cover
Contact Name
Ikhwan Arief Purnama
Contact Email
ikhwanariefpurnama@gmail.com
Phone
+6281298555400
Journal Mail Official
Jurnal.Retensi.polnep@gmail.com
Editorial Address
Jl. Jenderal Ahmad Yani, Bansir Laut, Kec. Pontianak Tenggara, Kota Pontianak, Kalimantan Barat 78124
Location
Kota pontianak,
Kalimantan barat
INDONESIA
Retensi
ISSN : -     EISSN : 27750655     DOI : https://doi.org/10.31573/retensi
Core Subject : Engineering,
Retensi adalah Jurnal yang bertujuan untuk mempublikasikan artikel/paper yang didedikasikan untuk semua aspek perkembangan terkini yang luar biasa di bidang rekayasa teknik sipil. Redaksi akan menerima sumbangan artikel ilmiah dari para peneliti, pendidikan dan pemerhati masalah-masalah atau focus and scope dibidang struktur, jalan raya, jembatan, transportasi, geoteknik, manajemen kontruksi, serta material dan bahan bangunan.
Articles 10 Documents
Search results for , issue "Vol. 1 No. 2 (2021): Retensi" : 10 Documents clear
TINJAUAN PERENCANAAN MANAJEMEN PADA GEDUNG ASRAMA KESATUAN BRIGADE MOBIL DI KABUPATEN KUBU RAYA Nopriansyah, Nopriansyah Nopriansyah
RETENSI Vol. 1 No. 2 (2021): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i2.242

Abstract

In line with the increasingly rapid development and population growth which is increasing in Kubu Raya Regency, the need for facilities and infrastructure for the city government includes housing for Brimob personnel in accordance with the regional budget. So the Mobile Brigade Unit Dormitory Building was built in Kubu Regency. The method for completing this final project uses literature studies that use data, namely, secondary and primary data. After that, based on the processed data, including field layout drawings, documentation, field observation results. Project costs include, Calculating Volume, Determining Unit Price Analysis, Calculating (RAB). SMK3 includes, Planning work items, Classification and Control of Accident Risk, Determining the Appropriate PPE and GER. Time covers Job Weight, Dependency Table, Time Schedule (Barchart and NWP), making S Curve. Human Resources include: Calculating labor requirements, making labor requirements and job duration. The final result of the Project Quality Management is a Quality Checklist Table or Specifications for the Construction of the Car Brigade Unit Dormitory Building in Kubu Raya Regency. The results of the analysis of the Budget Plan (RAB) for the construction of this dormitory building are: Rp. 14,061,856,628.70 (Fourteen Billion Sixty One Million Eight Hundred Fifty Six Thousand Six Hundred Twenty Eight Comma Seventy Rupiah), as well as the calculation results of time requirements or the duration of development using the Network Planning (NWP) method, namely the NWP method get a work duration of 336 days, while using the Barchard method get a job duration of 14 months. The SMK3 in the Construction of the Dormitory Building is Personal Protective Equipment (PPE) consisting of 120 head protectors, 110 gloves, 110 protective glasses, 110 boots, 110 full body harnesses, 370 masks of safety shoes 10 pairs and 120 pieces of Vest. As for (APK) consists of. Signs 5 pieces, Line Volleyball 20 pieces, and Scapolding 50 sets. The final result of the Project Quality Management is the Quality / Specification Checklist Table for the Construction of the Dormitory Building for the Mobile Brigade Unit in Kubu Raya Regency and the Mutual Check 0% (MC 0%) whether it is appropriate or not
Perencanaan Manajemen Konstruksi Gedung Laboratorium Terpadu Institut Agama Islam Negeri Pontianak: Perencanaan Manajemen Konstruksi Gedung Laboratorium Terpadu Institut Agama Islam Negeri Pontianak Cahyo, Sigit Dwi; Syukriyansyah, Syukriyansyah; Asmadi, Asmadi; Sarpawi, Sarpawi
RETENSI Vol. 1 No. 2 (2021): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i2.243

