cover
Contact Name
Henriette D. Titaley
Contact Email
henriette.titaley@polnam.ac.id
Phone
+6282188099397
Journal Mail Official
henriette.titaley@polnam.ac.id
Editorial Address
Jl. Ir. M. Putuhena, Wailela-Rumah Tiga, Kota Ambon Provinsi Maluku
Location
Kota ambon,
Maluku
INDONESIA
Jurnal Agregate
ISSN : -     EISSN : 29645158     DOI : https://doi.org/10.31959/ja.v2i1
Core Subject : Engineering,
Jurnal Agregate adalah Jurnal yang memberikan informasi ilmiah tentang perkembangan ilmu pengetahuan dan teknologi bidang Struktur, Bahan Bangunan Dan Kegempaan, Teknik Sumber Daya Air, Transportasi, Management Konstruksi, Geoteknikal, Teknik Pantai Dan Tsunami.
Articles 139 Documents
ANALISIS EARNED VALUE TERHADAP BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN RUANG KELAS BARU MADRASAH TSNAWIYAH NEGERI 6 MALUKU TENGAH Walalayo, Elis; Saleh , La Mohamat; Gaspersz , Willem
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2245

Abstract

In project implementation, project completion often occurs that is not under planning both in terms of time, cost, and quality, as well as over budget, so to overcome this, good project management is needed in the form of time, cost, and quality control. on the New Classroom Construction Project for Madrasah Tsnawiyah Negeri 6 Central Maluku located in Liang Village, Kec. Salahutu, Kab. Central Maluku which has a budget of Rp. 2,998,745,000.00 with a planned implementation time of 126 calendar days from June to October 2022 but the realization of the project was late and was completed in 168 calendar days. To overcome this problem, the author uses the earned value method. The Earned Value method is a control method used to control project costs and time in an integrated manner. From the results of the last analysis in the 24th week, the work cost index (CPI) < 1, which means that the actual costs (ACWP) incurred were greater than the planned work costs (BCWP) so that the project experienced a cost deviation with a presentation of 0.92%. or 266,915,349.35 from the project budget, while for (SPI) the time performance index in the 18th week is <1, which means the project performance is slower than the planned schedule so that the project experiences a time deviation of 168 working days with an additional 42 working days from the scheduled implementation 126 working days so that the project was completed in the 24th week.
ANALISA KONDISI KERUSAKAN LAPISAN PERMUKAAN JALAN DESA SAKA – WAILULU SERAM UTARA BARAT KABUPATEN MALUKU TENGAH Purwanto, Hadi; Soumokil, Musper David; Sihasale, Stephanie Jenifer
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2272

Abstract

Highways are one of the supporting facilities for an area that can accelerate economic growth and development in that area. The highway in Saka - Wailulu Village is located on Jalan Taniwel - Saleman, one of the national roads in Maluku Province, Central Maluku Regency, North West Seram District. This research aims to determine the condition and type of road damage and determine the PCI value. The PCI method is a method that can assess the type of road pavement damage and the severity of the road. The results of the analysis of road conditions in Saka - Wailulu Village, Taniwel - Saleman Section using the PCI method showed an average PCI value of 72,375 with a verry good rating with 8 types of damage occurring, namely alligator cracking, potholes, block cracking, whaethering or raveling, patching and utility cut patching, joint reflection cracking, shoving and depression.
MANAJEMEN PEMELIHARAAN DAN PERAWATAN GEDUNG PADA RUMAH SAKIT PRATAMA KECAMATAN LEIHITU KABUPATEN MALUKU TENGAH Ole, Septiana; Lenora Leuhery; La Mohamat Saleh
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2281

