cover
Contact Name
Veri Hardinansyah Dja'far
Contact Email
Proaksaraglobal@gmail.com
Phone
-
Journal Mail Official
Proaksaraglobal@gmail.com
Editorial Address
Bumi Royal Park Blok A-14, Jalan Kyai Parseh Jaya, Kelurahan Bumiayu, Kec. Kedungkandang, Kota Malang 65135, Malang, Provinsi Jawa Timur, 65135
Location
Kota malang,
Jawa timur
INDONESIA
International Journal of Social Science and Community Service
ISSN : -     EISSN : 30475406     DOI : https://doi.org/10.70865/ijsscs
The International Journal of Social Science and Community Service publishes a series of articles focused on community service initiatives in the area of economic empowerment. This journal aims to contribute ideas and reports on community service efforts, as well as serve as a platform for sharing these activities within the realm of community economic development. Its mission is to promote innovative concepts and research outcomes related to community service efforts. The journal primarily addresses key issues in the advancement of community service sciences, with particular emphasis on: Community Services, People, International Food Security, Training, Marketing, Appropriate Technology, Design, Community Empowerment, Social Access, Student Community Services, Border Regions, Less Developed Areas, and Sustainable Development Education.
Articles 269 Documents
Strengthening and Facilitating Community Groups of The Dewata Orchid Program to Address Agribusiness Issues of Siamese Tangerines in Air Talas Village, Muara Enim Regency, South Sumatra Catherine Wahyuning Wilujeng; Azahra Andriani
International Journal of Social Science and Community Service Vol. 2 No. 3
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Since the transmigration program to Air Talas Village, Muara Enim Regency, in 1987, the majority of the community has been cultivating Siamese tangerines (Citrus tangerina). As a result, this village is known as a producer of Siamese tangerines, with an annual production exceeding 300 tons. However, this high production has yet to be matched with good sales, leading to an oversupply and a decline in selling prices. The presence of Citrus Vein Phloem Degeneration (CVPD) disease poses a threat to tangerine production as it can degrade the quality of the fruit. This situation can reduce the income of farmers and women's groups processing Siamese tangerine derivative products. These conditions prompted the authors' team to initiate the Air Talas Tourism Village Agribusiness Program (Anggrek Dewata) to assist the village community in cultivating Siamese tangerines and marketing their processed products. In its second year, Anggrek Dewata is strengthening the beneficiary groups, namely the Tunas Hijau Farmers Group and the Subur Makmur Women's Farmers Group, to address the agribusiness issues of Siamese tangerines.
Financial Management Training As an Effort to Improve the Financial Performance of MSMEs at Pusat Glosir Cililitan (PGC) Yusbardini Yusbardini
International Journal of Social Science and Community Service Vol. 2 No. 3
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This community service project is titled "Financial Management Training as an Effort to Improve the Financial Performance of MSMEs Post-COVID-19 Pandemic." The general aim of this community service activity is to provide practical training and knowledge in financial management to enhance the financial performance of MSMEs in the future. The methods used include surveys and indirect (online) delivery of material, as well as discussions on financial management, techniques or strategies for improving financial performance, and the application of sound financial management practices. The conclusion of this community service project is that financial performance can be improved by maximizing the implementation of good financial management in daily activities, especially for MSMEs.
Evaluation of Drainage System on Public Road in Front of Sidoarjo Religious Court Office Class 1A Windya Yunesti Ernitasari; Budi Witjaksana; Andi Patriadi
International Journal of Social Science and Community Service Vol. 2 No. 3
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Flooding in front of the Sidoarjo Class 1A Religious Court Office road happens frequently during the rainy season. It disrupts traffic and damages the roads. Flooding is caused by the condition of the drainage channels, which are not performing efficiently due to sediment barriers such as garbage, and some channels appear to be damaged. The existing channels can no longer accommodate the water discharge caused by the rain, thus water overflows from the drainage channels, flooding the main road. These conditions show the importance of handling drainage problems. One of the ways that can be taken is to evaluate the capacity of existing drainage channels.In this study, the evaluation of drainage channel capacity was carried out using the Hydrological and Hydraulics Analysis method. The purpose of this study was to determine the amount of drainage channel storage capacity required to resolve flooding. The results of this study showed that the design rainfall obtained based on the Log Pearson Type III method was 116.583 mm/day with a 5-year return period. The design flood discharge in channel T1 was 0.717 m3/second, while the capacity of the existing tertiary channel T1 = 0.009 m3/second, so the discharge that overflows from the existing channel T1 was 0.708 m3/second. The capacity of the secondary channel S1 was 2.604 m3 /second, whereas the capacity of the primary channel P1 was 43.043 m3 /second. The capacity of the T1 channel was known to be unable to accommodate the design flood discharge. Therefore, alternative treatments were required to ensure that the T1 channel could accommodate the designed flood discharge.
