cover
Contact Name
Sugeng Santoso
Contact Email
sugeng.santoso@mercubuana.ac.id
Phone
+6282132044774
Journal Mail Official
ti.jurnal@umm.ac.id
Editorial Address
Departement Industrial Engineering University of Muhammadiyah Malang Jl. Tlogomas No 246 Malang
Location
Kota malang,
Jawa timur
INDONESIA
Jurnal Teknik Industri
ISSN : 19781431     EISSN : 25274112     DOI : -
Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality Function Deployment is a tool which design some needs include customers represented as a voice of customer and including some competitions and also groups some activities that usually called affinity graphic ang getting a benchmarking for it is competition. From the result analysis can be showed that main attribute for patience is a accuracy. And from House Of Quality can be found that getting a periodic meeting to evaluate this hospital and also increase a service can be made 20 concept
Articles 21 Documents
Search results for , issue "Vol. 10 No. 2 (2009): Agustus" : 21 Documents clear
Analisis Kelayakan Investasi Penggunaan Teknologi Crude Oil System di Departemen Power Plant Pt Newmont Nusa Tenggara Vitri Pitrandjalisari
Jurnal Teknik Industri Vol. 10 No. 2 (2009): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (288.044 KB) | DOI: 10.22219/JTIUMM.Vol10.No2.109-113

Abstract

The study is to discuss application of crude oil system to process used oils generated from PTNNT’s power plant in order to optimize transportation cost from power plant to landfillarea. This study analyzes whether the system is in compliance with technology and financial aspects of plant environment. Data required to solve the problems that may occur i.e. price ofthe equipment to implement crude oil system, operational and installation costs, equipment durability, waste management data, act or government regulation concerning waste management. Based on technic aspect, PTNNT has minimize the quantity of its hazardous and toxic wastes, reduce cost to dispose hazardous and toxic wastes, minimize spill risks, and minimize risk in using main fuel; and financial aspect, by using several methodes: Pay Back Periode, Net Present Value, Profatibility Index, and Internal Rate of Return PT NNT has obtained the result which is the implementation of crude oil system in PTNNT’s power plant is feasible.
Daktilitas dan Beban Lentur Dinding Panel Semen Eceng Gondok (Emen Wall) Lukito Prasetyo
Jurnal Teknik Industri Vol. 10 No. 2 (2009): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol10.No2.%p

Abstract

It is a follow-up research to discover water hyancinth wall panel building material characteristic (emen wall). Previous study found this material fulfilled the standard of PUBI 1982, SNI 03-6861.1-2002, and ASTM C423-90a in physically, mechanically, acoustically, and burning endurance. Furthermore, the material will be evaluated through flexure test. Object test, which is a block board in 56X35X7 cm, will be burdened in interval of 100 kg until collapes. Then, deflection will be recorded based on the effective burden. This examination will emerge average devition ductility factors in amount of 15.04 and average flexure ductility in amount of 17.10. Refers to Park and Pauly (1975) water hyacinth wall panel (emen wall) collapsing type is ductile.
Integrasi Model Lean Sigma untuk Peningkatan Kualitas Produk Pregiwati Pusporini; Deny Andesta
Jurnal Teknik Industri Vol. 10 No. 2 (2009): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (333.859 KB) | DOI: 10.22219/JTIUMM.Vol10.No2.91-97

Abstract

In order to develop business, the company has problems associated with waste. This research focuses on the incorporation of the concept of lean thinking and six sigma concept which is lean six sigma to improve quality. Lean six sigma tools which used in this study is Big Picture Mapping, Pareto Chart, Root Cause Analysis, Fishbone Diagram, and Failure Mode and Effect Analysis. Tools used above will support the improve stage to determine the priority of reprair. From the results found that 3 critically waste were defect, overproduction and inventory. Improve stage focus on the most critical waste issue is defect, primary process improvement method of paint, the process sequence and pre assy plug gage to measure eye reaming process. Waste overproduction and inventory focused on the Master Production Schedule (MPS). These improvements were expected to resolve issues relating to the elimination of defects, overproduction and inventory.
Koordinasi Supply Chain Satu Pabrik-Satu Distributor pada Model Penentuan Harga dan Keputusan Produksi Evi Yuliawati
Jurnal Teknik Industri Vol. 10 No. 2 (2009): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (329.597 KB) | DOI: 10.22219/JTIUMM.Vol10.No2.114-119