Abstract

Research to analyze Building Maintenance and Maintenance Management at Pratama Hospital, Leihitu District, Central Maluku Regency, before the damage to buildings and fittings is heavier and disrupts services to the community, it is necessary to have good maintenance so that the planned technical life can be achieved. where there are 5 components, namely Structural, Architectural, Electrical, Mechanical and Outdoor Layout. The study was conducted by distributing questionnaires, the data analysis technique used was SPSS 26 software. Data analysis starts with validity tests and reliability tests with statistical descriptive analysis methods. This research was conducted to determine the assessment of building users and the implementation of building maintenance and maintenance. From the results of the analysis conducted on building user ratings, descriptive analysis showed that of the 30 respondents and 3 categories with the highest frequency. Based on structural variables, 15 people rated "good enough" architectural variables, 21 people rated "good enough", electrical variables 20 people rated "good enough, mechanical variables 21 people rated "good enough", outdoor spatial variables 20 people rated "good enough", and housekeeping variables 21 people rated "good enough". It is known that the results of the implementation of building maintenance and maintenance based on the category with the highest percentage, namely the "good enough" category, including 50% structural variables.
PASAK KAYU SEBAGAI BAHAN ALTERNATIF ALAT SAMBUNG PADA KONSTRUKSI KAYU Gunawan, Firman; Roberth, Herry Henry; Picauly, Fredy
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2314

Abstract

Pegs are a connecting tool in wood construction that is used as the main material to connect wooden beams with one another wooden beam so that they can be strengthened and united. One of the woods that will be made pegs is merbau wood which is found in Maluku. The research method used is an experimental method carried out through an experiment to obtain information on an object of research. This research was conducted at the Laboratory of the Department of Civil Engineering of Ambon State Polytechnic. The number of specimens used is 9 pieces with a peg diameter of 15 mm and variations in pedestal widths of 20 mm, 30 mm and 40 mm totaling 3 pieces each. Of the three variations of test specimens, there is an average maximum load on each test specimen, namely for a 20 mm pedestal of 15000 N, test specimen 2, a 30 mm pedestal of 16500 N and test specimen 3, a 40 mm pedestal of 17166.67 N and the average shear strength produced is, 42.46 Mpa at a pedestal thickness of 20 mm, 46.71 Mpa for wood thickness of 30 mm,  and 48.59 Mpa for 40 mm wood thickness.
ANALISA FAKTOR PENYEBAB DAN AKIBAT PERUBAHAN KONTRAK PEKERJAAN (CONTRACT CHANGE ORDER) PADA PROYEK PEMBANGUNAN GEDUNG INSTALASI RAWAT INAP 2 RSUD MAREN Hi. NOHO RENUAT KOTA TUA Lestaluhu, Damayanti; Saleh, La Mohammat; Titaley, Henriette Dorothy
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2359

Abstract

Construction projects often encounter problems such as changes occurring during implementation. These changes may occur in the early, middle, or late stages of the project. Hanna AS (2002) defines a change or change order (CO) in a construction project as an event leading to a change. In this study, the author uses the SmartPLS 4.0 application for data analysis techniques. SmartPLS 4.0 has an outer model/measurement model and an inner model/structural model to test the degree of validity and reliability of the indicators of the variables used in the study and also to determine the impact of relationships between each variable used in the study. Loading factor values for each indicator exceeded 0.6 and AVE values for each variable exceeded 0.5 in the convergence validity test of this study. For the discriminant validity tests, the cross-loading score and the Fornell-Larcker score meet the SmartPLS 4.0 requirements, and the HTMT score for each variable is less than 0.9. The R² test (r-squared) gave an R² value of ≥ 0.75 (75%). On the other hand, the path coefficient test yields a significance value (P-value) for the effect between variables of 0.05 or less for an alpha value of 5%. It can be said that the variables used in this study are valid and there are strong relationships between the test variables.
PENENTUAN PARAMETER GELOMBANG LAUT BERDASARKAN DATA ANGIN YANG MENGACU PADA ECMWF (EUROPEAN CENTRE FOR MEDIUM-RANGE WEATHER FORECAST) DIPERAIRAN DUSUN WAEYOHO, DESA KAWA, KAB. SBB Saharti; Lilipory, Isak; Pattiselanno, Steanly R. R.
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2389