Abstract

Manajemen Kontruksi adalah suatu proses atau Tindakan yang bertujuan menerapkan fungsi Perencanaan, Pelaksanaan dan Pengawasan agar tercapai tujuan proyek secara optimal. Kampus institute Agama. Islam. Negeri. Pontianak. demi menunjang penataan Infra-struktur dimana sebagai tujuan untuk peningkatan SDM, sarana prasarana, peningkatan pendidikan, pengajaran, penelitian, dan pengabdian kepada masyarakat, Maka kampus Institute. Agama.. Islam. Negeri. Pontianak. ingin membangun Gedung Laboratorium Terpadu Institut Agama. Islam. Negeri. Pontianak. merupakan tempat pendidikan bagi mahasiswa yang menempuh pendidikan“di Institut Agama Islam Negeri Pontianak.”Manajemen konstruksi menjadi solusi yang tepat agar tercapainya suatu perencanaan yang efektif dan efisien. Pada tulisan ini menyajikan Perhitungan dan Perkiraan biaya , waktu, SDM, mutu dan k3 untuk melaksanakan pembangunan Gedung ini. Biaya proyek Rencana Anggaran Biaya (RAB) diperoleh biaya sebesar Rp 13.576.291.000, Manajemen Waktu pada Proyek Didapat waktu dari Time Schedule selama 8 bulan atau 222 hari kerja dan dari CPM didapat 6 bulan 2 minggu atau 178 hari kerja, Manajemen Sumber Daya Manusia diperoleh Pendahuluan 20 pekerja, Pondasi 80 pekerja, Lantai 1 (75) pekerja, Lantai 2 (80) pekerja, Lantai 3 (60) pekerja, Lantai 4 (60) pekerja, Lantai 5 (60) pekerja, Lantai 6 (60) pekerja, Lantai 7 (60) pekerja, Atap (40) pekerja. Manajemen Mutu Proyek Tersusunnya RKS (Rencana Kerja Syarat-Syarat), Manajemen SMK3 Tersusunnya Klasifikasi dan Pengendalian Resiko pada pembangunan serta Perencanaan Alat Pelindung Diri (APD) dan Alat Pelindung Konstruksi (APK).
Perancangan Struktur Apartemen 15 Lantai Dengan Menggunakan Beton Bertulang di Jl.Jendral Ahmad Yani, Kota Pontianak,Kalimantan Barat Justitiannisa, Innino Nino
RETENSI Vol. 1 No. 2 (2021): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i2.254

Abstract

The increasing need for housing from year to year is increasing. The increase in population is the main factor and the availability of land is not supported. Based on the Pontianak City Spatial Plan 2013 - 2033, the land requirement for housing reaches 4580.31 hectares. Vertical development, namely apartments, aims to save land use and still be able to meet large numbers of residential needs. This apartment planning uses standards according to SNI 03-2847-2002 with the use of SAP 2000 software program. Site plan design, drawing desing and structural calculations in designing this apartement. This apartement design aims to produce apartement structures with reinforced concrete that are sturdy, safe, amda economical. Planning for this apartment starts from site plan planning, drawing design, spatial planning, floor slabs, internal forces, and foundation. In the preparation of this final project, quantitative methods are used, and primary and secondary data collection. The specifications for the construction of the apartment use reinforced concrete, using pile foundations, dak roofs, fc '30, and fy 400. 12 cm; 2 types of main beam and beam size, each measuring 55 cm x 45 cm, 50 cm x 40 cm, 45 cm x 35 cm, and 35 cm x 30 cm; 3 types of sizes, respectively 65 cm x 65 cm, 60 cm x 60 cm, and 50 cm x 50 cm; and 3 types of foundation with different number of piles, namely 9, 12, 20, and 24 pile points.
PLANNING OF CONSTRUCTION MANAGEMENT FOR THE IMPLEMENTATION OF 3 FLOOR FLAT HOUSE OF SEMINARI SANTA YOHANES MARIA VIANNEY KEUSKUPAN SINTANG, SINTANG DISTRICT, WEST BORNEO: Construction Management, Cost Management, Time, Human Resource, Quality, and Occupational Safety and Health, Sintang City. Tasari, Devi Devita; sari, Dhevita Maytika; fitriani, nurul
RETENSI Vol. 1 No. 2 (2021): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i2.256