Analysis of Contractual Based Construction Implementation and Self-Managed Construction Implementation Based on Community Empowerment Aki’ Suprapto; Esti Wulandari; Hanie Teki Tjendani
International Journal of Social Science and Community Service Vol. 2 No. 3
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This research aims to determine community empowerment-based self-management construction projects and contractual-based construction projects in Sumenep District, using the AHP (Analytical Hierachy Process) method. The AHP method is used to analyze the results of the questionnaire so that the weight value of the criteria and sub criteria can be known as the basis for selecting the implementation of construction activities. Based on the results of the analysis of alternative construction implementation contractual weight is 0.501 and community empowerment is 0.499. The implementation of contractual-based construction projects is preferred with consideration of a more organized implementation, both in time (time schedule) and regulations governing it such as sanctions and fines when there are obstacles in the field being part of the responsibility for the implementation of contractual-based construction. Contractual-based construction implementation tends to be more organized and in accordance with strict schedules and regulations, including sanctions and fines if there are obstacles in the field. In contrast, self-managed construction based on community empowerment, such as in the village fund program, often has leeway in terms of a longer implementation period and supervision carried out by the community itself, not by experts. Thus, stakeholders are expected to clarify the regulations governing which works are carried out in a self-managed manner and which works are carried out contractually in government programs.
Analysis of Investment Sensitivity in The Construction of The Gelora Bung Tomo Surabaya Circuit Leo Agus Sulistianto; Budi Witjaksana; Esti Wulandari
International Journal of Social Science and Community Service Vol. 2 No. 4
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Provision of Sports Prasarana is an attempt to fulfill the basic rights of the public to obtain services in sports activities, as listed in Law of the Republic of Indonesia Number 11 of 2022 concerning Sports 2022. The growing automotive industry is one important sector that significantly contributes to Indonesian economic growth. Based on the Surabaya City for 2021-2026 calls for the creation of an integrated area, with the Gelora Bung Tomo area serving as an international sports center and integrating with the growth of trade and service functions in Surabaya's surrounding areas. The aim of this study is to measure the amount of investment income and revenue limits in an effort to reduce the risks associated with the investment in the circuit. We carry out flow calculations using the Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), and Payback Period (PP) methods, and then analyze the sensitivity. We reviewed the sensitivity analysis based on several parameters, including commercial rent income and circuit management costs. The development of Tomo's Gelora Circuit is sensitive to a loss of income from the rental of business or commercial premises of 8%, which will affect a decline in profit, resulting in a negative net present value (NPV) and prolonging the rate of return. Additionally, it is sensitive to an increase in management costs by 12%.
The New Product Line Strategies in Maintaining the Sustainability of SMEs Rodhiah Rodhiah; Tara Clarissa; Valentina Valentina
International Journal of Social Science and Community Service Vol. 2 No. 3
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The role of product lines is very important in increasing the growth of SMEs. Through a variety of product lines sold, the problem of existing market saturation can be resolved, the emergence of new product lines can expand existing products. PKM activities aim to help MSMEs understand new product line strategies in running a business and maintaining survival in the future. The activity is engaged in a culinary business, with the Pempek Lita located in Jambi that provides various kinds of pempek. In its activities, it faces various problems, especially in carrying out product line strategies, this is due to the lack of knowledge about things related to product lines. For this reason, PKM programmes aim to help improve the business partners' knowledge. The method offered in this activity is online training/socialisation through Zoom meetings. The material to be delivered includes: basic introduction to product lines; product line strategies and others. The results of the activity show that the problems that arise in partner businesses will be resolved, partners can understand the importance of product line strategies for business sustainability.
