cover
Contact Name
Unang arifin
Contact Email
bcsme@unisba.ac.id
Phone
+6282120524105
Journal Mail Official
bcsme@unisba.ac.id
Editorial Address
UPT Publikasi Ilmiah, Universitas Islam Bandung. Jl. Tamansari No. 20, Bandung 40116, Indonesia, Tlp +62 22 420 3368, +62 22 426 3895 ext. 6891
Location
Kota bandung,
Jawa barat
INDONESIA
Bandung Conference Series: Mining Engineering
ISSN : -     EISSN : 28282140     DOI : https://doi.org/10.29313/bcsme.v2i2
Bandung Conference Series: Mining Engineering (BCSME) menerbitkan artikel penelitian akademik tentang kajian teoritis dan terapan serta berfokus pada Teknik Pertambangan dengan ruang lingkup Analisis sensitivitas Net Present Value (NPV), Anggaran Biaya Crushing Plant, API 5L Grade B, Belt Conveyor, BESR II, Crude Oil, Crushing plant, Dimensi Paritan, Discounted Cash Flow (DCF), Dump Truck, Economic SR, Efisiensi Kerja Cassiterite, Gas, Korosi, Hopper, Internal Rate of Return (IRR), Kapasitas Sump Jalan Angkut, Lifetime Biaya Produksi, Loosematerials, Payback Periode (PBP), Pemompaan, Peringkat Batubara, Pipa Baja Karbon, Crude Oil, Pipa Baja, Pipa Transportasi, Pit Design BWE, Productin Rate Index Crushing Plant, Produktivitas Debit Air, Rencana Reklamasi, Roller, Sisa Umur Pakai Pipa Baja Karbon, Sisa Umur Pakai Pipa Reflektan Vitrinit, Sisa Umur Pakai, Sistem Dewatering, Target Ban, KPH, TUR, Variable Crushing Plan. Prosiding ini diterbitkan oleh UPT Publikasi Unisba. Artikel yang dikirimkan ke prosiding ini akan diproses secara online dan menggunakan double blind review minimal oleh dua orang mitra bebestari.
Articles 1 Documents
Search results for , issue "169 - 176" : 1 Documents clear
Rancangan Sistem Penyaliran Tambang Sirtu PT. Bukit Tampomas Lestari, Kecamatan Paseh, Kabupaten Sumedang, Provinsi Jawa Barat Muhammad Reinald Raihan; Yunus Ashari; Noor Fauzi Isniarno
Bandung Conference Series: Mining Engineering 169 - 176
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract. Open-pit sand and gravel mining operations are vulnerable to water accumulation from rainfall and surface runoff, which can disrupt mining activities. Therefore, an effective mine drainage system is required. This study aims to determine rainfall intensity, catchment area, runoff discharge, and to design drainage ditches and a settling pond. The research applies the E.J. Gumbel frequency distribution, Mononobe, and Rational methods to analyze rainfall and runoff. The study uses rainfall data from 2015–2024, topographic maps, land cover maps, and slope gradient maps.The results show rainfall intensities of 29.7 mm/hour for the catchment area outside the Mining Business License (IUP) and 27.7 mm/hour inside the IUP, with a design rainfall of 19.968 mm. The outside catchment covers 5.62 ha with a runoff discharge of 1,076 m³/hour, while the inside catchment covers 4.94 ha with a runoff discharge of 817 m³/hour. The proposed drainage system consists of seven ditch segments and a rectangular settling pond measuring 37.43 m × 24.95 m × 5 m, with a volume of 4,670 m³. The recommended dredging interval is 7.9 months.   Abstrak. Penambangan sirtu dengan metode tambang terbuka memiliki potensi terjadinya genangan dikarenakan air hujan dan air limpasan yang masuk ke area penambangan. Kondisi ini dapat mengganggu kegiatan penambangan. Oleh karena itu, diperlukan perancangan sistem penyaliran tambang yang secara efektif. Penelitian ini bertujuan untuk menentukan intensitas curah hujan, luas daerah tangkapan hujan, debit air limpasan, merancang paritan, dan kolam pengendapan. Metode penelitian yang digunakan yaitu analisis distribusi frekuensi E.J. Gumbel, metode Mononobe, metode Rasional, perancangan paritan dan kolam pengendapan. Data yang digunakan berupa data curah hujan periode 2015 – 2024, peta topografi, peta tutupan lahan, dan peta kemiringan lereng. Hasil penelitian menunjukan intensitas curah huan sebesar 29,7 mm/jam pada catchment area luar IUP dan 27,7 mm/jam pada catchment area dalam IUP dengan curah hujan rencana sebesar 19,968 mm. Luas catchment area luar IUP sebesar 5,62 ha dengan debit limpasan 1.076 m3/jam, sedangkan catchment area dalam IUP sebesar 4,94 ha dengan debit limpasan 817 m3/jam. Sistem penyaliran yang dirancang terdiri dari tujuh segmen paritan dan kolam pengendapan dengn bentuk persegi panjang dengan dimensi 37,43 m x 24,95 m x 5 m dengan volume 4.670 m3. Hasil analisis interval pengerukan setiap 7,9 bulan.  

Page 1 of 1 | Total Record : 1