Abstract

Sintang Region has few Catholic priests and does not have sufficient accomodation for the Catholic priesthood candidates. Therefore, a plan for a three floored Flat House of Santa Yohannes Maria Vianney Seminary of Sintang Diocese in Teluk Menyurai road, was proposed. It is expected that the seminary which may be built based on the plan, will be able to produce high quality Human Resources in Sintang Region expecially for the priesthood candidates and also to provide accomodation for them. Construction Management is a project processing process that includes planning, and organizing for purpose to be achived. To fulfill the requirements of Final Diploma 4 at State Polytechnic of Pontianak, we took the concept of Construction Management as a Final Project.Our Final Project includes Cost Management to find out the details of project costs in the form of a Budget Plan (RAB), Time Management to determine project duration in the form of S-curve and Critical Path Method (CPM), Human Resource Management to find out the needs of power workers in the form of a Tabel of The Needs of Power Workers, Quality Management to find out the specifications and provisions in the project structure that compile the specification table and Work Plan and Requirements (RKS),andOccupational Safety and Health (SMK3)Management to find the dangers and risks that may occur at the project in the form table of K3. In our plan, the SNI was applied to determine RAB and the result was Rp 7,791,782,000 and the build time needed was 120 days. The Human Resource per work item per day was also determined. This study also figured out the quality of the building structure, the risks and how to overcome and prevent the risks.
PENGGUNAAN ARANG TEMPURUNG KELAPA SEBAGAI BAHAN TAMBAH CAMPURAN BETON MUTU BETON Fc’ 14,53 MPa Syafyudin, Buyung Adnan; Rizal, rizal; Rusfiandi, wandi
RETENSI Vol. 1 No. 2 (2021): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i2.321

Abstract

Concrete is a construction material that has been commonly used for buildings. Concrete is formed from mixed aggregate (fine aggregate and coarse aggregate) plus other materials, namely cement, water, and other added materials with a certain ratio value. This study uses an added material in the form of coconut shell charcoal in a concrete mixture to determine whether it can improve the quality of the compressive strength of concrete. The uses of added material is taken from the percentage by weight of cement used. The use of coconut shell charcoal as an added ingredient is 2.5%, 5%, 7.5% and 10%. The results of the compressive strength of 28 days of concrete using coconut shell charcoal with a variation of the addition of 2.5% is 18.30 MPa, 5% is 17.86 MPa, 7.5% is 19.03 MPa, and 10% is 18.50 MPa. Based on the result above, the highest compressive strenght value is equal to 7.5%, so it can be concluded that the addition of coconut shell charcoal to the concrete mix can increase the compressive strength.
PERENCANAAN STRUKTUR BAJA PADA PEMBANGUNAN APARTEMEN 7 LANTAI DI JALAN PARIT H HUSIN II: PERENCANAAN STRUKTUR BAJA PADA PEMBANGUNAN APARTEMEN 7 LANTAI DI JALAN PARIT H HUSIN II rahmadani, rini; Miranda, Mia Amalia; Anggraini, irene
RETENSI Vol. 1 No. 2 (2021): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i2.389

