Order Quantity calculation dictates an optimal purchasing volume of 1,050,645 units per transaction. Establishing a 17,334,265-kilogram reorder point successfully accommodates a 90-day lead time and secures continuous production. Keywords: Economic Order Quantity, Reorder Point, Safety Stock, Galvanized Plate, Holding Cost
Analysis of the Electricity Distribution Network Asset Data Management Process at PLN UP3 Sidoarjo Using Bottleneck and PIECES Methods: Analisis Proses Pengelolaan Data Aset Jaringan Distribusi Listrik Di PLN UP3 Sidoarjo Dengan Metode Bottleneck dan PIECES Riyadhus Ilhamsyahjati; Hana Catur Wahyuni
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.3139

Abstract

General Background Electrical networks distribute energy directly to end-users, requiring meticulous equipment maintenance and reliable information systems to secure continuous operational capability. Specific Background Maintenance strategies depend on precise spatial and operational characteristics, yet technicians frequently must extract this data from disjointed digital infrastructures. Knowledge Gap While independent platforms store critical asset information, the procedural bottlenecks and inefficiencies caused by constantly switching between these fragmented systems during daily operations remain systematically unquantified. Aims This study investigates an asset data management workflow, aiming to identify operational bottlenecks and evaluate system deficiencies across six performance dimensions. Results Observational data demonstrated that a single data management sequence requires 24 minutes to complete. Bottleneck analysis identified that manually recording findings into spreadsheets and repeatedly searching for specific asset data across multiple platforms consumed the most time, requiring five minutes each. Furthermore, evaluating the system using the PIECES framework highlighted significant inefficiencies, specifically concerning repeated data entry, redundant verification procedures, and the lack of a centralized information hub. Novelty This research directly correlates specific time-measured procedural delays with qualitative system deficiencies across multiple disjointed platforms in a public utility environment. Implications Deploying a centralized web interface that aggregates spatial, operational, and fundamental asset data eliminates redundant data entry, accelerates retrieval times, and streamlines maintenance planning. Highlights: Extracting comprehensive asset information requires navigating disjointed platforms, resulting in a 24-minute procedural workflow. Manually recording findings into spreadsheets and repeatedly searching multiple platforms consume the most time, requiring five minutes each. Aggregating spatial, operational, and fundamental data into a centralized interface eliminates redundant entry and accelerates maintenance planning. Keywords: Asset Data Management, Bottleneck Analysis, PIECES Framework, Electricity Distribution Network, System Integration
Quality Control Analysis of the Arrival Washed Sand Material Using Statistical Process Control (SPC) Method at PT. XYZ: Analisis Pengendalian Kualitas Kedatangan Material Pasir Cuci Menggunakan Metode Statistical Process Control (SPC) Pada PT. XYZ As'adul Fikri; Inggit Marodiyah
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.3140

Abstract

General Background The construction sector relies on ready-mix operations that maintain strict material consistency. Specific Background Washed sand serves as a primary constituent, requiring silt content limits strictly below five percent to prevent hydration disruption and compressive strength degradation. Knowledge Gap Current acceptance procedures relying on infrequent monthly testing fail to capture daily supplier variations, allowing non-compliant materials to enter the production line. Aims This study investigates supplier compliance levels and formulates systematic corrective actions using quantitative charting techniques. Results Processing data from 2961.48 tons of incoming supplies between June and August identified 443.54 tons of defective material, representing a 43 percent overall failure rate. P-chart evaluations confirmed systemic instability, recording a July deviation of 0.216 that exceeded the 0.169 upper control limit, while June and August deviations fell below the 0.130 lower control limit. Root cause evaluation identified methodological shortcomings, specifically insufficient testing frequencies and unstandardized visual inspections, as the primary drivers of excessive impurities. Novelty This research directly correlates out-of-control supply chain deviations with specific inspection deficits at the plant receiving stage. Implications Deploying real-time control charts alongside increased testing frequencies stabilizes material acceptance protocols, prevents defective component usage, and secures final structural integrity. Highlights: Examining 2961.48 tons of incoming materials identified 443.54 tons failing acceptable impurity thresholds. P-chart evaluations confirmed unstable acceptance procedures, with July proportions exceeding maximum boundary limits. Implementing real-time tracking alongside increased testing frequencies prevents non-compliant aggregate usage. Keywords: Ready Mix Concrete, Silt Content, Process Control, Fishbone Diagram, Quality Assurance
Production Water Inventory Control for Ready Mix Concrete to Minimize Production and Delivery Delays: Pengendalian Persediaan Air Produksi Berbasis Rantai Pasok pada Industri Beton Siap Pakai Riska Novia Febriyanti; Atikha Sidhi Cahyana
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.3142