Acceleration Cost Analysis with Critical Path Method Ade Sholeh Hartawan; Budi Witjaksana; Esti Wulandari
International Journal of Social Science and Community Service Vol. 2 No. 4
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In a construction project, preparation work typically includes tasks related to setting up work facilities, conducting field investigations, obtaining permits, and non-structural activities. The Jakarta Sewerage Development Project Zone 1, Package 2, which involves the construction of sewers in Area 1-1, is currently in the preparation phase and is experiencing challenges due to a complex permit process. This has led to minimal progress as the initial project planning did not consider the time needed to secure the necessary permits for implementation. The author is therefore evaluating the project timeline to gauge performance during the preparation phase before actual construction begins. This study utilizes the Critical Path Method (CPM) scheduling technique in Microsoft Project to pinpoint critical activities. Upon analysis, it was found that the budget plan for Package 2 of the Jakarta Sewerage Development Project (Zone 1) was detailed and included various work descriptions, with a total budget of IDR 862,292,086,196. However, delays have occurred, resulting in a 17-day setback in the project schedule, necessitating work acceleration. To bring the project duration back in line with the original schedule as per the contract, acceleration was required. This was carried out on the Shaft Construction C-8.1, which was initially set to take 80 days but was shortened to 63 days through time acceleration, incurring a cost of IDR 23,279,288.
Sensitivity Analysis of Revenue Potential in The Evaluation of East Surabaya Hospital Investment Arianti Widi Astasari; Wateno Oetomo; Sajiyo Sajiyo
International Journal of Social Science and Community Service Vol. 2 No. 4
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

As one of the largest cities in Indonesia, the City of Surabaya has an obligation to provide excellent health services for its residents. It goes without saying that Surabaya City Government is required to provide a General Hospital that can receive referrals from the government-owned Community Health Centers. For this reason, the Surabaya City Government built the East Surabaya Hospital which is located in Rungkut Sub-District. East Surabaya Hospital is a strategic project that requires investment feasibility analysis. The East Surabaya Hospital investment feasibility analysis was done by applying the Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PP) and Benefit Cost Ratio (BCR) parameters. After the feasibility analysis results were obtained, a sensitivity analysis was done on changes in management costs and the amount of health service levy rates for each Fees alternative. Based on the results of the investment feasibility analysis of 4 (four) Fees alternatives, there are 2 alternatives that can be concluded as worthy investments, which are alternative 1 and alternative 3. Meanwhile, alternative 2 and alternative 4 are not feasible since the NPV parameter shows negative values and the IRR value is lower than the MARR value. However, based on sensitivity analysis, alternatives 2 and 4 can be feasible if alternative 2’s service rate is increased by 13.2%, and alternative 4’s service rate is increased by 2.3%. The opposite applies in alternative 1 where the investment might become unfeasible if the service rate is reduced by more than 5.4% and alternative 3 might become unfeasible if the service rate is reduced by more than 2.5%.
Analysis of Cost and Time To Complete of Office Project with The Earned Value Method Linda Nailufar; Budi Witjaksana; Esti Wulandari
International Journal of Social Science and Community Service Vol. 2 No. 4
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The rescheduling of the initial schedule carried out on the Bahtera Elang Perak Indonesia Office Construction project has an impact on increasing the duration of work causing the project completion target to be delayed from the time it should be. Increasing the project completion target can affect the amount of costs incurred. The contract value for this office construction project is Rp. 13,908,226,157 with a work duration of 43 weeks to 54 weeks. The current condition of work progress at week 31 is -0.225% while the total actual cost or that has been incurred during the work is Rp. 3,191,740,254. To overcome this, an analysis is carried out on the value of the estimate at complete (EAC) and time estimate (TE) of the Surabaya BEPI Office Construction Project using the earned value method. This method combines the elements of cost, schedule, and work performance. The earned value method aims to determine the estimated cost and time of project completion. From the results of the analysis conducted in the 41st week, it was obtained that the estimated cost and time to complete the project implementation (EAC) was 14,289,833,105, - and the estimated time (TE) was 499 days, which was 121 days later than the original schedule.
Analysis of Road Damage Using the Bina Marga Method on the Lamongan City - Mojokerto Border Road Section Anang Mashudi; Haris Muhammadun; Risma Marleno
International Journal of Social Science and Community Service Vol. 2 No. 4
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Road as an important facility for the community to achieve a desired goal both mobilizing goods and services. On the Lamongan City – Mojokerto Regency Border Road Section of STA 20+000 - 26+000 based on the field has experienced a decrease in road services that are not stable / comfortable with a lot of damage to the road. This study aims to determine the priority order value of road surface damage based on the Bina Marga method, determine the handling of road maintenance and the cost of handling road maintenance based on the two methods. From the results of the research, the priority order value of road damage on the Lamongan City - Mojokerto Border Road Section of STA 20+000 - 26+000 with the Bina Marga method is the priority order value of road damage 5.5, this includes a periodic maintenance handling program, the cost of handling road maintenance with the Bina Marga method is Rp. 9,479,663,479.46.