Abstract

Competition and global market induce enterprises to meet their customer needs on product/ service in considerably cheap price, in acceptable quality and within short lead time. This leads to the fact that coordination in a supply chain is extremely important. This research compare an one manufacturer-one distributor supply chain coordination scenarios in a model joint pricing and production/order decisions. Model joint pricing and production/order decisions is based on Non Linear Programming with objective function to maximize its supply chain profit.Pricing scheme is initiated when the manufacturer determines its selling price. A supply chain coordination scenario and supply chain without coordination scenario will compare in this research. Experiment by employing a set of numerical example is performed to evaluate the model performance. Moreover, sensitivity analysis is done to explore the effect of capacity’s and price to demand sensitivity-parameter’s changes to the objective function of proposed model.
Pemberian Insentif Kepada Grup Karyawan Berdasarkan Kompetensi Spencer Yustina Ngatilah
Jurnal Teknik Industri Vol. 10 No. 2 (2009): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol10.No2.%p

Abstract

Knowing that success in the implementation of the strategy implemented by management to achieve the vision and mission that has been established, it would require an appropriate measure of performance using a design with two Spencer competence perspectives measurement comprehensibly and integrated that is in each criterion is expected to concretely describe the performance of the company and can be used as a measure of judgment in the provision of incentives. This study aims to support the decision to give incentives to the grup of employees with competency-based Spencer and Analytic Hierarchy Process as a weighting in the decision-making strategy to improve company performance. Based on the results of performance measurement in companies using the Sakti PT.Biru Spencer and Analytical Hierarchy Process can be concluded that the employee grup A has a value of 3.516 of performance achievement., grup B has a value of employee performance achievements 3.059, grup C has a value of employee performance achievements 3.138, grup D employee has a value of 3.57 and the achievement of performance grup E employees have a value of 3.563 of performance achievement. The results of measurements of the performance of each grup of employees by using the method of Spencer and AHP, are known to facilitate the performance of each grup and the management in providing the right incentives, the amount of incentives that should be given to each work grup performance based on achievement during the first 3 months in 2009, where employee grup B the highest incentives of Rp 6,153,907, -, grup D employees of Rp 6,113,469, -, grup of employees amounting to Rp 5,845,617 A, grup C of Rp 3,669,158 employees and employees of grup B of Rp 3,217, 850 
Perilaku Disfungsional dalam Pengukuran Kinerja Perusahaan Patdono Suwignjo
Jurnal Teknik Industri Vol. 10 No. 2 (2009): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol10.No2.%p

Abstract

Performance measurement system is a critical component of a management system. Unfortunately, the success rate of performance measurement system implementation is relatively low. Even from the implementation categorized as success, only few of them are effective. Dysfunctional behavior is one of the factors that makes the implementaion of a performance measurement system is ineffective. This paper tries to elaborate the dysfunctional behavior of employees in performance measurement system implementation. Three examples of dysfunctional behavior cases are presented. Finally, the paper tries to propose some methods for reducingdysfunctional behavior. The three cases show that the alignment of incentive system to performance (performance related pay scheme) and the fear of unable to meet performance target have driven employees to behave dysfunctionally. The cases also show that gaming and biasing are two forms of dysfunctional behaviour practiced by employees. To reduce dysfunctional behavior the paper proposes three methods, namely: reducing the proportion of incentives tied up to performance, implementing the appropriate KPIs, and utilizing counter measures..
Quality Of Service pada Jaringan Multi Protocol Label Switching M Irfan; Lailis Syafa'ah
Jurnal Teknik Industri Vol. 10 No. 2 (2009): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol10.No2.%p