Abstract

General Background Ready-mix concrete manufacturing relies heavily on continuous material flows to fulfill construction project demands. Specific Background Water serves as the primary mixing medium for concrete products, requiring precise supply chain coordination to prevent operational stoppage. Knowledge Gap While inventory management models are frequently applied to general manufacturing raw materials, studies calculating optimal water procurement parameters specifically for concrete batching plants remain highly limited. Aims This study determines the optimal order quantity, safety stock, and reorder point for production water to prevent material shortages and distribution delays. Results Based on consumption data from May to July, the Economic Order Quantity method establishes an optimal purchase volume of 69,288 liters per order. Furthermore, statistical analysis of daily demand fluctuations dictates a necessary safety stock of 14,580.68 liters. Consequently, factoring in a one-day procurement lead time, the reorder point is precisely set at 27,916.19 liters. Novelty The research formulates a specific mathematical inventory framework, transitioning water procurement from estimation-based ordering to a data-driven replenishment strategy within the ready-mix concrete industry. Implications Adopting these calculated parameters minimizes stockout risks, secures continuous mixing operations, and ensures punctual concrete deliveries to customers. Highlights: Transitioning water procurement from estimation to calculated models resolves continuous stockout and distribution delay issues. The Economic Order Quantity calculation dictates an optimal purchasing volume of 69,288 liters per transaction. Establishing a 27,916.19-liter reorder point and a 14,580.68-liter safety stock secures production during one-day lead times. Keywords: Economic Order Quantity, Reorder Point, Safety Stock, Ready Mix Concrete, Inventory Control
Study of Residential Air Conditioner Installation Process in Field Work Activities at CV. Via Jaya Teknik: Studi Proses Instalasi Air Conditioner (AC) Rumah Tangga pada Kegiatan Praktik Kerja Lapangan di CV. Via Jaya Teknik Achmad Muchammad Rochmatus Shofa; Indah Sulistiyowati
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.3146

Abstract

General Background Household thermal comfort continuously drives the demand for reliable residential cooling systems. Specific Background Proper split system assembly involves careful mechanical routing and electrical connections to ensure optimal cooling functionality and prevent refrigerant leakage. Knowledge Gap Despite standardized assembly procedures, routine service operations often prioritize completion speed over comprehensive quantitative documentation of thermal and electrical parameters. Aims This study evaluates the actual execution times and technical obstacles encountered during the deployment of various residential cooling units. Results Observational data from twenty-nine inverter units across multiple brands revealed assembly durations ranging from 50 to 120 minutes, averaging 65.5 minutes. Completion times were strictly dictated by physical site conditions and unit distances rather than equipment specifications or brand types. Furthermore, while all observed units successfully passed standard drainage and leakage assessments, comprehensive measurements of active electrical consumption and operational refrigerant pressure were omitted due to strict target-based service conditions. Novelty This research maps theoretical assembly protocols directly against actual target-driven service practices to highlight the specific diagnostic omissions in standard residential maintenance. Implications Recognizing these service limitations highlights the necessity for integrating quantitative metric documentation into routine procedures to guarantee long-term operational safety. Highlights: Execution times for cooling units averaged 65.5 minutes, strictly dictated by physical site accessibility. All twenty-nine monitored inverter setups successfully passed standard drainage and leakage assessments. Target-driven operational procedures frequently omit comprehensive quantitative documentation of active electrical metrics. Keywords: Thermal Comfort, Inverter Technology, Assembly Duration, Refrigerant Leakage, Quantitative Measurement
Wiring Study of Replacement and Optimization of Micom Type OCR and CBF Protection Relays on the 150Kv Power Transformer Bay Kupang Panel in GIS Sawahan: Studi Wiring Penggantian Dan Optimalisasi Relay Proteksi OCR Dan CBF Jenis Micom Pada Panel Bay Kupang Trafo Daya 150 Kv Di Gis Sawahan Erdyofan Dwi Pragusta; Shazana Dhiya Ayuni
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.3148

