cover
Contact Name
Sugeng Santoso
Contact Email
sugeng.santoso@mercubuana.ac.id
Phone
+6282132044774
Journal Mail Official
ti.jurnal@umm.ac.id
Editorial Address
Departement Industrial Engineering University of Muhammadiyah Malang Jl. Tlogomas No 246 Malang
Location
Kota malang,
Jawa timur
INDONESIA
Jurnal Teknik Industri
ISSN : 19781431     EISSN : 25274112     DOI : -
Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality Function Deployment is a tool which design some needs include customers represented as a voice of customer and including some competitions and also groups some activities that usually called affinity graphic ang getting a benchmarking for it is competition. From the result analysis can be showed that main attribute for patience is a accuracy. And from House Of Quality can be found that getting a periodic meeting to evaluate this hospital and also increase a service can be made 20 concept
Articles 717 Documents
Penerapan Distribution Requirement Planning (DRP) pada Central Warehouse PT. Coca Cola Amatil Bottle Pandaan Garside, Annisa Kesy
Jurnal Teknik Industri Vol 2, No 1 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (4526.767 KB) | DOI: 10.22219/JTIUMM.Vol2.No1.47-58

Abstract

This research has a good to plan the product delivery schedule from central ware house to each ware house and from ware house to PT. Coca Cola outlet to minimize the holding number of product. To plan this schedule we implement DRP (Distribution Requirement Planning) method. With using the product demand data, lead time of delivery, holding cost and release cost, also BOD (Bill of Distribution). Then analysis them using DRP software to find the shipping schedule. After implementing DRP method PT. Coca Cola can decrease about RP 7.205.761.500,00 for 8 week.
Penentuan Key Performance Indicator Dengan Metode Balanced Scorecard Rokhim, Muh
Jurnal Teknik Industri Vol 18, No 2 (2017): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (455.777 KB) | DOI: 10.22219/JTIUMM.Vol18.No2.168-175

Abstract

Balanced Score Card (BSC) is one of the management tools to manage the implementation of strategy, measure the performance beyond mere financials and to communicate the vision, strategy and performance to stakeholders. In this research, researcher will focus on cascading the Key Performance Indicator (KPI) with using the BSC methodology in the industrial Engineering Department at one of the tire manufacturing company located in Tangerang. This KPI will be a good tools to manage the performance of each engineers in the organization and to ensure align with the vision and strategy from the Top Management. Result of the KPI performance also will be an useful Performance Management tool for the Manager  in order to give the yearly appraisal for each engineers in avoiding of the subjective way likes currently happened.
Penentuan Gaji Pokok Manajer Menengah dengan Metode Point System Kurniawan, Dwi; Syihab, Arby; Setyo Rukmi, Hendang
Jurnal Teknik Industri Vol 13, No 1 (2012): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (211.406 KB) | DOI: 10.22219/JTIUMM.Vol13.No1.78-84

Abstract

One strategy to improve the satisfaction of human resources is to give fair compensation based on the characteristics of the their work. Today in PT Bita Enargon Engineering, all division managers are considered to have the same workload so that they get the same basic wage, even though the workload of each division is not exactly the same. This research will determine the base salary using the point system method. The first step of this method is to conduct a job evaluation to determine the job relative value of each position. The next step is to convert the job relative value to the money value by subsituting the job relative value into a regression equation developed from the result of a survey on the closest competitors. Based on the job relative value, the basic salary for division heads and department heads can be decided.
Multi-Agent Simulation in the Inter-Organizational Trust Model and Knowledge Sharing in the Automotive Industry Rizana, Afrin Fauzya; Ramadhan, Fadillah
Jurnal Teknik Industri Vol 20, No 2 (2019): August
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (337.031 KB) | DOI: 10.22219/JTIUMM.Vol20.No2.161-171

Abstract

Two organizations can share knowledge to determine the success of their collaboration. Effectiveness in sharing knowledge affect the organizational performance and trust between organizations. This study aims to identify the implementation of multi-agent simulations to increase confidence in sharing knowledge between organizations. A multi-agent simulation approach was used in this study. The research model was adopted from previous research. Several hypotheses and path coefficients had tested in simulation models. The results of this study showed that multi-agent simulation is suitable to be implemented as a problem-solving method for a complex problem such as knowledge sharing. Besides, this study found the role of individual factors such as likability and expertise on the success of sharing knowledge between organizations.
Aplikasi Konsep Understand, State, Evaluate, Plan, Do, Study, Action Handayani, Dwi Iryaning
Jurnal Teknik Industri Vol 8, No 2 (2007): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (218.253 KB) | DOI: 10.22219/JTIUMM.Vol8.No2.142-149