Abstract

Having a place to live like an apartment is an alternative solution for the population that is not comparable to land for building a place to live. Steel has been used for a long time because of its advantages compared to other materials such as concrete. Steel structure planning refers to SNI 1729-2015 (Specifications for structural steel buildings), SNI 1727-2013 (Minimum load for designing buildings and other structures), PPPURG 1987 (Guidelines for loading planning for houses and buildings), SNI 1726-2019 (Earthquake Resistance Planning for Buildings and Non-Buildings) and others. The analysis was carried out with ETABS software, the calculation results obtained that the thickness of the floor plate was 9 cm, beam dimensions used IWF profiles 450.200.9.14, IWF 506.201.11.19, IWF 400.200.8.13, IWF 800.300.14.26, and IWF 700.300.12.24, column dimensions using H profiles 538.477.90.90, and the H profile 418.417.30.30. The structural connection is planned as a connection with high bolt quality, namely A325.
PERENCANAAN MANAJEMEN PADA STRUKTUR GEDUNG OPERASIONAL KOPERASI SIMPAN PINJAM CU PANCUR KASIH KECAMATAN PONTIANAK UTARA: PERENCANAAN MANAJEMEN PADA STRUKTUR GEDUNG OPERASIONAL KOPERASI SIMPAN PINJAM CU PANCUR KASIH KECAMATAN PONTIANAK UTARA vadila, putri agustin
RETENSI Vol. 1 No. 2 (2021): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i2.390

Abstract

In project implementation, a construction management plan is needed so that project implementation can be well planned and in accordance with the Indonesian National Standard (SNI). Therefore it is necessary to have construction management planning in the Construction of the Operational Building KSP CU Pancur Kasih, especially in building structure work, including Cost Management, Time Management, Human Resource Management (SDM), Occupational Health Safety Management (K3), and Quality Management where aspects are interconnected. The data sources used in the completion of this final project are secondary data and primary data. Based on the processed data, the final results include the Budget Plan (RAB), the Implementation Budget Plan (RAP), Time Schedule, Network Planning (NWP), Labor Needs, Mutual Check 0, Quality Checklist Table, Work Plan and Requirements, Personal protective equipment (APD) and work safety equipment (APK), which will be used as a reference or guidance and control in the implementation of development.
PERENCANAAN MANAJEMEN KONTRUKSI PADA PEMBANGUNAN HOTEL ARUNIKA DI KOTA PONTIANAK: PERENCANAAN MANAJEMEN KONTRUKSI PADA PEMBANGUNAN HOTEL ARUNIKA DI KOTA PONTIANAK khairi, reski dinata; dinata, reski dinata reski; Asmadi, Asmadi; Sarpawi, Sarpawi
RETENSI Vol. 1 No. 2 (2021): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i2.391

Abstract

Construction Management is a process or action that aims to implement planning, implementation and supervision functions in order to achieve optimal project objectives. The central government needs lodging facilities in order to accommodate existing tourists. One of them is a decent and strategic hotel. Pontianak City is the capital of West Kalimantan. To realize this development requires careful planning so that problems do not occur that can harm various parties. There are management planning stages that are useful for regulating the implementation process in order to achieve an effective and efficient planning. Construction management is the right solution to solve this problem. Overview The location of the hotel development planning that was investigated turned out to be a business area and close to vital buildings. The results of this plan are aimed at building a hotel building with the main structure of 5 floors in Southeast Pontianak. In this paper, it presents the calculation and estimation of costs, time, human resources, implementation methods to occupational safety and health to support the planning process for the construction of lodging facilities in the form of hotels in Pontianak City.
PERANCANGAN STRUKTUR BANGUNAN GEDUNG RUSUNAWA 4 LANTAI DI KOTA PONTIANAK: PERANCANGAN STRUKTUR BANGUNAN GEDUNG RUSUNAWA 4 LANTAI DI KOTA PONTIANAK rasiwan, rasiwan; putri, riananda; Syahrani, Deny
RETENSI Vol. 1 No. 2 (2021): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i2.392