Abstract

MPLS is a work plan that was given by IETF to repair work performance of IP network. Label switching label using forwarding mechanism which has connection oriented characteristic make this technology become routing technology for future guarantec QoS with better service level. This is supporting using a protocol signals for TE-MPLS to maximize network performance balancing the network stressing with distribution that fixed on classes, queuing, and traffic schedule. This research is an analysis of TE-MPLS mechanism to design MPLS network with RSVP-TE daemon that is called emulator MPLS. This analysis used generating 2 different kinds of protocol traffic, UDP, and TCP. The measurement could be concluded that there was an efficience of MPLS network in group joint of protocol UDP network about 18,6 % for channel that is similar with traffic 2 KBRS, 3,4 %, 1,5 %, and 5,6 % for channel similar with traffic 4,8 and 16 KBRS for flow variation of MPLS network data increase 464,2 %, 479,5 %, 518 %, and 2638,5 % for each channel. The time that was needed for TCP protocol transmition of MPLS network showed efficiency 2,9 % and bit rate of MPLS increase about 0,66 %.
Value Engineering dalam Pembangunan Rusunawa Nyoman Dita Pahang Putra; M Mudjahidin
Jurnal Teknik Industri Vol. 10 No. 2 (2009): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1324.15 KB) | DOI: 10.22219/JTIUMM.Vol10.No2.173-179

Abstract

Value engineering is done to make an effort to organize systematically and applying a technique that identifies the product function that aims to meet the required function with the lowest price. Analytical Hierarchy Process method is used in the analysis phase of work plan to choices alternative that is more objective based on several variables. In the chart of the breakdown cost model, 7 items of work have the highest cost, based on the work items was found 2 items of work that have the potential to do great engineering work that is the value of the walls and ceiling. The application of the results of value engineering on the walls, recommended the bricks, concrete stiffeners, stucco 1:4, paint walls, ceramic that savings of Rp 92,578,941 or 13.6% of the total cost of initial construction. In the same way, for the ceiling work that is recommended to change the calsiboard hollow iron frame with GRC framework furing metal so that savings of Rp40, 499,036 or 17.3% and ceiling aluminum grill on the bathroom with the calsiboard furing metal frame so that savings of Rp20,226,477 or 40%. Total savings that occur: Rp7,036,167,661 — Rp6,882,863,207 = Rp153,304,454 or 1.95% of total construction cost.
Daktilitas Dinding Panel Semen Eceng Gondok (Emen Wall) Lukito Prasetyo
Jurnal Teknik Industri Vol. 10 No. 2 (2009): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol10.No2.%p

Abstract

This study is a follow-up study to investigate the characteristics of building materials in the form of a wall panel hyacinth (Emen wall). From previous studies, physical properties, mechanical, acoustic and fuel resistance of this material meets the standards of building materials PUBI and ISO 1982 and ASTM C423 03-6861.1-2002-90A. Furthermore, this material will be evaluated by bending test. Beam specimens with dimensions of board 56x35x7cm, will be saddled with the interval until the collapse 100kg. Then note the deflection that occurs based on the work load. From this examination, obtained an average deviation of the ductility factor of 15.04 and the average curvature ductility is 17.10. the kind of collapse of a wall panel material hyacinth (Emen wall) is to be ductile.
Quality of Service pada Jaringan Multi Protocol Label Switching M. Irfan; Lailis Syafa'ah
Jurnal Teknik Industri Vol. 10 No. 2 (2009): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol10.No2.%p

Abstract

MPLS is a work plan that was given by IETF to repair work performance of IP network. Label switching label using forwarding mechanism which has connection oriented characteristic make this technology become routing technology for future guarantec QoS with better service level. This is supporting using a protocol signals for TE-MPLS to maximize network performance balancing the network stressing with distribution that fixed on classes, queuing, and traffic schedule. This research is an analysis of TE-MPLS mechanism to design MPLS network with RSVP-TE daemon that is called emulator MPLS. This analysis used generating 2 different kinds of protocol traffic, UDP, and TCP. The measurement could be concluded that there was an efficiency of MPLS network in group joint of protocol UDP network about 18,6% for channel that is similar with traffic 2 KBRS, 3,4%, 1,5%, and 5,6% for channel similar with traffic 4,8 and 16 KBRS for flow variation of MPLS network data increase 464,2%, 479,5%, 518%, and 2638,5% for each channel. The time that was needed for TCP protocol transmition of MPLS network showed efficiency 2,9% and bit rate of MPLS increase about 0,66%.

