cover
Contact Name
Sugeng Santoso
Contact Email
sugeng.santoso@mercubuana.ac.id
Phone
+6282132044774
Journal Mail Official
ti.jurnal@umm.ac.id
Editorial Address
Departement Industrial Engineering University of Muhammadiyah Malang Jl. Tlogomas No 246 Malang
Location
Kota malang,
Jawa timur
INDONESIA
Jurnal Teknik Industri
ISSN : 19781431     EISSN : 25274112     DOI : -
Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality Function Deployment is a tool which design some needs include customers represented as a voice of customer and including some competitions and also groups some activities that usually called affinity graphic ang getting a benchmarking for it is competition. From the result analysis can be showed that main attribute for patience is a accuracy. And from House Of Quality can be found that getting a periodic meeting to evaluate this hospital and also increase a service can be made 20 concept
Articles 9 Documents
Search results for , issue "Vol. 3 No. 1 (2002)" : 9 Documents clear
Analisis Kelayakan Pendirian Unit Produksi di Universitas (Studi Kasus Industri Minyak Atsiri) Ahmad Mubin
Jurnal Teknik Industri Vol. 3 No. 1 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol3.No1.12-21

Abstract

The establishment of production unit requires fairly high investment, therefore to avoid the investment connducted which in fact will be unprofitable in the future, before implementing such investment, the comprehensive analysis or feasibility study is required, concerning marketing, technical financial management, and social-economyn alysis.From the result of feasibilitiy studythe level of feasibility for the establishment of production or business units is determined. In this case study, the subject of study is production of essential oil that serves as raw material for food, pharmacy, and parfume manufactures. Based on the analysis result of market and marketing aspects, as well as technical and Technology aspects, it was  ndicated that the proposal of production unitestablishment feasible to beaccepted. Likewise, the result of financial analysis with the methods of Net present value, Profitability Index(B /C ratio), Internal Rate of Return and payback period,indicated that the proposal of production unitestablishmeint is feasibleto be accepted.
Analisa Alogaritma Layout Heuristik untuk Meminimasi Total Material handling dalam Perencanaan Tata Letak Fasilitas Annisa Kesy Garside
Jurnal Teknik Industri Vol. 3 No. 1 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol3.No1.22-32

Abstract

This research has goal to compare there alternative layout performances CRAFT,MULTIPLE, and BLOCPLAN. Using the problem of layout which include forward flow material and fordward backward flow material can be found result : Multiple Algoritm has total distance and material cost minimally but the problems that have lower departement,CRAFT algoritm can be used better than MULTIPLE algoritm because almost gives the same result with easier input process.
Pengoptimalan Tingkat Persediaan Bahan Baku Fire Tube Boiler dengan analisis Markov Chain Murti Astuti; Nuril Latifah
Jurnal Teknik Industri Vol. 3 No. 1 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol3.No1.44-54

Abstract

Controlling material stock becomes important problem that faced by the company because controlling it supports production process continually. In applaying material is efforted in order getting cost of supplier more law as possible. PT. Indomarine is one kind of company that produces tube involving two type are fire tube and water tube, in which the primary material is tube and plat. In dealing the consumen needs, the company should give amount materials so that the production will be continually, and the consumer will satisfy. Having more suplies like that is caused by accepting fluctually needs, than causes less supplier optimumly and less in cost too. Based on fenomenon above, so in this research will mucstigate the methods that will be counted the number of material asking.
Model Transshipment Guna Menghasilkan Biaya Pendistribusian yang Minimum Melalui Kajian Teoritis Ayudina Puji Estrimaz; Mirna Widayanti
Jurnal Teknik Industri Vol. 3 No. 1 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol3.No1.75-84

Abstract

PR. KaryaT imur, Malang is an lndustrial Cigarettes which be productive cigarette with Harmonis brand for East Java marketing area, Horizon Super Filter and Horizon Mild Filter for marketing area beyond Java. This research only analized for east java marketing area. This company make use of two (2) source to meet every marketing area needs which is allocated directly through those two source on condition that each sources allocated in accordance with request for every marketing area. It is surely needsa lot of cost, because each sources still had to supply for every marketing area. This research on it's own was submitted to examine a better distribution system so it can minimize cost of distribution.
Perencanaan Keseimbangan Lintasan Untuk Meningkatkan Efisiensi Kerja Dengan Menggunakan Metode RPW Teguh Baroto; Wahyu Eni Maryati
Jurnal Teknik Industri Vol. 3 No. 1 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol3.No1.66-74

Abstract

This rescarch aims to orange a balance production line 10 improve work efficiency to rice production output. This line balancing planning, we use Rank Position Weight ( RPW ). Using operation time data in every work station and also precedence diagram based on the shoes making process could be found elements/operation group involving a work station. With 3 cycles time such as 100,150 ang 160 seconds could be found a cycle time 150 seconds result minimum operation grouping of balance delay. From this planning could be concluded that there were 10 work stations with production output 168 part of shoes of day.
Analisis Keandalan Pada Komponen Mesin Pencetak Koran Webb Offset Dyah Retno Purwatiningsih; Haris F
Jurnal Teknik Industri Vol. 3 No. 1 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol3.No1.33-43