Abstract

Rusunawa, which means "Simple Rental Flats", is a facility of simple residence with multi-storey buildings in order to save the increasingly narrow land use, due to community housing needs. The design of the 4-storey Rental Flats was made to reduce the problem of crowd population in the area of near the banks of the Kapuas River, Pontianak City. The 4-storey Rental Flats building was designed with a conventional reinforced concrete structure system. This structural system does not cost a lot more than precast concrete and composite steel structural systems. In addition, reinforced concrete structural systems have some advantages : durable and fire resistant, strong and sturdy, and low costs maintenance. The results of the 4-storey Rental Flats Building Structural Design include : the size of the floor slab thickness 12 cm and flat roof with 10 cm thick ; beam in dimensions of 35 cm x 70 cm, 25 cm x 50 cm, 20 cm x 40 cm, and 15.30 ; column with dimensions of 50 cm x 50 cm ; foundation with dimensions of 2 m x 4 m and 2 m x 2 meters.
PERENCANAAN MANAJEMEN KONSTRUKSI GEDUNG WISMA ATLET 5 (LIMA) LANTAI DI JALAN KARET KOTA PONTIANAK: PERENCANAAN MANAJEMEN KONSTRUKSI GEDUNG WISMA ATLET 5 (LIMA) LANTAI DI JALAN KARET KOTA PONTIANAK een, ajo; serra, een
RETENSI Vol. 1 No. 2 (2021): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i2.393

Abstract

Seiring dengan pembangunan yang semakin pesat dan pertumbuhan jumlah penduduk yang semakin meningkat di Kota Pontianak, maka kebutuhan sarana dan prasarana pemerintah kota meliputi peremajaan sarana dan prasarana dibidang olahraga sesuai dengan anggaran daerah tersebut. Maka dibangunlah Gedung Wisma Atlet 5 (lima) lantai di Jalan Karet Kota Pontianak Kalimantan Barat. Metode untuk menyelesaikan tugas akhir ini menggunakan studi literatur yang menggunakan data yaitu, data sekunder dan primer. Setelah itu berdasarkan data yang diolah, meliputi Gambar Layout lapangan, Dokumentasi, Hasil Observasi Lapangan. Biaya Proyek meliputi, Menghitung Volume, Menentukan Analisa Harga Satuan, Menghitung (RAB). SMK3 meliputi, Merencanakan Item pekerjaan, Klasifikasi dan Pengendalian Resiko Kecelakaan, Menentukan APD dan APK yang Sesuai. Waktu meliput Bobot Pekerjaan, Tabel Ketergantungan, Time Schedule (Barchart dan NWP), membuat Kurva S. Sumber Daya Manusia meliputi: Menghitung kebutuhan tenaga kerja, membuat kebutuhan tenaga kerja dan durasi pekerjaan. Hasil akhir dari Manajemen Mutu Proyek ialah Tabel Checklist Mutu atau Spesifikasi untuk Pembangunan Gedung Wisma Atlet 5 (lima) Lantai di Jalan Karet Kota Pontianak.Hasil dari Analisa Rencana Anggaran Biaya (RAB) pada pembangunan gedung wisma atlet Pontianak ini adalah sebesar : Rp 14,920,456,000.00 (Empat Belas Melyar Sembilan Ratus Dua Puluh Juta Enam Ratus Lima Puluh Enam Ribu Rupiah), serta hasil perhitungan kebutuhan waktu atau durasi pelaksanaan pembangunan menggunakan metode Network Planning (NWP) yaitu dengan metode NWP mendapatkan durasi pekerjaan 468 hari, sedangkan menggunakan metode Barchard mendapatkan durasi pekerjaan selama 15 bulan. Adapun SMK3 Pada Pembangunan Gedung Wisma Atlite 5 (lima) Lantai serta Alat Pelindung Diri (APD) terdiri dari pelindung kepala (Helem) 172 buah, Sarung Tangan 172 buah, Kacamata Pelindung100 buah, Sepatu Boots 170 buah, Body Harnes 50 buah, dan Rompi 170 buah. Adapun untuk (APK) terdiri dari. Rambu-rambu 5 buah, Jaring polynet 22 roll, dan Police line 3 roll. Hasil akhir dari Manajemen Mutu Proyek adalah Tabel Checklist Mutu / Spesifikasi untuk Pembangunan Gedung wisma atlet 5 (lima) lantai di jalan Karet Kota Pontianak, dan Muthual Check 0% (MC 0%) apakah telah sesuai atau belum sesuai.

Page 1 of 1 | Total Record : 10