Abstract

Tiang pancang is the main product of PT Hume Sakti Indonesia. There were the error product of it,the company must be found the solution which can be used to increase quality of this product itself. The writer wanted to plain the improvement of product quality with using USE-PDS concept (Understand, State, Evaluate, Plan, Do, Study, Act) and FMEA analysis. After the writer have done this concept and FMEA got the result where the first DPMO for this company was 10853 per billion of chance with total of failure was 5.680.000 rupiahs. Than chose alternative which the writer can be recommended based on the FMEA table, where recommendation to choose this alternative based on the highest value. Based on FMEA table was gotten the highest priority was from the last production.
Perancangan Tata Letak Mesin Dengan Menggunakan Konsep Group Technology Sebagai Upaya Minimasi Jarak dan Biaya Material Handling Kristinawati, Eti
Jurnal Teknik Industri Vol 1, No 1 (2000)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2689.292 KB) | DOI: 10.22219/JTIUMM.Vol1.No1.71-79

Abstract

PT. Berlina  Tbk Pandaan  is a company that  produce  already use plastic product  package. Some of its  product  are Nivea  bottle,  Lux shower  bottle,  packaging  of sheats  and the other  form variation. The processing to make it, need at least twice a process  of machine. All those  product through  some  operation  which  happened  a  long  way  material  handling  from  one  machine  to another.  As main product  facility  is through  the  the  machine  layout  can  be seen that  machine placement  still arbitrarily, and  it will  cause  product  current  longer so that  cost and  distance  fo rmaterial  handling also bigger.To solve this  problem,  we  have to  study  a theory  group  technology.  Major  point  f this theory  is  machine  grouping  become  machine  cell also  product  grouping  become  part family  so that,  later,  each machine cell will  produce a certain  of part family according  certain  criteria.  With the computer program called gtlaypc.exe, part family and machine cell can be know and use it for planning a machine layout.The result of machine  layout  planning  using  group technology  is  total  distance  27853,5  m per day and 18978  m per day smaller from the earlier  exiting  machine  layout  so  that the cost of material  handling  plan  Rp. 35109,3  per day more smaller.  Planning  the machine  layout  with the group technology  can minimalize of cost and distance material  handling
Penjadwalan Produksi Dengan Algoritma Heuristik Pour (Studi Kasus: Konveksi One Way – Malang) Sulaksmi, Andri; Garside, Annisa Kesy; Hadziqah, Fithriany
Jurnal Teknik Industri Vol 15, No 1 (2014): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (282.336 KB) | DOI: 10.22219/JTIUMM.Vol15.No1.35-44

Abstract

“One Way Convection” is a garment company which produces many kinds of t-shirt based on the customer’s order. In order to fulfill the order, the company applies role of First-Come First-Serve for scheduling the order production sequence. This role is often disadvantageous for the order with short process time because if it is dispatched after the order with long process time, then it will take longer in queue and causes the completion time of all order to be longer. This research aims to schedule t-shirt’s sequence operation in “One Way Convection” company by using Pour heuristic algorithm so that completion time becomes shorter and order fulfillment can be accomplished on-time. The steps in this methodology consist of collecting data, calculating standard time and total process time according to the order, scheduling using initial method proposed by company, scheduling using Pour heuristic algorithm, and comparing makespan of both approaches. According to the Pour Heuristic method, saving is obtained in makespan as 8.09 hours or 19.25% compared with initial method proposed by company.
Tata Ruang Dan Penilaian Dampak Lingkungan Industri Di Bangkalan Pasca Pembangunan Jembatan Suramadu Berdasarkan Potensi Daerah Utami, Issa Dyah; Findiastuti, Weny; Kuswanto, Dwi; Singgih, Moses L.
Jurnal Teknik Industri Vol 11, No 2 (2010): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (495.394 KB) | DOI: 10.22219/JTIUMM.Vol11.No2.162-169

Abstract

The development of Suramadu Bridge that connects Java Island and Madura Island opens the opportunity for Bangkalan Regency to be one of Industrial Park at East Java Province. This could be realized if there are many investors who invest their capital and build their industry at the industrial Park. The Clustering analysis and Scoring Risk analysis are used in this research. The results of this study indicate that based on the industrial potential, Bangkalan region is divided into six regions. Region I is the most appropriate area to serve  industrial and commercial center. The study also build a Standardized  Information System as a guide for the investors to invest their capital. This contains information about Industry Spatial Planning and Clustering based on area potency of bangkalan Regency and Environmental Impact.
Analisis Kelayakan Pendirian Proyek Stasiun Radio Guna Mengetahui Profit Maksimum Santoso, Cukup
Jurnal Teknik Industri Vol 9, No 2 (2008): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (397.509 KB) | DOI: 10.22219/JTIUMM.Vol9.No2.128-136