Abstract

PT. Temprina Media Grafika is one of Jawa Pos Group Company that print newspaper and magazine. To decline when they have to buy machine component of newspaper printer which very needed can be found with measuring component reliability to keep maintaining. Based on Kolmogorov - Smirnov test can be found each component's distribution to find variables which used to count reliability function.
Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan Eti Kristinawati
Jurnal Teknik Industri Vol. 3 No. 1 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol3.No1.55-65

Abstract

To complete customer's demand so company must make a plan with using production schedule. Some diffrculties usually happen in shop floor level is a new job which is put in a production schedule that have arranged before. So that the old production schedule have to revised by reschedulling. The procedure that be used to schedule the real time production consist of n job m machine is algoritm of Hueristik Dispatching Rule Shorted Processing Time (SPT) method to minimize mean tardiness and makespan.
Peningkatan Pelayanan di Poli Kebidanan dan Kandungan RSUD Saiful Anwar dengan Menggunakan Simulasi Antrian Ilyas Mas'udin
Jurnal Teknik Industri Vol. 3 No. 1 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol3.No1.85-92

Abstract

This research have aim to reduce waiting time of patient in pregnant division at RSUD Saiful Anwar Malang. First step, collecting the time between arrival data and service time data at each division. These data were tested using Kolmogorov-Smirnov to find a kind of distribution and the parameter of the data. Them making service system design based on the initial condition using ARENA and run to find the mean of waiting time from the beginning design, using trial and error then tried some new altematives design to minimize waiting time.
Pengembangan Basis Data Untuk Mengelola Komponen Perkakas Bantu Perakitan S Suwarsono
Jurnal Teknik Industri Vol. 3 No. 1 (2002)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol3.No1.1-11

Abstract

Welding assembly jig company's activities are classified as job-order. Their products (jigs & fixtures) were depending on type of product, which was assembled. There are loot-of variations of product designs, process planning, tools, shop-floor control etc. to handling all customer order. One of the solutions is standardization product, to reduce product variation and the control problems.

Page 1 of 1 | Total Record : 9


Filter by Year

2002 2002


Filter By Issues
All Issue Vol. 25 No. 2 (2024): August Vol. 25 No. 1 (2024): February Vol. 24 No. 2 (2023): August Vol. 24 No. 1 (2023): February Vol. 23 No. 2 (2022): August Vol. 23 No. 1 (2022): February Vol. 22 No. 2 (2021): August Vol. 22 No. 1 (2021): February Vol. 21 No. 2 (2020): August Vol. 21 No. 1 (2020): February Vol 21, No 1 (2020): February Vol 20, No 2 (2019): August Vol. 20 No. 2 (2019): August Vol. 20 No. 1 (2019): February Vol 20, No 1 (2019): February Vol 19, No 2 (2018): Agustus Vol. 19 No. 2 (2018): Agustus Vol. 19 No. 1 (2018): Februari Vol 19, No 1 (2018): Februari Vol 18, No 2 (2017): Agustus Vol. 18 No. 2 (2017): Agustus Vol. 18 No. 1 (2017): Februari Vol 18, No 1 (2017): Februari Vol. 17 No. 2 (2016): Agustus Vol 17, No 2 (2016): Agustus Vol. 17 No. 1 (2016): Februari Vol 17, No 1 (2016): Februari Vol 16, No 2 (2015): Agustus Vol. 16 No. 2 (2015): Agustus Vol. 16 No. 1 (2015): Februari Vol 16, No 1 (2015): Februari Vol 15, No 2 (2014): Agustus Vol. 15 No. 2 (2014): Agustus Vol 15, No 1 (2014): Februari Vol. 15 No. 1 (2014): Februari Vol. 14 No. 2 (2013): Agustus Vol 14, No 2 (2013): Agustus Vol. 13 No. 2 (2012): Agustus Vol 13, No 2 (2012): Agustus Vol 13, No 1 (2012): Februari Vol. 13 No. 1 (2012): Februari Vol 12, No 2 (2011): Agustus Vol. 12 No. 2 (2011): Agustus Vol 12, No 1 (2011): Februari Vol. 12 No. 1 (2011): Februari Vol 11, No 2 (2010): Agustus Vol. 11 No. 2 (2010): Agustus Vol. 11 No. 1 (2010): Februari Vol 11, No 1 (2010): Februari Vol 10, No 2 (2009): Agustus Vol. 10 No. 2 (2009): Agustus Vol 10, No 1 (2009): Februari Vol. 10 No. 1 (2009): Februari Vol 9, No 2 (2008): Agustus Vol. 9 No. 2 (2008): Agustus Vol 9, No 1 (2008): Februari Vol. 9 No. 1 (2008): Februari Vol. 8 No. 2 (2007): Agustus Vol 8, No 2 (2007): Agustus Vol. 8 No. 1 (2007): Februari Vol 8, No 1 (2007): Februari Vol. 4 No. 2 (2003) Vol 4, No 2 (2003) Vol 3, No 2 (2002) Vol. 3 No. 2 (2002) Vol. 3 No. 1 (2002) Vol 3, No 1 (2002) Vol 2, No 2 (2001) Vol. 2 No. 2 (2001) Vol 2, No 1 (2001) Vol. 2 No. 1 (2001) Vol 1, No 2 (2000) Vol. 1 No. 2 (2000) Vol 1, No 1 (2000) Vol. 1 No. 1 (2000) More Issue