Abstract

In West Seram Regency, precisely in Waeyoho Hamlet, Kawa Village, which has an area of ​​20 hectares / 0.2 Km2 with a coastline length of 2 Km, is one of the places where most of the people earn their income from sea products (fishermen), where when they go out in the morning or in the afternoon then we will return to land the next day. Seeing this situation, when we are going to carry out shipping activities, of course, we need daily weather information such as wave height from strong winds that occur in the middle of the sea. Prediction of wave parameters using the wind data approach method taken from ECMWF (European Center for Medium-range Weather Forecast) data. Wind data obtained at the research location in the waters of Waeyoho Hamlet, Kawa Village, Sbb Regency, Maluku in 2023 throughout January - October has a dominant northwest wind direction with a wind speed of 11.10 m/s, based on the monthly wind speed graph. The highest wind speed was obtained in May, July, August, and September, the relationship between wind speed on land and at sea was obtained by the value RL = 1.1 and the value Uw = 12.21 m/s, the wind stress factor (Ua) was obtained 15, 41 m/s, The average effective fetch value from the research location was 346.03 Km. Forecasting deep sea waves with limited fetch conditions, the value Hmo= 4.63m Tm=10.89 s, t=19.8 hours was obtained
IDENTIFIKASI DAN PENILAIAN KONDISI PADA JEMBATAN WAI POHON PULE I DAN JEMBATAN WAI POHON PULE II KOTA AMBON Tetiray, Jondri; Roberth, Herry Henry; Soumokil, Musper David
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2467

Abstract

Bridges are a means of transportation that have a significant role in the smooth traffic movement. Where the function of a bridge is to connect transportation routes that are separated by rivers, swamps, lakes, straits, canals, highways and other crossings. Because the role of bridges is very important, it is necessary to evaluate the feasibility of the bridge. This research aims to analyze the damage level to the Wai Pohon Pule I and Wai Pohon Pule II Bridges in Ambon City based on the standard Bridge Management System (BMS) assessment. From the research results, there was damage to the Wai Pohon Pule I Bridge and the Wai Pohon Pule II Bridge with the condition values ​​of the bridges being as follows, the Wai Pohon Pule I Bridge with the condition value of the bridge being 3 (Damage that requires immediate action), the Wai Pohon Pule Bridge II with the condition value of the bridge being 3 (Damage that requires immediate action).
PENGGUNAAN SAMPAH KARDUS DAN PEREKAT UNTUK PEMBUATAN BALOK 5/7 Manuhuttu, Maryo lois
Journal Agregate Vol. 3 No. 2 (2024): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i2.2509

Abstract

  Waste is one of the problems that continues to be handled to maintain environmental sustainability and health. According to the type, waste consists of 5 (five types), namely organic waste, inorganic, paper waste, toxic waste, and residual waste. In this study, what was used was waste. Cardboard waste is made into blocks, made with ledges of work steps starting from making formwork, measuring component components consisting of used cardboard, glue, and water, then continued with mixing these component components into specimens, and putting the specimens into the formwork, and waiting for time to open the cardboard blocks that have been printed from the formwork. The test carried out on this cardboard block is a flexural strength test, and after being tested the cardboard block produces excellent strength, so that cardboard blocks can and are easy to use as construction materials.  
TINJAUAN KEBUTUHAN DAN DISTRIBUSI AIR BERSIH DI AIR BESAR (ARBES) DESA BATU MERAH Natsir, Annisa Artika Diva; Lilipory, Isak; Hutubessy, Vector R. R
Journal Agregate Vol. 3 No. 1 (2024): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i1.2567

Abstract

Clean water is a source of life for every living creature, including humans who need drinking water and daily necessities. The aim of this final assignment is to determine the need for clean water for the community in Batu Merah Village, RT 004/ RW 017. Furthermore, to determine the capacity of water needs for the community at this time to find out the predicted increase in the population of RT 004 / RW 017 Air Besar Batu Merah Village and how much The RAB is large for community needs for the next 5 years (2023-2027). The data analysis technique used in this writing is a quantitative analysis method/technique, where the data needs to be calculated using mathematical calculations in Microsoft Excel software. The results of the analysis show that the water demand in Batu Merah Village RT.004/Rw 017, based on the analysis results obtained, is 164.64 m³/day. Meanwhile, the reservoir capacity is not able to accommodate water needs so the water is not enough for the needs of the people of RT 004/ RW 017 Air Besar Batu Merah Village. Water flow is carried out 24 hours per day, because the required discharge based on the calculation results is insufficient for the RT 004/ RW 017 Air Besar Batu Merah Village area. From the calculation results of the discharge requirement: 113.94 m3/day and the population for the next 5 years is: 1002 people with water requirements of: 135.27 m3/day, then the clean water requirement for RT 004/RW 017 is not sufficient for the next 5 years.