Abstract

Elegibility study is research about could or not a invest project can do well and can give profit level which is suitable or can be use economically. To determine how competend or not the building a project that is seen from some of aspects which support the project building and this project can be success. The research object here was PT. Radio Mitra Suara Batu place in Wukir Number 4 Batu City. This company was active in information service which wish to conduct extention of business by building a new station with different format than other radio station there ever made by this company. Therefore, before company built a new radio station it must do some elegibility study first. In order to not have come too par unintentionally big investing capital for the project which due not profit. Aspect to be studied for example: First, market aspect which determine market segmentation and market plan. Second, technical and production aspect which determine project location, production capacity, needed facility, kind of technology that is use and project layout. Third, management aspect which determine organitation structure, job description, employee needed and work scheduling. Fourth, finance aspect which determine total invest, remains value, decrease value, earnings projection, incoming ang outgoing cash stream and Rate of Return value as standart of project elegibility. Fifth, industrial environmental aspect which determine which supplier one to be chose and how emulation industrially is similar. Sixth, economic, social and political aspect will be known impact from project building and way to overcome. Seventh, aspect of law will support legality of building of project from facet punish. To maximize earning using Linier Programming method. Sum up earnings with Linier Programming method is Rp6,222,420.00/day and Rp186,672,600.00/month and this value there are difference Rp2,400,00/month that is smaller than manual calculation.
Perencanaan Peningkatan Kualitas Jasa Pelayanan Perpustakaan Dengan Metode Rekayasa Nilai Purwatiningsih, Dyah Retno
Jurnal Teknik Industri Vol 1, No 2 (2000)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (3374.953 KB) | DOI: 10.22219/JTIUMM.Vol1.No2.91-101

Abstract

A quality of service in UPT. Centre Library Muhammadiyah University of Malang especially in user devision and human resources management division is one of most used division which is complaint by users and need to increase of quality to satisfy users. Value engineering is a method which solue this problem to increase the quality service with keeping the rule of customer satisfaction. Based on the analysis with implement value engineering can be found the initial value design about I and advised design about 1.045 in other hand the initial design performance give about 45,799 and advised design about 51,488. It means that there is an increasing 4.5 % of value and 12,421 % of performance.

Filter by Year

2000 2024


Filter By Issues
All Issue Vol. 25 No. 2 (2024): August Vol. 25 No. 1 (2024): February Vol. 24 No. 2 (2023): August Vol. 24 No. 1 (2023): February Vol. 23 No. 2 (2022): August Vol. 23 No. 1 (2022): February Vol. 22 No. 2 (2021): August Vol. 22 No. 1 (2021): February Vol. 21 No. 2 (2020): August Vol. 21 No. 1 (2020): February Vol 21, No 1 (2020): February Vol 20, No 2 (2019): August Vol. 20 No. 2 (2019): August Vol. 20 No. 1 (2019): February Vol 20, No 1 (2019): February Vol 19, No 2 (2018): Agustus Vol. 19 No. 2 (2018): Agustus Vol. 19 No. 1 (2018): Februari Vol 19, No 1 (2018): Februari Vol 18, No 2 (2017): Agustus Vol. 18 No. 2 (2017): Agustus Vol. 18 No. 1 (2017): Februari Vol 18, No 1 (2017): Februari Vol. 17 No. 2 (2016): Agustus Vol 17, No 2 (2016): Agustus Vol. 17 No. 1 (2016): Februari Vol 17, No 1 (2016): Februari Vol 16, No 2 (2015): Agustus Vol. 16 No. 2 (2015): Agustus Vol. 16 No. 1 (2015): Februari Vol 16, No 1 (2015): Februari Vol 15, No 2 (2014): Agustus Vol. 15 No. 2 (2014): Agustus Vol 15, No 1 (2014): Februari Vol. 15 No. 1 (2014): Februari Vol. 14 No. 2 (2013): Agustus Vol 14, No 2 (2013): Agustus Vol. 13 No. 2 (2012): Agustus Vol 13, No 2 (2012): Agustus Vol 13, No 1 (2012): Februari Vol. 13 No. 1 (2012): Februari Vol 12, No 2 (2011): Agustus Vol. 12 No. 2 (2011): Agustus Vol 12, No 1 (2011): Februari Vol. 12 No. 1 (2011): Februari Vol 11, No 2 (2010): Agustus Vol. 11 No. 2 (2010): Agustus Vol. 11 No. 1 (2010): Februari Vol 11, No 1 (2010): Februari Vol 10, No 2 (2009): Agustus Vol. 10 No. 2 (2009): Agustus Vol 10, No 1 (2009): Februari Vol. 10 No. 1 (2009): Februari Vol 9, No 2 (2008): Agustus Vol. 9 No. 2 (2008): Agustus Vol 9, No 1 (2008): Februari Vol. 9 No. 1 (2008): Februari Vol. 8 No. 2 (2007): Agustus Vol 8, No 2 (2007): Agustus Vol. 8 No. 1 (2007): Februari Vol 8, No 1 (2007): Februari Vol. 4 No. 2 (2003) Vol 4, No 2 (2003) Vol 3, No 2 (2002) Vol. 3 No. 2 (2002) Vol. 3 No. 1 (2002) Vol 3, No 1 (2002) Vol 2, No 2 (2001) Vol. 2 No. 2 (2001) Vol 2, No 1 (2001) Vol. 2 No. 1 (2001) Vol 1, No 2 (2000) Vol. 1 No. 2 (2000) Vol 1, No 1 (2000) Vol. 1 No. 1 (2000) More Issue