Abstract

General Background Substations and gas insulated substations demand highly reliable electrical systems to maintain continuous energy distribution. Specific Background Securing these high-voltage transmission units requires accurate overcurrent and circuit breaker failure mechanisms to isolate operational faults rapidly. Knowledge Gap Transitioning from conventional devices to modern digital components necessitates rigorous configuration verification and parameter coordination to prevent dangerous tripping delays and terminal short circuits. Aims This study evaluates the physical integration and setting calibration of digital control devices on a transformer bay panel. Results Field implementation utilized secondary injection testing with a 7A alternating current at 50Hz for 0.2 seconds to verify the newly integrated input and output terminals. Evaluation of the existing parameters revealed significant misalignments in the primary overcurrent configurations, specifically a 21.24 percent current error and a -96.45 percent time error during stage one operations, mandating immediate parameter resetting. Conversely, stage two and stage three settings demonstrated acceptable current errors of 0.03 percent and 0.09 percent respectively, confirming their operational compliance. Novelty The research documents a systematic, field-tested verification protocol mapping physical terminal connections directly to digital error analysis in an active high-voltage environment. Implications Executing precise physical integration and correcting initial parameter discrepancies secures continuous distribution, prevents breaker failures, and guarantees operational safety. Highlights: Secondary injection testing utilizing a 7A current verified the physical terminal integration of the newly installed digital components. Parameter evaluation identified a severe timing deviation of -96.45 percent in the primary overcurrent settings, requiring immediate corrective adjustments. Correcting initial misalignments prevents breaker failures and secures continuous energy distribution across the substation network. Keywords: Over Current Relay, Circuit Breaker Failure, Secondary Injection Testing, Parameter Coordination, Gas Insulated Substation
Machining Constraint Analysis of CNC Turning in the Manufacturing Process of Titanium Ti-6Al-4V ELI Bone Screw Implants: Analisis Kendala Pemesinan CNC Turning pada Proses Manufaktur Implan Bone Screw Material Titanium Ti-6Al-4V ELI Adinda Eka Putri; Iswanto
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.3150

Abstract

General Background Orthopedic surgical fixation relies on implants manufactured from materials combining high strength-to-weight ratios with superior biological compatibility. Specific Background The automated fabrication of these cylindrical components using Ti-6Al-4V ELI alloys presents severe manufacturing difficulties due to the material's low thermal conductivity and reactive chemical properties. Knowledge Gap While studies frequently address theoretical cutting forces, comprehensive strategies integrating continuous chip management, accelerated cutting tool degradation, and structural deflection within active industrial production environments remain underexplored. Aims This study investigates specific mechanical issues encountered during the automated shaping of medical fixations and implements integrated corrective strategies to optimize production stability. Results Qualitative observation and field inspections identified continuous chip nesting that scratches surfaces, rapid tool degradation due to concentrated thermal accumulation, and dimensional tapering exceeding the ±0.04 mm tolerance caused by radial deflection. Applying focused, high-pressure emulsion fluid broke the chips into manageable segments and dissipated accumulated thermal energy, significantly reducing tool degradation. Furthermore, structurally securing the workpiece utilizing a tailstock support system effectively countered radial deflection, reducing dimensional deviation to a compliant +0.018 mm. Novelty The research establishes a direct, field-tested integration of fluid dynamics optimization and physical structural reinforcement for precision medical component manufacturing. Implications Combining targeted fluid applications with rigid structural support eliminates surface defects, preserves cutting tool integrity, and strictly conforms to stringent medical dimensional tolerances. Highlights: Low thermal conductivity concentrates cutting heat, accelerating tool degradation during automated shaping. Targeted emulsion fluid application effectively manages thermal accumulation and fragments continuous chips, eliminating surface scratches. Implementing structural workpiece supports counters radial deflection, reducing dimensional deviations well within the ±0.04 mm quality threshold. Keywords: Implant Fabrication, Cutting Tool Degradation, Radial Deflection, Coolant Optimization, Surface Roughness
Improvement Of Proximity Sensor-Based Interlock System On Butterfly Valve And Danfoss Vlt Vfd Inverter To Prevent Screw Pump From Operating With The Valve Closed: Improvement sistem interlock berbasis sensor proximity pada valve butterfly dan inverter vfd danfoss vlt untuk mencegah screw pump beroperasi pada kondisi valve tertutup Septian Putra Arifin; Syamsuduhha Syahrorini
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.3153