Page 2 of 3 | Total Record : 21


Filter by Year

2009 2009


Filter By Issues
All Issue Vol. 25 No. 2 (2024): August Vol. 25 No. 1 (2024): February Vol. 24 No. 2 (2023): August Vol. 24 No. 1 (2023): February Vol. 23 No. 2 (2022): August Vol. 23 No. 1 (2022): February Vol. 22 No. 2 (2021): August Vol. 22 No. 1 (2021): February Vol. 21 No. 2 (2020): August Vol. 21 No. 1 (2020): February Vol 21, No 1 (2020): February Vol 20, No 2 (2019): August Vol. 20 No. 2 (2019): August Vol 20, No 1 (2019): February Vol. 20 No. 1 (2019): February Vol. 19 No. 2 (2018): Agustus Vol 19, No 2 (2018): Agustus Vol 19, No 1 (2018): Februari Vol. 19 No. 1 (2018): Februari Vol 18, No 2 (2017): Agustus Vol. 18 No. 2 (2017): Agustus Vol. 18 No. 1 (2017): Februari Vol 18, No 1 (2017): Februari Vol 17, No 2 (2016): Agustus Vol. 17 No. 2 (2016): Agustus Vol. 17 No. 1 (2016): Februari Vol 17, No 1 (2016): Februari Vol. 16 No. 2 (2015): Agustus Vol 16, No 2 (2015): Agustus Vol. 16 No. 1 (2015): Februari Vol 16, No 1 (2015): Februari Vol 15, No 2 (2014): Agustus Vol. 15 No. 2 (2014): Agustus Vol. 15 No. 1 (2014): Februari Vol 15, No 1 (2014): Februari Vol. 14 No. 2 (2013): Agustus Vol 14, No 2 (2013): Agustus Vol. 13 No. 2 (2012): Agustus Vol 13, No 2 (2012): Agustus Vol 13, No 1 (2012): Februari Vol. 13 No. 1 (2012): Februari Vol. 12 No. 2 (2011): Agustus Vol 12, No 2 (2011): Agustus Vol. 12 No. 1 (2011): Februari Vol 12, No 1 (2011): Februari Vol. 11 No. 2 (2010): Agustus Vol 11, No 2 (2010): Agustus Vol 11, No 1 (2010): Februari Vol. 11 No. 1 (2010): Februari Vol. 10 No. 2 (2009): Agustus Vol 10, No 2 (2009): Agustus Vol. 10 No. 1 (2009): Februari Vol 10, No 1 (2009): Februari Vol. 9 No. 2 (2008): Agustus Vol 9, No 2 (2008): Agustus Vol 9, No 1 (2008): Februari Vol. 9 No. 1 (2008): Februari Vol 8, No 2 (2007): Agustus Vol. 8 No. 2 (2007): Agustus Vol. 8 No. 1 (2007): Februari Vol 8, No 1 (2007): Februari Vol 4, No 2 (2003) Vol. 4 No. 2 (2003) Vol 3, No 2 (2002) Vol. 3 No. 2 (2002) Vol 3, No 1 (2002) Vol. 3 No. 1 (2002) Vol. 2 No. 2 (2001) Vol 2, No 2 (2001) Vol 2, No 1 (2001) Vol. 2 No. 1 (2001) Vol. 1 No. 2 (2000) Vol 1, No 2 (2000) Vol 1, No 1 (2000) Vol. 1 No. 1 (2000) More Issue