Abstract

General Background Industrial piping networks utilize three-phase induction drives and isolation devices to ensure continuous and controlled fluid transfer. Specific Background Running a fluid transfer system against a closed discharge path generates trapped kinetic energy, rapidly increasing internal casing temperatures. Knowledge Gap Relying exclusively on manual observation for rotational valve positions frequently fails, causing severe mechanical failures and demanding automated, low-cost preventive solutions directly integrated into the drive control. Aims This study implements an automated inductive safety mechanism designed to block operation when the discharge path is obstructed. Results By mounting a metallic target and an inductive non-contact detector on the rotational handle, the mechanism reads the isolation device's physical orientation. This detection state is routed through a 24VDC relay directly to the variable frequency drive's push-button control line. Functional testing across three scenarios confirmed the drive was completely blocked during closed and half-open states, successfully preventing fluid entrapment and extreme heating. Novelty This system directly hardware-links an external mechanical position to a variable frequency drive's run-enable logic without requiring complex programmable controllers. Implications Deploying this straightforward, low-cost automated barrier successfully prevents severe component degradation, reduces downtime associated with human error, and secures continuous industrial workflows. Highlights: Running a fluid transfer system against a closed discharge path generates trapped kinetic energy, causing severe casing overheating. An inductive detector combined with a 24VDC relay intercepts the push-button signal to block the frequency drive. Hardware-linking mechanical isolation status directly to drive logic prevents extreme heating and component degradation. Keywords: Inductive Detector, Dead Head Prevention, Variable Frequency Drive, Preventive Maintenance, Mechanical Isolation
Application of Thermal Overload Relay for Hydraulic Drive Motor Protection on Hobbing Machine at PT Tjokro Putra Perkasa: Penggunaan Thermal Overload Relay untuk Pengamanan Motor Dinamo Hidraulis pada Mesin Hobbing di PT Tjokro Putra Perkasa Rahmad Yanuar Arianto; Dwi Hadidjaja Rasjid Saputra
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.3155

Abstract

General Background Continuous industrial operations demand reliable machinery equipped with secured electrical drivers. Specific Background Three-phase motors powering fluid systems in gear fabrication machines face abnormal conditions, particularly sustained excessive currents and phase failures that elevate coil temperatures. Knowledge Gap Despite widespread availability, practical diagnostic workflows and precise resetting protocols for these safety devices within active operational environments require systematic documentation to prevent recurring degradation. Aims This study investigates the application, inspection sequence, and maintenance procedures of bimetallic safety mechanisms on industrial equipment. Results Qualitative observation demonstrates that these mechanisms accurately detect sustained currents, signaling the control circuit to disconnect the primary contactor. Field practices establish that resetting the mechanism must strictly follow a comprehensive mechanical and electrical diagnosis, such as verifying pump resistance and phase balance, rather than merely executing an immediate manual reset. Novelty The research explicitly maps theoretical inverse-time trip characteristics to practical troubleshooting workflows on active gear cutting machinery. Implications Adjusting parameters according to nameplate specifications and enforcing rigorous pre-reset inspections guarantees reliable operation, mitigates overheating risks, and prevents production disruptions. Highlights: Bimetallic components detect sustained excessive currents and trigger control circuits to disconnect the primary contactor. Executing comprehensive diagnostic checks on pump resistance and phase balance is mandatory before resetting devices. Adjusting trip parameters based on nameplate specifications prevents severe overheating and secures continuous industrial production. Keywords: Overload Relay, Hydraulic Motor, Gear Fabrication, Preventive Maintenance, Inverse Time Trip